D) How Will Growth Be Handled? s Houston: Packaging Hub Large - - PowerPoint PPT Presentation

d how will growth be handled
SMART_READER_LITE
LIVE PREVIEW

D) How Will Growth Be Handled? s Houston: Packaging Hub Large - - PowerPoint PPT Presentation

D) How Will Growth Be Handled? s Houston: Packaging Hub Large sites with high capacity storage , flexible packaging capabilities and high speed packaging equipment Plus 500 railcar storage yards that can receive potential unit


slide-1
SLIDE 1

s

D) How Will Growth Be Handled?

slide-2
SLIDE 2

Houston: Packaging Hub

  • Large sites with high

capacity storage , flexible packaging capabilities and high speed packaging equipment

  • Plus 500 railcar storage

yards that can receive potential unit trains

slide-3
SLIDE 3

CALLED 76.

434 ACRES

U S DENRO STEELS I NC VOL.

(

07)

932 , PG. 543, O.

P. R. C. C. T. C. C. C. F.

NO. 22693

FI S

HE R R O A D

W

ARE H O U

SE S

U D

I

V

I

SI

O N C. C.

F.

N O.

2 6 5 7

L OT 3 L OT 1 S T AT E OF T E XAS CA L L E D 3. 983 AC. PARC E L 2, PAR T 3 VOL

. (

03) 650, PG. 348,

O.

P. R. C. C. T

.

7, 405, 21 2 S

Q.

F T

.

1 70. 0003

A C R

E S

S E T CAPPE D 5

/8" I

R

"

W

I

NDR O S E L AND S E RV

I

CE S

"

J

O H N

S T E E L S

U R V E Y A B

S T

R A C T N O .

2 2 7

C H A

M

B E R

S

C O U N T Y

,

T E X A S

VI N T AGE P E T RO L E UM

, I

NC. 5 0’ W

I

D E FI SH E R

S RE E F PI P E L

I

N E E S M’ T VO L

.

2 9 2, PG

.

5 7, O. P. R. C. C. T. C L OF 2’ WI DE PI PE L

I

NE R

.

O. W

.

& 4

WI DE SURF AC E E AS E M E N T VI NT AGE P E T ROL E UM

, I

NC. VOL

.

389, PG

.

645, O. P

.

R. C. C

.

T

.

SE T CAPPE D 5/8"

I

R

"

WI NDR O S E L AND S E RV

I

CE S

"

S E T CAPP E D 5

/

8 "

I

R

"

WI NDROS E L AND S E RVI C E S" S E T CAPP E D 5

/

8"

I

R

"

W

I

NDROSE L AND S E RV

I

CE S

"

R=528.

8

C= L =6

5. 5 9

C=573.

4

PR O P O SE D

R

OADWAY

2B 1 20’

PRI

VATE S TREET 200’ WIDE PROPOSED DRAINAGE AND DETENTION EASEMENT SI

GN RAI L RE F L E CT OR WAT E R M AN H OL E RI M 22. 7 6

C E N T E R L

I

N E O

F S E

I

S

MI

C F A U L T C E N T E R L

I

N E O

F S E

I

S

MI

C F A U L T C E N T E R L

I

N E O

F S E

I

S

M

I

C F A U L T S T

AT E OF T E XAS CAL L E D

2. 570

AC.

PARC E L 2, PAR T 2

VOL

. (

03) 650, PG. 348,

O.

P. R. C. C. T

.

SE T CAPPE D 5/8"

I

R

"

W

I

NDROSE L AND S E RV

I

CE S" S E T CAPP E D 5

/

8"

I

R

"

WI NDROS E L AND SE RVI C E S"

R =

6 2 4

.

6 9

L =745

.

99’

C =7

2

.

4 5

S E T CAPPE D 5

/

8"

I

R

"

WI NDROSE L AND SE RVI CE S" S E T CAPP E D 5

/

8"

I

R

"

WI NDROSE L AND SE RVI CE S" SE T CAPPE D 5

/

8"

I

R

"

W

I

NDROS E L AND SE RVI C E S" S E T CAPPE D 5

/

8"

I

R

"

WI NDROSE L AND S E RVI CE S

" CAL L E D

1 5

.

