decommissioning of max lab
play

Decommissioning of MAX-lab Magnus Hrling 9 th International Workshop - PowerPoint PPT Presentation

Decommissioning of MAX-lab Magnus Hrling 9 th International Workshop on Radiation Safety at Synchrotron Radiation Sources April 19-21, 2017 Taiwan Photon Source, Hsinchu, Taiwan Outline Facility Description Objective & Conditions


  1. Decommissioning of MAX-lab Magnus Hörling 9 th International Workshop on Radiation Safety at Synchrotron Radiation Sources April 19-21, 2017 Taiwan Photon Source, Hsinchu, Taiwan

  2. Outline ● Facility Description ● Objective & Conditions ● Regulations ● Approach ● Phase 1 - Radiological Characterization ● Phase 2 - Dismantling & Radiological Clearance ● Outcome & Costs Decommissioning of MAX-lab / Outline

  3. Facility Description

  4. Facility Description (1/4) ● Former Swedish national laboratory for accelerator development, synchrotron light and nuclear physics research ● The history of MAX-lab dates back to the early 80’s ● About 1000 users per year Decommissioning of MAX-lab / Facility Description

  5. Facility Description (2/4) Injector ● Microtron 95 MeV 1984-2002 ● Linac 200/400 MeV 2001-2015 MAX I ● Ø 32 m 200/550 MeV 1986-2015 MAX II ● Ø 90 m 1500 MeV 1996-2015 MAX III ● Ø 36 m 700 MeV 2007-2015 Nuclear physics ● Prolonged runs at 10 Hz using MAX I as a pulse-stretcher ● Significant losses in the injector and MAX I Decommissioning of MAX-lab / Facility Description

  6. Facility description (3/4) MAX I MAX III MAX II Injector Nuclear physics Decommissioning of MAX-lab / Facility Description

  7. Facility Description (4/4) Decommissioning of MAX-lab / Facility Description

  8. Objective & Conditions

  9. Objective & Conditions (1/2) Objective: ● Building to be emptied and returned to the landlord ● Building to be “cleared for free use” – i.e. no longer subject to the terms and requirements of the Radiation Protection Act Physical conditions: ● Local decay storage not an option ● No dedicated or suited space for decay storage on the MAX IV property ● Alternate solutions for decay storage were briefly considered, but decided not to be an option ● → 3 rd objective: Disposal of activated material Decommissioning of MAX-lab / Objective & Conditions

  10. Objective & Conditions (2/2) Time constraints: ● Facility to remain in operation until mid December 2015 ● Dismantling to start immediately after shutdown ● Goal for (physical) completion set by the management to the summer of 2016 Budget: ● Total budget: 1500 k€ ● Estimated radiological cost: 650 k€ Decommissioning of MAX-lab / Objective & Conditions

  11. Regulations

  12. Regulations The Swedish requirements for radiological clearance procedures are given by the regulatory code SSMFS 2011:2. ● Nuclide specific clearance levels (Bq/g or kBq/m 2 ) ● Generally harmonized to levels in related EC RP publications ● Before any clearance, a control program has to be notified to the authority ● Decisions on the clearance of buildings are taken by the authority on application by the licensee Decommissioning of MAX-lab / Regulations

  13. Approach

  14. Approach Given the time frame, personnel resources, legal requirements and lack of space the implementation of a comprehensive measuring and clearance program within the organization was not considered feasible. The decision was made to hire a contractor specialized in the field of radiological decommissioning and radioactive waste management. The radiological decommissioning was divided into two phases. Decommissioning of MAX-lab / Approach

  15. Phase 1 – Radiological Characterization

  16. Phase 1 - Radiological Characterization (1/5) The characterization - performed during the first half of 2015 - included: ● Summary of operating history ● Risk categorization of rooms and material ● Inventory and marking, database – ~800 objects/sections/surfaces ● Pulse and dose rate measurements ● Sampling of concrete and metal ● Determination of nuclide vectors Decommissioning of MAX-lab / Phase 1 – Radiological Characterization

  17. Phase 1 - Radiological Characterization (2/5) Risk categorization of rooms and material: ● Initially based on operating history and facility knowledge ● Protected (and normal) areas deemed Extremely Low Risk (~6700 m 2 ) ● Conservative approach for controlled areas (~1500 m 2 ) Decommissioning of MAX-lab / Phase 1 – Radiological Characterization

  18. Phase 1 - Radiological Characterization (3/5) Risk categorization of rooms and material: ● Pulse rate measurements used primarily to confirm initial categorization ● Results allowed for modifications of the categorization (less conservative) – mainly exclusion of stands in MAX II and MAX III and recategorization of less critical room surfaces Decommissioning of MAX-lab / Phase 1 – Radiological Characterization

