s
D) How Will Growth Be Handled? s Houston: Packaging Hub Large - - PowerPoint PPT Presentation
D) How Will Growth Be Handled? s Houston: Packaging Hub Large - - PowerPoint PPT Presentation
D) How Will Growth Be Handled? s Houston: Packaging Hub Large sites with high capacity storage , flexible packaging capabilities and high speed packaging equipment Plus 500 railcar storage yards that can receive potential unit
Houston: Packaging Hub
- Large sites with high
capacity storage , flexible packaging capabilities and high speed packaging equipment
- Plus 500 railcar storage
yards that can receive potential unit trains
CALLED 76.
434 ACRES
U S DENRO STEELS I NC VOL.
(
07)
932 , PG. 543, O.
P. R. C. C. T. C. C. C. F.
NO. 22693
FI S
HE R R O A D
W
ARE H O U
SE S
U D
I
V
I
SI
O N C. C.
F.
N O.
2 6 5 7
L OT 3 L OT 1 S T AT E OF T E XAS CA L L E D 3. 983 AC. PARC E L 2, PAR T 3 VOL
. (
03) 650, PG. 348,
O.
P. R. C. C. T
.
7, 405, 21 2 S
Q.
F T
.
1 70. 0003
A C R
E S
S E T CAPPE D 5/8" I
R"
WI
NDR O S E L AND S E RVI
CE S"
J
O H N
S T E E L S
U R V E Y A B
S T
R A C T N O .
2 2 7
C H A
M
B E R
S
C O U N T Y
,
T E X A S
VI N T AGE P E T RO L E UM, I
NC. 5 0’ WI
D E FI SH E R’
S RE E F PI P E LI
N E E S M’ T VO L.
2 9 2, PG.
5 7, O. P. R. C. C. T. C L OF 2’ WI DE PI PE LI
NE R.
O. W.
& 4’
WI DE SURF AC E E AS E M E N T VI NT AGE P E T ROL E UM, I
NC. VOL.
389, PG.
645, O. P.
R. C. C.
T.
SE T CAPPE D 5/8"I
R"
WI NDR O S E L AND S E RVI
CE S"
S E T CAPP E D 5/
8 "I
R"
WI NDROS E L AND S E RVI C E S" S E T CAPP E D 5/
8"I
R"
WI
NDROSE L AND S E RVI
CE S"
R=528.
8
’
C= L =6
5. 5 9
’
C=573.
4
’
PR O P O SE D
R
OADWAY
2B 1 20’
PRI
VATE S TREET 200’ WIDE PROPOSED DRAINAGE AND DETENTION EASEMENT SI
GN RAI L RE F L E CT OR WAT E R M AN H OL E RI M 22. 7 6C E N T E R L
I
N E O
F S E
I
S
MI
C F A U L T C E N T E R L
I
N E O
F S E
I
S
MI
C F A U L T C E N T E R L
I
N E O
F S E
I
S
M
I
C F A U L T S T
AT E OF T E XAS CAL L E D
2. 570
AC.
PARC E L 2, PAR T 2
VOL
. (
03) 650, PG. 348,
O.
P. R. C. C. T
.
SE T CAPPE D 5/8"I
R"
WI
NDROSE L AND S E RVI
CE S" S E T CAPP E D 5/
8"I
R"
WI NDROS E L AND SE RVI C E S"R =
6 2 4
.
6 9
’
L =745
.
99’
C =7
2
.
4 5
’
S E T CAPPE D 5/
8"I
R"
WI NDROSE L AND SE RVI CE S" S E T CAPP E D 5/
8"I
R"
WI NDROSE L AND SE RVI CE S" SE T CAPPE D 5/
8"I
R"
WI
NDROS E L AND SE RVI C E S" S E T CAPPE D 5/
8"I
R"
WI NDROSE L AND S E RVI CE S" CAL L E D
1 5
.
77
ACRE
S CHAM B E RS COUN T
Y I MPROVE ME NT DI
S T RI C T
NO.
1
VOL
. (
07) 978, PG. 668,
O.
P. R
.
C. C. T
.
C
.
C. C. F NO.
281 03
D E T E N T
I
O N
P
O N D
2
B P R O P O S E D D R AI NAG E A N D D E T E NT
I
ON E A
S E
ME N
T
S E T CAPPE D 5/8" I
R"
WI
NDROSE L AND S E RVI
CE S"
SE T CAPPE D 5/
8"I
R"
WI
NDROS E L AND S E RVI C E S"C E N T E R L
I
N E O
F S E
I
S
MI
C F A U L T
P.
O. B.
SE T CAPPE D 5/
8"I
R"
WI
NDROSE L AND SE RVI CE S" PARKI NG ( 1 06) L A N D S C A P E 20 ’L
A N DS C AP E OFFI CES G NT P M 1 5- C
I
L E A S E ME N T »¿
ª ” 1.0
¢
’
WI D E P3 1 9. 6 5
’
CEDAR PORT RAIL YARD CONCEPT DRAWING
TGS LEAD TRACK RITD PROPOSED TRACK PHASE 2 TRACK LEAD/SWITCHING TRACK PHASE 1 TRACK
09-24-2016
DRAWN BY:
- f
CHECKED BY: DATE: SHEET NUMBER
BR
PROJECT DESCRIPTION: SHEET NAME: SHEET DESCRIPTION:
LJA Engineering, Inc.