77

ACRE

S CHAM B E RS COUN T

Y I MPROVE ME NT DI

S T RI C T

NO.

1

VOL

. (

07) 978, PG. 668,

O.

P. R

.

C. C. T

.

C

.

C. C. F NO.

281 03

D E T E N T

I

O N

P

O N D

2

B P R O P O S E D D R AI NAG E A N D D E T E NT

I

ON E A

S E

ME N

T

S E T CAPPE D 5/8

" I

R

"

W

I

NDROSE L AND S E RV

I

CE S

"

SE T CAPPE D 5

/

8"

I

R

"

W

I

NDROS E L AND S E RVI C E S"

C E N T E R L

I

N E O

F S E

I

S

MI

C F A U L T

P.

O. B.

SE T CAPPE D 5

/

8"

I

R

"

W

I

NDROSE L AND SE RVI CE S" PARKI NG ( 1 06) L A N D S C A P E 20 ’

L

A N DS C AP E OFFI CES G NT P M 1 5
  • C
O V E R E D L A N E S TRUCKWELL ( 2) TO PROPERTY LI NE » ¿ ª ” 10 0.0 ¢’ FROM CENTER O F R R A

I

L E A S E ME N T »

¿

ª ” 1

.0

¢

WI D E P

3 1 9. 6 5

CEDAR PORT RAIL YARD CONCEPT DRAWING

TGS LEAD TRACK RITD PROPOSED TRACK PHASE 2 TRACK LEAD/SWITCHING TRACK PHASE 1 TRACK

09-24-2016

DRAWN BY:

  • f

CHECKED BY: DATE: SHEET NUMBER

BR

PROJECT DESCRIPTION: SHEET NAME: SHEET DESCRIPTION:

LJA Engineering, Inc.

2929 Briarpark Drive Phone 713.953.5200 Suite 600 Fax 713.953.5026 Houston, Texas 77042 FRN - F-1386

001

MB 09-04-2016 LA POINT ENERGY RAIL YARD CONCEPT 1

Cedar Port Rail Yard_Baytown, TX

S C A L E I N F E E T 400 200 200

N

LEGEND:

  • CONCEPTUAL -

FOR REVIEW/DISCUSSION

RECIEVING TRACK-30 CARS DEPARTURE TRACK-30 CARS BLENDING YARD TRACK 2-10 CARS BLENDING YARD TRACK 3-10 CARS PIPE EASEMENT BLENDING YARD TRACK 1-10 CARS TGS NEW BOUNDARY TGS NEW BOUNDARY SURVEYED FAULT LINE DETENTION POND PROPOSED TGS TAIL TRACK 20 CARS EACH (80 CARS AS SHOWN) 4-TRACK STORAGE YARD-- TRANSLOAD-7 CARS 1 6

.

5 3-FUTURE YARD TRACKS

  • CONCEPTUAL -

FOR REVIEW/DISCUSSION

WAREHOUSE 500,000 SF TRUCK COURT--150 FT. DEEP

10 20 20 20 20 20 20

7

20 10 10
slide-4
SLIDE 4 180'-0" 130'-0" 572'-0" 135'-0" 5 2 '
  • "
T Y P 6 '
  • "
4 8 '
  • "
T Y P 300'-0" 1402'-0" 48'-0" T Y P 300'-0" 6 '
  • "
5 2 '
  • "
T Y P 300'-0" 135'-0" 52'-0" T Y P 100'-0" 300'-0" 130'-0" 5 2 '
  • "
T Y P 60'-0" 135'-0" 2500'-0" 1300'-0" 4 8 '
  • "
T Y P 135'-0" 5 4 '
  • "
1667'-0" 54'-0" 6 '
  • "
53'-6" 4 8 '
  • "
T Y P 53'-6" 162'-3" 204'-2"

POND 759,568 SF POND 500,003 SF BLDG 5 R A I L

  • S

E R V E D 749,866 SF

1040'-0" 445'-0" 445'-0" 624'-0" 52'-0" TYP 54'-2" TYP 60'-0" 52'-0" TYP 60'-0" 130'-0" 60'-0" 52'-6" 52'-6" 54'-2" TYP 60'-0"

BLDG 2 462,533 SF BLDG 1 277,413 SF

102'-0" 50'-0" 130'-0" 220'-0" 135'-0"

