CRITICALITY

slide-2
SLIDE 2

CRITICALITY OF ASSETS

Eric Saylor, Cincinnati, OH

slide-3
SLIDE 3

Wha hat i t is the the l likelihood tha that a an n asset et w will fa ill fail? il? Wha hat i t is the the c cons

  • nsequence i

if the the asse asset d does f s fai ail?

slide-4
SLIDE 4

ASSET RISK

PROBABILITY OF FAILURE

CONSEQUENCE OF FAILURE

slide-5
SLIDE 5

FAILURE MODES

MORTALITY LEVEL OF SERVICE CAPACITY FINANCIAL INEFFICIENCY

slide-6
SLIDE 6

FAILURE MODES

MORTALITY

slide-7
SLIDE 7

FAILURE MODES

LEVEL OF SERVICE

slide-8
SLIDE 8

FAILURE MODES

CAPACITY

slide-9
SLIDE 9

FAILURE MODES

FINANCIAL INEFFICIENCY

More to fix than to replace

slide-10
SLIDE 10

ASESSING CONSEQUENCES?

CONSIDER THE TRIPLE BOTTOM LINE

slide-11
SLIDE 11

CALCULATING CRITICALITY

COF= CONSEQUENCE OF FAILURE Criticality = POF X COF

slide-12
SLIDE 12

WAYS TO REDUCE RISK

Routine & Preventative Maintenance Redundancy Spare Parts Specialized Training Replace Assets Early Monitoring

slide-13
SLIDE 13

CALCULATING CRITICALITY INCLUDING REDUNDANCY

COF= COST OF FAILURE Redundancy Factor = RF Criticality = POF X COF X RF

slide-14
SLIDE 14

ASSESSING CRITICALITY: A SIMPLE EXAMPLE

slide-15
SLIDE 15

FACTORS TO CONSIDER FOR

Age of Well Condition of Well Clogging of Well Aesthetic Water Concerns Depth of Well

PROBABILITY OF FAILURE

slide-16
SLIDE 16

Well Name POF Factor Westside Well 4 Eastside Well 2 Northside Well 4 Southside Well 1 Central Well 4

Scores for PoF

slide-17
SLIDE 17

FACTORS TO CONSIDER FOR

Cost of Repair Number of Customers Served Number of Critical Customers Time of Repair Redundancy

CONSEQUENCE OF FAILURE

slide-18
SLIDE 18

Well Name COF Factor Westside Well 4 Eastside Well 4 Northside Well 3 Southside Well 2 Central Well 5

Scores for CoF

slide-19
SLIDE 19

Well Name POF COF TOTAL RISK SCORE Westside Well 4 4 16 Eastside Well 2 4 8 Northside Well 4 3 12 Southside Well 1 2 2 Central Well 4 5 20

Risk Scores for Wells

slide-20
SLIDE 20

Westside Well

PROBABILITY OF FAILURE

CONSEQUENCE OF FAILURE

VISUAL DISPLAY OF EXAMPLE DATA

slide-21
SLIDE 21

DOES IT MAKE SENSE? DO YOU CARRY TOO MUCH RISK, NOT ENOUGH OR JUST RIGHT?

What does the data say?

slide-22
SLIDE 22

Westside Well

PROBABILITY OF FAILURE

CONSEQUENCE OF FAILURE

WHAT IF IT LOOKED LIKE THIS?

slide-23
SLIDE 23

Westside Well

PROBABILITY OF FAILURE

CONSEQUENCE OF FAILURE

Or this?

slide-24
SLIDE 24

 CRITICALITY IS NOT STATIC  EACH DAY CRITICALITY CHANGES SLIGHTLY  NEED TO REASSESS CRITICALITY AT LEAST EVERY YEAR IF NOT SOONER  REASSESS WHEN MAJOR CHANGES ARE MADE (UPGRADES, REPLACEMENTS, MAJOR CONSTRUCTION, REHABILITATION, REDUNDANCY ADDED)

CRITICALITY CHANGES

slide-25
SLIDE 25

CRITICALITY IN ACTION

Frank Roth, ABCWUA, Albuquerque, NM

slide-26
SLIDE 26

Tools Available

Criticality of Assets

Allows you to calculate risk for assets

http://southwestefc.unm.edu/asset-management/

slide-27
SLIDE 27

Tools Available

http://southwestefc.unm.edu/asset-management/ Reference Guide for Asset Management Inventory and Risk Analysis

Provides you with lists of characteristics to take into consideration when determining Probability and Consequence of Failure