2929 Briarpark Drive Phone 713.953.5200 Suite 600 Fax 713.953.5026 Houston, Texas 77042 FRN - F-1386
001
MB 09-04-2016 LA POINT ENERGY RAIL YARD CONCEPT 1
Cedar Port Rail Yard_Baytown, TX
S C A L E I N F E E T 400 200 200
N
LEGEND:
- CONCEPTUAL -
FOR REVIEW/DISCUSSION
RECIEVING TRACK-30 CARS DEPARTURE TRACK-30 CARS BLENDING YARD TRACK 2-10 CARS BLENDING YARD TRACK 3-10 CARS PIPE EASEMENT BLENDING YARD TRACK 1-10 CARS TGS NEW BOUNDARY TGS NEW BOUNDARY SURVEYED FAULT LINE DETENTION POND PROPOSED TGS TAIL TRACK 20 CARS EACH (80 CARS AS SHOWN) 4-TRACK STORAGE YARD-- TRANSLOAD-7 CARS 1 6
.
5 3-FUTURE YARD TRACKS
- CONCEPTUAL -
FOR REVIEW/DISCUSSION
WAREHOUSE 500,000 SF TRUCK COURT--150 FT. DEEP
10 20 20 20 20 20 207
20 10 10- "
- "
- "
- "
- "
- "
- "
- "
- "
- "
POND 759,568 SF POND 500,003 SF BLDG 5 R A I L
- S
E R V E D 749,866 SF
1040'-0" 445'-0" 445'-0" 624'-0" 52'-0" TYP 54'-2" TYP 60'-0" 52'-0" TYP 60'-0" 130'-0" 60'-0" 52'-6" 52'-6" 54'-2" TYP 60'-0"BLDG 2 462,533 SF BLDG 1 277,413 SF
102'-0" 50'-0" 130'-0" 220'-0" 135'-0"BLDG 7 105,686 SF
481'-0"EXISTING DRIVE P E R A E R I A L
113'-10" 150'-0"BLDG 8 99,706 SF BLDG 4 RAIL-SERVED 389,866 SF BLDG 3 R A I L
- S
E R V E D 415,522 SF BLDG 6 R A I L
- S
E R V E D 499,966 SF
5 1 '- "
- "
OVERALL MASTER PLAN
TOTAL SITE AREA = 246.09 AC (10,719,945 SF)
175 350 700 1400
a project for
24 APRIL 2017 161086 TEXAS BAYTOWN
SATPON THOMPSON 10 CLIENT
SATPON THOMPSON 10
SITE COVERAGE = 28%
TOTAL POND = 28.9 AC (1,259,571 SF) 11.75% OF TOTAL SITE CCR NOTES: 2.5 THE PROPERTY MAY BE USED FOR LIGHT INDUSTRIAL PURPOSES. 12.1 NO PARCEL SHALL HAVE TRUCK BAYS FACING THOMPSON RD, INTERSTATE 10, DECKER DRIVE, OR CEDAR-BAYOU LYNCHBERG RD; PROVIDED, HOWEVER, IN THE EVENT ANY PARCEL OR ANY PORTION THEREOF CANNOT BE DEVELOPED WITHOUT A TRUCK BAY FACING ANY SUCH STREET (AND SUCH OWNER CAN REASONABLY DEMONSTRATE ITS INABILITY TO SO DEVELOP), THEN SUCH OWNER MAY PROPOSE OPAQUE SCREENING TO PROTECT THE PUBLIC AND PRIVATE RIGHT-OF-WAY AND ANY ADJACENT DEVELOPMENT FROM VIEW OF THE TRUCK BAY. 12.2 PARCELS HAVE BUILDING FACADES AND WALLS WITH FRONT ENTRANCES FACING THOMPSON RD, INTERSTATE 10, DECKER DRIVE, AND CEDAR-BAYOU LYNCHBERG RD SHALL BE MASONRY, STUCCO, OR GLASS. PHASE I POND = 11.48 AC (500,003 SF) PHASE II POND = 17.4 AC (759,568 SF) CITY OF BAYTOWN PARKING REQUIREMENTS
- SEC. 112.4 MINIMUM REQUIREMENT FOR SPACES
- Industrial plant: The number of parking spaces
required to accommodate all plant employees and construction forces on any single shift
- Business or professional office, studio, bank,
medical or dental clinic: Three parking spaces plus one additional parking space for each 200 square feet of floor area over 500 PHASE I SITE = 98.6 AC (4,293,206 SF) PHASE I POND = 11.6% OF PHASE I PHASE II SITE = 147.5 AC (6,426,738 SF) PHASE II POND = 11.8% OF PHASE II
PARKING = 422 SPACES @ .14/1000
RAIL-SERVED BLDG AREA = 2,055,220 SF
BUILDING AREA = 3,000,558 SF
NON RAIL-SERVED BLDG AREA = 945,338 SF
MAJOR AREA EMPLOYERS
- EXXONMOBIL:
Encompassing 3,400+ acres for refinery & chemical production, the facility has 2,200 full time employees plus an additional 2,100 contract personnel. Annual salaries and wages exceed $250 million ($68.8 million in taxes each year)
- CHEVRONPHILLIPS:
Largest polyethylene plant in the world in conjunction with BP Solvay (now Ineos). Currently, employs around 800 workers with an additional 350 contract
- employees. Facility consists of around 1,200 acres,
- nly 50% of which are developed at this time.
- BAYER:
1,650 acre facility (35% developed) that employs
- ver 2,000 workers. Bayer has its largest worldwide
investment at this facility, totaling $1.3 billion.
WHAT’S AROUND
3.17
NEEDLEPOINT RD HIGHWAY 146 38,847 VPD I-10 73,580 VPD
SH 146
1,750 SF AVAILABLE
MONT BELVIEU
PROPOSED
10 10
WHAT’S AROUND
6.17 | 5.17