BLDG 7 105,686 SF

481'-0"

EXISTING DRIVE P E R A E R I A L

113'-10" 150'-0"

BLDG 8 99,706 SF BLDG 4 RAIL-SERVED 389,866 SF BLDG 3 R A I L

  • S

E R V E D 415,522 SF BLDG 6 R A I L

  • S

E R V E D 499,966 SF

5 1 '
  • "
5 1 '
  • "

OVERALL MASTER PLAN

TOTAL SITE AREA = 246.09 AC (10,719,945 SF)

175 350 700 1400

a project for

24 APRIL 2017 161086 TEXAS BAYTOWN

SATPON THOMPSON 10 CLIENT

SATPON THOMPSON 10

SITE COVERAGE = 28%

TOTAL POND = 28.9 AC (1,259,571 SF) 11.75% OF TOTAL SITE CCR NOTES: 2.5 THE PROPERTY MAY BE USED FOR LIGHT INDUSTRIAL PURPOSES. 12.1 NO PARCEL SHALL HAVE TRUCK BAYS FACING THOMPSON RD, INTERSTATE 10, DECKER DRIVE, OR CEDAR-BAYOU LYNCHBERG RD; PROVIDED, HOWEVER, IN THE EVENT ANY PARCEL OR ANY PORTION THEREOF CANNOT BE DEVELOPED WITHOUT A TRUCK BAY FACING ANY SUCH STREET (AND SUCH OWNER CAN REASONABLY DEMONSTRATE ITS INABILITY TO SO DEVELOP), THEN SUCH OWNER MAY PROPOSE OPAQUE SCREENING TO PROTECT THE PUBLIC AND PRIVATE RIGHT-OF-WAY AND ANY ADJACENT DEVELOPMENT FROM VIEW OF THE TRUCK BAY. 12.2 PARCELS HAVE BUILDING FACADES AND WALLS WITH FRONT ENTRANCES FACING THOMPSON RD, INTERSTATE 10, DECKER DRIVE, AND CEDAR-BAYOU LYNCHBERG RD SHALL BE MASONRY, STUCCO, OR GLASS. PHASE I POND = 11.48 AC (500,003 SF) PHASE II POND = 17.4 AC (759,568 SF) CITY OF BAYTOWN PARKING REQUIREMENTS

  • SEC. 112.4 MINIMUM REQUIREMENT FOR SPACES
  • Industrial plant: The number of parking spaces

required to accommodate all plant employees and construction forces on any single shift

  • Business or professional office, studio, bank,

medical or dental clinic: Three parking spaces plus one additional parking space for each 200 square feet of floor area over 500 PHASE I SITE = 98.6 AC (4,293,206 SF) PHASE I POND = 11.6% OF PHASE I PHASE II SITE = 147.5 AC (6,426,738 SF) PHASE II POND = 11.8% OF PHASE II

PARKING = 422 SPACES @ .14/1000

RAIL-SERVED BLDG AREA = 2,055,220 SF

BUILDING AREA = 3,000,558 SF

NON RAIL-SERVED BLDG AREA = 945,338 SF

slide-5
SLIDE 5

MAJOR AREA EMPLOYERS

  • EXXONMOBIL:

Encompassing 3,400+ acres for refinery & chemical production, the facility has 2,200 full time employees plus an additional 2,100 contract personnel. Annual salaries and wages exceed $250 million ($68.8 million in taxes each year)

  • CHEVRONPHILLIPS:

Largest polyethylene plant in the world in conjunction with BP Solvay (now Ineos). Currently, employs around 800 workers with an additional 350 contract

  • employees. Facility consists of around 1,200 acres,
  • nly 50% of which are developed at this time.
  • BAYER:

1,650 acre facility (35% developed) that employs

  • ver 2,000 workers. Bayer has its largest worldwide

investment at this facility, totaling $1.3 billion.

WHAT’S AROUND

3.17

slide-6
SLIDE 6

NEEDLEPOINT RD HIGHWAY 146 38,847 VPD I-10 73,580 VPD

SH 146

1,750 SF AVAILABLE

MONT BELVIEU

PROPOSED

10 10

WHAT’S AROUND

6.17 | 5.17