Darwin Green Darwin Green Introducing the team BDW Homes Cambridgeshire Division David Rix Technical Project Manager Justice Nyakatawa Planner INFRASTRUCTURE WORKS Infrastructure Works Infrastructure Works Works progress well including:
Darwin Green – Introducing the team
BDW Homes Cambridgeshire Division David Rix – Technical Project Manager Justice Nyakatawa – Planner
INFRASTRUCTURE WORKS
Infrastructure Works
Infrastructure Works
Works progress well including:
- Main arterial routes through the site are now complete to
base course level.
- Main arterial road drainage works are 100% complete
- Strategic services pipework is installed across the site.
- Earthworks to central park on-going at a minor level.
- Temporary haul road connection is now complete. All
construction traffic is via Histon Road.
- Application for the Histon Road utility compound is being
made to allow electrical energising of the site.
- Temporary access for the Public Right of Way is complete,
application to close the old path will commence.
Infrastructure Works
Central Park and earth works looking north towards Histon Rd
Infrastructure Works
Main spine road now links up with Histon Road to the North
Darwin Green One – BDW1
BDW1 – First Residential Phase
PROGRAMME
- R & S completed
- Foundations to Residential units
commenced and 75% complete
- Marketing Suite will be formed in first
apartment block with an adjacent car park and show home
- Sales Launch anticipated in Later Summer
2018
BDW1 – First Residential Phase
PROGRAMME
- Adoptable road & sewers completed
- Private drainage completed
- Foundations 100% complete
- House roofs 100% complete
- Apartment roofs on-going on main route
BDW1 – First Residential Phase
PROGRAMME
- Other blocks brickwork at 2nd lift with
floors being installed.
BDW1 – First Residential Phase
APARTMENT BLOCK & MARKETING SUITE
- Marketing Suite is formed in
first apartment block with an adjacent car park and show home
- Sales Launch anticipated in
March 2019
BDW1 – First Residential Phase
STREETSCENE (Rear)
- BDW1 WEST
BDW1 – First Residential Phase
STREETSCENE (Proposed)
- BDW1 EAST
Darwin Green One – Local Centre
Local Centre
Local Centre will consist of the following:
- 114 residential apartments of which 40%
will be affordable.
- Library
- Community Rooms
- Health Centre
- Retail Units – Use Classes A1, A2, A3, A4
and A5 Preparing information to submit pre- commencement planning conditions Anticipate commencing foundation in July 2018
BDW1
Local Centre
Local Centre will consist of the following:
- 114 residential apartments of which 40%
will be affordable.
- Library
- Community Rooms
- Health Centre
- Retail Units – Use Classes A1, A2, A3, A4
and A5 Preparing information to submit pre- commencement planning conditions Foundations & drainage complete Concrete frame complete Steel frame to commence March 2019
Next Phase: Planning
BDW2 – Pavilion Quarter [Immediate Context]
Views of The Square
BDW2 – Pavilion Quarter
Views of The Square Discussions with the Council underway in respect of the next phase, BDW 2, comprising:
- A mixture of circa 320 plots with
40% Affordable Housing
- Allotments
- 2 x Local Area of Play (LAP)
- Local Equipped Area of Play
(LEAP)
- The Cricket Pavilion building
- Drainage Ditch behind the
pavilion building along the eastern boundary Target Submission: July 2019.
BDW2 – Parameter Plan [Building Heights]
Views of The Square Building heights are regulated by the parameters plan approved at Outline stage Basically, dwellings backing on to the built up areas will be up to 2 storeys high (max height 9.7m)
BDW2 – Parameter Plan [Access]
Views of The Square The parameter plan stipulates the street hierarchy across the site. The plan also shows the key cycle and pedestrian networks and how they link with the adjoining developments.
BDW2 – Parameter Plan [Landscape]
Views of The Square The main green corridors on the site are also approved. These comprise:
- Hedgegrow to be retained
- Hedgegrow to be retained
with access gaps
- Proposed landscape
corridor and open space (including SUDs)
- Landscaped Drainage Area
in the North
Communication
We are updating the website to include user friendly features, including links to the newsletters, any new updates, sales, etc. For now, please follow the link below for any updates:
http://www.darwingreen- consultation.co.uk/
A monthly newsletter will be uploaded on the
- website. The website is monitored and all
comments/questions posted promptly directed to the relevant people to review/address.
Communication