Design and Review Process w w w. t r a n s p o r t a t i o n . o h - - PowerPoint PPT Presentation

design and review process
SMART_READER_LITE
LIVE PREVIEW

Design and Review Process w w w. t r a n s p o r t a t i o n . o h - - PowerPoint PPT Presentation

Design and Review Process w w w. t r a n s p o r t a t i o n . o h i o . g o v 1 What Should Be Reviewed, and When? w w w. t r a n s p o r t a t i o n . o h i o . g o v 2 Overview Alternative Evaluation Report Stage 1 Design Submittal


slide-1
SLIDE 1

w w w. t r a n s p o r t a t i o n . o h i o . g o v

1

Design and Review Process

slide-2
SLIDE 2

w w w. t r a n s p o r t a t i o n . o h i o . g o v

2

What Should Be Reviewed, and When?

slide-3
SLIDE 3

w w w. t r a n s p o r t a t i o n . o h i o . g o v

3

Alternative Evaluation Report Stage 1 Design Submittal Stage 2 Design Submittal Stage 3 Design Submittal Design Review Checklists ODOT Post-Construction Review Responsibilities

Overview

slide-4
SLIDE 4

w w w. t r a n s p o r t a t i o n . o h i o . g o v

4

Alternative Evaluation Report Stage 1 Design Submittal Stage 2 Design Submittal Stage 3 Design Submittal Design Review Checklists ODOT Post-Construction Review Responsibilities

Overview

slide-5
SLIDE 5

w w w. t r a n s p o r t a t i o n . o h i o . g o v

5

Alternative Evaluation Report (AER)

L&D Vol. 3, Section 1403.4.2 AER Components: Consider BMPs in setting construction limits Preliminary BMP selection and sizing

slide-6
SLIDE 6

w w w. t r a n s p o r t a t i o n . o h i o . g o v

6

Alternative Evaluation Report Stage 1 Design Submittal Stage 2 Design Submittal Stage 3 Design Submittal Design Review Checklists ODOT Post-Construction Review Responsibilities

Overview

slide-7
SLIDE 7

w w w. t r a n s p o r t a t i o n . o h i o . g o v

7

Stage 1 Design Submittal

L&D Vol. 3, Section 1403.5.3 Stage 1 Review Submission Components: “Final Post Construction Storm Water Best Management Practices (BMP) Design Calculations and documentation of any BMP implementation issues”

slide-8
SLIDE 8

w w w. t r a n s p o r t a t i o n . o h i o . g o v

8

Stage 1 Design Submittal

L&D Vol. 2, Section 1116.2 BMP Submittals; include the following information in the submittal: Estimated Project Earth Disturbed Area Treatment Percent Calculation BMP selected Drainage area mapping

Total contributing area to BMP Contributing area within ODOT right-of-way

Plan sheets showing locations of BMPs Calculations for each BMP Explanation of any area that is not treated

slide-9
SLIDE 9

w w w. t r a n s p o r t a t i o n . o h i o . g o v

9

Alternative Evaluation Report Stage 1 Design Submittal Stage 2 Design Submittal Stage 3 Design Submittal Design Review Checklists ODOT Post-Construction Review Responsibilities

Overview

slide-10
SLIDE 10

w w w. t r a n s p o r t a t i o n . o h i o . g o v

10

Stage 2 Design Submittal

BMP details in plan sheets (ODOT PDP) Incorporate comments from Stage 1

slide-11
SLIDE 11

w w w. t r a n s p o r t a t i o n . o h i o . g o v

11

Alternative Evaluation Report Stage 1 Design Submittal Stage 2 Design Submittal Stage 3 Design Submittal Design Review Checklists ODOT Post-Construction Review Responsibilities

Overview

slide-12
SLIDE 12

w w w. t r a n s p o r t a t i o n . o h i o . g o v

12

Stage 3 Design Submittal

L&D Vol. 3, Section 1403.9.2 Stage 3 Detailed Design Activities:

Preparation of the Project Site Plan

Project Site Plan: L&D Vol. 3 Section 1308

Includes many pieces of information showing NPDES permit compliance

slide-13
SLIDE 13

w w w. t r a n s p o r t a t i o n . o h i o . g o v

13

Project Site Plan

Project EDA Contractor EDA NOI EDA Name and location of receiving streams, surface waters, wetlands, and jurisdictional ditches Existing contours (drainage patterns) Flow arrows indicating proposed drainage patterns Culverts, storm sewers, and catch basins Post construction BMP information

slide-14
SLIDE 14

w w w. t r a n s p o r t a t i o n . o h i o . g o v

14

Project Site Plan

Post construction BMP information:

Show and label all BMPs on plan sheet Include BMP information in a table

  • Lat. and long of each BMP

Beginning and end position for linear BMPs Outlet position for other BMPs

EDA treatment credit for each BMP Width for linear BMPs

slide-15
SLIDE 15

w w w. t r a n s p o r t a t i o n . o h i o . g o v

15

Project Site Plan

Sample Project Site Plan: SP 1308-1

slide-16
SLIDE 16

w w w. t r a n s p o r t a t i o n . o h i o . g o v

16

AER Stage 1 Stage 2 Stage 3

  • Prelim. BMP Sizing

BMP Treat. Credit BMP lat. and long. BMP Calcs. Project EDA Project Site Plan Final BMP Sizing Drainage Areas

  • Prelim. Space for BMP
  • Prelim. BMPs ID’ed
  • Treat. Needs vs.

Treatment Credit Treatment % BMP Detail Sheets BMP Trib. Area

slide-17
SLIDE 17

w w w. t r a n s p o r t a t i o n . o h i o . g o v

17

Alternative Evaluation Report Stage 1 Design Submittal Stage 2 Design Submittal Stage 3 Design Submittal Design Review Checklists ODOT Post-Construction Review Responsibilities

Overview

slide-18
SLIDE 18

w w w. t r a n s p o r t a t i o n . o h i o . g o v

18

Design Review Checklists

slide-19
SLIDE 19

w w w. t r a n s p o r t a t i o n . o h i o . g o v

19

Manufactured System

slide-20
SLIDE 20

w w w. t r a n s p o r t a t i o n . o h i o . g o v

20

Vegetated Filter Strip

slide-21
SLIDE 21

w w w. t r a n s p o r t a t i o n . o h i o . g o v

21

Vegetated Biofilter

slide-22
SLIDE 22

w w w. t r a n s p o r t a t i o n . o h i o . g o v

22

Extended Detention

slide-23
SLIDE 23

w w w. t r a n s p o r t a t i o n . o h i o . g o v

23

Bioretention

slide-24
SLIDE 24

w w w. t r a n s p o r t a t i o n . o h i o . g o v

24

Alternative Evaluation Report Stage 1 Design Submittal Stage 2 Design Submittal Stage 3 Design Submittal Design Review Checklists ODOT Post-Construction Review Responsibilities

Overview

slide-25
SLIDE 25

w w w. t r a n s p o r t a t i o n . o h i o . g o v

25

Review Responsibilities

ODOT Let

Quality vs. Quality/Quantity treatment Treatment % Treatment area required Drainage area to each BMP ODOT R/W to each BMP WQV or WQF calculations Consistent with all L&D requirements

slide-26
SLIDE 26

w w w. t r a n s p o r t a t i o n . o h i o . g o v

26

Review Responsibilities

Local Let

Is a BMP required? Quality vs. Quality/Quantity treatment required? Is a BMP provided? Local holds NPDES permit and responsibility

slide-27
SLIDE 27

w w w. t r a n s p o r t a t i o n . o h i o . g o v

27

Local-Let Review Checklist

slide-28
SLIDE 28

w w w. t r a n s p o r t a t i o n . o h i o . g o v

28

Updates from Construction General Permit

Larger WQV Larger WQF for manufactured systems Retention basin storage larger

2018: 75% below and 75% above 2019: 100% below and 100% above

Stage 2 submittal before Jan. 31, 2019

Current Design

After: larger WQV and WQF

slide-29
SLIDE 29

w w w. t r a n s p o r t a t i o n . o h i o . g o v

29

Updates from Construction General Permit

What about volume reduction in new CGP? Allowed by Ohio EPA Unclear how they would be applicable

  • n roadway projects

ODOT OHE must approve any use of runoff reduction methods

slide-30
SLIDE 30

w w w. t r a n s p o r t a t i o n . o h i o . g o v

30

Questions ?

Jon Prier, P.E. jonathan.prier@dot.ohio.gov 614-644-1876