decision on proposed transmission access charge area
play

Decision on proposed transmission access charge area Deb Le Vine - PowerPoint PPT Presentation

Decision on proposed transmission access charge area Deb Le Vine Director, Infrastructure Contracts & Management ISO Board of Governors General Session May 1 - 2, 2017 ISO Confidential Issue is allocation of local resource adequacy


  1. Decision on proposed transmission access charge area Deb Le Vine Director, Infrastructure Contracts & Management ISO Board of Governors General Session May 1 - 2, 2017 ISO Confidential

  2. Issue is allocation of local resource adequacy • The Metropolitan Water District of Southern California’s (MWD) Service and Interchange agreement with SCE terminates September 30, 2017 • MWD is uniquely situated and does not use SCE’s transmission system to serve its load • Under the SCE agreement MWD’s resource adequacy was covered by SCE • Termination of the SCE agreement necessitates that the ISO and MWD address resource adequacy requirements • Creating a new TAC area for MWD to allocate local resource adequacy is consistent with cost causation Slide 2 ISO Confidential

  3. MWD TRANSMISSION SYSTEM Western Area Power LAKE MEAD NEVADA Administration (WAPA ) HOOVER CALIFORNIA Mead MWD 230 kV TRANSMISSION LINES OTHER 230 kV TRANSMISSION LINES Camino Colorado OTHER 161 kV TRANSMISSION LINES Switching ARIZONA River Station SCE RETAIL LOADS LAKE HAVASU INTAKE Western Area GENE Power Administration IRON (WAPA) PARKER Colorado MOUNTAIN River Aqueduct EAGLE WAPA Blythe MOUNTAIN HINDS SCE Page 3 ISO Confidential

  4. Creation of TAC areas generally • Appendix F, Schedule 3, Section 3.7 of ISO tariff allows the Board to create TAC areas – Original intent of TAC areas was the allocation of the transmission access charge – Once the transmission access charge was fully integrated, the term should have been retired in 2011 • When resource adequacy was created, TAC area was used as the basis for allocation of local resource adequacy costs because of the symbiotic relationship for transmission services between IOUs and other utilities – MWD does not have this relationship with SCE for the Colorado River Aqueduct Page 4 ISO Confidential

  5. Management recommends the Board create a separate TAC area for MWD for the purpose of resource adequacy requirements. • Benefits of MWD staying in the ISO BA – The market may continue to use the excess transmission capacity on MWD’s system at Mead and Parker – Using their own transmission system MWD will meet all the resource adequacy requirements with resources delivered to their own system • Impacts of new TAC Area – De minimus increase in local resource adequacy requirement for the remaining 32 load serving entities in the SCE TAC Area • No stakeholder opposition to the proposed change Slide 5 ISO Confidential

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.