Demand Connection Code - Update Place your chosen image here. The - - PowerPoint PPT Presentation

demand connection code update
SMART_READER_LITE
LIVE PREVIEW

Demand Connection Code - Update Place your chosen image here. The - - PowerPoint PPT Presentation

Demand Connection Code - Update Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Dwayne Shann JESG 13 June 2012 Agenda


slide-1
SLIDE 1

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

Demand Connection Code - Update

Dwayne Shann JESG – 13 June 2012

slide-2
SLIDE 2

2

Agenda

Call for Evidence - Responses Upcoming Consultation Upcoming Stakeholder Engagement AOB

slide-3
SLIDE 3

3

Responses High Level Overview

General DSR DSR SFC Need Voltage Frequency Reactive Power Exchange

slide-4
SLIDE 4

4

Speaker Notes

This is the high-level summary of the Call for Evidence Responses produced by ENTOS-E The analysis is divided across the individual areas

  • utlined in the Call for Evidence

Further detail will be provided in the consultation pack

  • f the Formal Consultation.
slide-5
SLIDE 5

5

Call for Evidence – Responses Breakdown

21 organisations (7 UK) provided feedback: Energy suppliers, DSOs, industry customers, DSR providers & manufactures of domestic appliances. UK organisations / companies: ENW, SPD, UKPN, WPD, EDF Energy, Renewable UK & SSE Generation. Assessment of content: Mixed responses from full support to out-right rejection. No alternative CBAs provided or significant alternative data.

slide-6
SLIDE 6

6

Key Activities

ENTSO-E is now finalising the code prior to issue for Formal Consultation: Consultation scheduled to run from 30 June – 3 September Papers can be downloaded and responses to consultation via the ENTSO-E website:

https://www.entsoe.eu/resources/consultations/

JESG Technical Secretary will circulate further links

slide-7
SLIDE 7

7

Consultation Pack

The Consultation Pack will include:

Draft Demand Connection Network Code Explanatory note, covering: Evaluation of feedback on stage 1 Spreadsheet – full raw feedback Further Cost Benefit Analyses Frequently Asked Questions

slide-8
SLIDE 8

8

Stakeholder Engagement

ENTSO-E workshop

8 August, Brussels

JESG DCC Workshops

16 July – 10:30 – 17:00 17 July – 09:00 – 12:00 The Saxon Mill, Warwick

What would GB Stakeholders like to be presented at the July Workshop? These dates are subject to Review; please consult JESG Calendar on website