  19. Phase 1 - Radiological Characterization (4/5) General categorization of controlled areas and material inside. Injector, MAX I and Nuclear Physics BL: Above Clearance Level ● Vacuum system, magnets etc Risk Low Risk ● Other equipment, incl. stands Extremely Low Risk ● Room surfaces MAX II and MAX III: ● Vacuum system ● Magnets, incl. IDs etc ● Stands and peripheral equipment ● Room surfaces Decommissioning of MAX-lab / Phase 1 – Radiological Characterization

  20. Phase 1 - Radiological Characterization (5/5) Determination of nuclide vectors Radionuclides measured in samples and average ratios to 60 Co ● Sampling of concrete, wall filling Concrete Wall Filling Material Steel material and activated metal Co-60 1,0E+00 Co-60 1,0E+00 Co-60 1,0E+00 Na-22 1,1E+00 Mn-54 1,9E+00 Sc-46 1,6E-01 ● Large uncertainties Sc-46 1,9E-01 Zn-65 8,2E-01 Cr-51 1,6E+01 Mn-54 4,0E-01 Cs-134 3,7E-01 Mn-54 3,4E+01 ● Concrete samples showed induced Co-58 1,0E+00 Eu-152 1,6E+00 Co-56 2,4E+00 Cs-134 3,8E-01 Co-57 4,8E+01 activity, but only up to ~ 60% of the Cs-137 2,9E-01 Co-58 2,2E+00 Eu-152 2,1E+00 Fe-59 1,8E-02 clearance level Eu-154 5,2E-01 Y-88 5,0E-02 ● For all concrete samples, the naturally Eu-155 6,8E-01 Zn-65 2,1E-02 Nb-95 2,6E-01 occurring radionuclides (mainly 40 K and 232 Th) still dominated the activity content Decommissioning of MAX-lab / Phase 1 – Radiological Characterization

  21. Phase 2 – Dismantling & Radiological Clearance

  22. Phase 2 – Dismantling & Radiological Clearance (1/7) Dismantling began with categorized material in controlled areas in January 2016. ● Dismantling ● Separation & Sorting ● Packaging ● Registration (contractor’s data base) ● Shipping to contractor’s site A separate contractor, hired for general dismantling and demolition of (the rest of) the facility started work two months later. Decommissioning of MAX-lab / Phase 2 – Dismantling & Radiological Clearance

  23. Phase 2 – Dismantling & Radiological Clearance (2/7) Bulk shielding of the injector, nuclear physics and parts of MAX I: ● Walls of 2-3 m thickness ● Made out of gravel including stones of varying sizes, supported by corrugated metal and beams ● ~800 m 3 of concrete like mass ● Probably a great idea back in the day… ● Turned out to be very challenging (and costly) to remove Decommissioning of MAX-lab / Phase 2 – Dismantling & Radiological Clearance

  24. Phase 2 – Dismantling & Radiological Clearance (3/7) Bulk shielding of the injector, nuclear physics and parts of MAX I: ● Innermost 40 cm of the wall filling material were separated for clearance measurments ● Filled into big-bags and measured ● When the innermost parts had been separated and removed, the remaining masses could be dealt with in a less delicate way Decommissioning of MAX-lab / Phase 2 – Dismantling & Radiological Clearance

  25. Phase 2 – Dismantling & Radiological Clearance (4/7) Local clearance of material: ● Concrete blocks and wall filling material was not shipped to the contractor – measured for clearance at MAX-lab ● Dedicated measuring station set up by the contractor (NaI probes) ● 60 Co content quantified and nuclide vector applied ● < 1000 kg material per measurement ● Formally cleared by MAX-lab (control program notified to authority) Decommissioning of MAX-lab / Phase 2 – Dismantling & Radiological Clearance

  26. Phase 2 – Dismantling & Radiological Clearance (5/7) Clearance measurements of concrete bulk shielding and room surfaces: ● Rooms completely emptied ● HPGe equipment, collimated ● Low Risk – one measurement per surface, critically chosen area ● Risk – measurements in a 1 x 1 m 2 grid ● 5 m 2 measured at once when practical ( t m increased accordingly) Decommissioning of MAX-lab / Phase 2 – Dismantling & Radiological Clearance

  27. Phase 2 – Dismantling & Radiological Clearance (6/7) Demolition of bulk shielding: ● Could start when the data from the clearance measurements had been analyzed ● Cast concrete was segmented by circular cutting and wire sawing ● None of the bulk shielding concrete could leave MAX-lab until the decision by the authority on the clearance of the building was received Decommissioning of MAX-lab / Phase 2 – Dismantling & Radiological Clearance

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.