CR 455 Extension Project Development and Environment (PD&E) Study

RSQ 17-0014 June 20, 2019

slide-2
SLIDE 2

2

Alternative Concepts Public Workshop June 20, 2019

WELCOME

Open House Format Presentation Runs Every 10 Minutes

Clermont Arts & Recreation Center 3700 S. Highway 27, Clermont, Florida 34711 5:30 p.m. to 7:30 p.m.

slide-3
SLIDE 3

CR 455 Extension Project Development & Environment (PD&E) Study

Project Background

The need for improvements was identified by several entities.

  • Lake-Sumter Metropolitan Planning Organization (MPO)
  • 2035 Long Range Transportation Plan
  • Identified the need for an additional north-south corridor
  • Wellness Way Area Plan (WWAP)
  • Identified as an area with significant economic development opportunities
  • Mix of residential, commercial, office, education, medical and recreational

uses to provide employment in Lake County

  • Identified a north-south corridor extension of CR 455

3

slide-4
SLIDE 4

CR 455 Extension Project Development & Environment (PD&E) Study

What is a PD&E Study?

A Project Development and Environment (PD&E) Study is an environmental and engineering process used to document social, economic, and environmental impacts associated with a proposed transportation improvement project.

4

slide-5
SLIDE 5

CR 455 Extension Project Development & Environment (PD&E) Study

Study Area

5

slide-6
SLIDE 6

CR 455 Extension Project Development & Environment (PD&E) Study

Existing Traffic Conditions (2018)

6

Level of Service A Free flow traffic Level of Service F Forced flow traffic

slide-7
SLIDE 7

CR 455 Extension Project Development & Environment (PD&E) Study

Existing Traffic Volumes (2018)

7

U.S. 27 Hartwood Marsh Road Schofield Road 25,500 Hancock Road S.R. 50 Johns Lake Road 20,087 Johns Lake Road Hartwood Marsh Road 11,175 Hartwood Marsh Road Hancock Road Lake/Orange County Line 12,123 Schofield Road U.S. 27 Lake/Orange County Line 198 Roadway From To Average Daily Traffic (vpd)

slide-8
SLIDE 8

CR 455 Extension Project Development & Environment (PD&E) Study

Future Traffic Conditions No-Build Scenario (2045)

8

slide-9
SLIDE 9

CR 455 Extension Project Development & Environment (PD&E) Study

Future Traffic Volumes (2045) No-Build Scenario

9

% Change U.S. 27 Hartwood Marsh Road CFX Connector 62,063 143% Hancock Road S.R. 50 Johns Lake Road 28,577 42% Johns Lake Road Hartwood Marsh Road 23,484 110% Hartwood Marsh Road Wellness Way 22,458

  • Hartwood Marsh

Road Hancock Road CR 455 Extension 20,669 70% CR 455 Extension Lake/Orange County Line 13,012 7% Wellness Way U.S. 27 Lake/Orange County Line 31,655

  • Schofield Road

Hancock Road Lake/Orange County Line 11,449 5682% CFX Connector U.S. 27 S.R. 429 22,645

  • Roadway

From To Average Daily Traffic (vpd)

slide-10
SLIDE 10

CR 455 Extension Project Development & Environment (PD&E) Study

Purpose and Need of the Corridor

▪ Sustain projected future growth while providing additional multimodal options ▪ Provide a long-term north-south corridor for southeast Lake County ▪ Provide a regional link between areas of the county ▪ Identified in Lake-Sumter MPO 2035 Long Range Transportation Plan and Lake County’s Wellness Way Area Plan ▪ Direct connection to other proposed roads

10

slide-11
SLIDE 11

CR 455 Extension Project Development & Environment (PD&E) Study

Public & Neighborhood Meetings

Public Concerns

▪ Impacts to rural character ▪ Environmental impacts ▪ Divided Community ▪ Property value ▪ Project need ▪ Planned developments in Wellness Way Area Plan

11

slide-12
SLIDE 12

CR 455 Extension Project Development & Environment (PD&E) Study

Additional Stakeholder Input

▪ Coordination Meetings

  • Property Owners
  • Water Conserv II
  • Central Florida Expressway (CFX) Authority

▪ Emails ▪ Website Comments ▪ Letters

12

slide-13
SLIDE 13

CR 455 Extension Project Development & Environment (PD&E) Study

Typical Section – 4 Lanes

13 13

slide-14
SLIDE 14

CR 455 Extension Project Development & Environment (PD&E) Study

14

Traffic Analysis (2045) CR 455 Extension Corridor

slide-15
SLIDE 15

CR 455 Extension Project Development & Environment (PD&E) Study

Alternatives Overview

15

Blue

15

Green Yellow Purple Pink

slide-16
SLIDE 16

CR 455 Extension Project Development & Environment (PD&E) Study

CR 455 Purple Alternative

16

Overall South Detail North Detail

16

slide-17
SLIDE 17

CR 455 Extension Project Development & Environment (PD&E) Study

CR 455 Green Alternative

17

Overall South Detail North Detail

17

slide-18
SLIDE 18

CR 455 Extension Project Development & Environment (PD&E) Study

CR 455 Yellow Alternative

18

Overall South Detail North Detail

18

slide-19
SLIDE 19

CR 455 Extension Project Development & Environment (PD&E) Study

CR 455 Blue Alternative

19

Overall South Detail North Detail

19

slide-20
SLIDE 20

CR 455 Extension Project Development & Environment (PD&E) Study

CR 455 Pink Alternative

20

Overall South Detail North Detail

20

slide-21
SLIDE 21

CR 455 Extension Project Development & Environment (PD&E) Study

CR 455 Alternatives Evaluation Matrix

21

slide-22
SLIDE 22

CR 455 Extension Project Development & Environment (PD&E) Study

Project Benefits

Opportunities ▪ Coordinate with other FDOT/County/City projects ▪ Joint use ponds ▪ Improved traffic safety ▪ Continuous north/south corridor ▪ Alternate emergency evacuation route ▪ Pedestrian/bicycle amenities Objectives

▪ Provide short-term improvements that will improve safety ▪ Support the Wellness Way Area Plan ▪ Select a corridor that accommodates a four- lane divided facility and meets standard criteria ▪ Develop an improvement that is consistent with projected growth ▪ Balanced project approach ▪ Context sensitive design

22

On-going stakeholder engagement

slide-23
SLIDE 23

CR 455 Extension Project Development & Environment (PD&E) Study

Project Schedule

23

Notice to Proceed | March 2018 Alternatives Workshop | June 2019 Preferred Alternative Meeting | October 2019 Public Hearing | December 2019 Document Closeout | January 2020

slide-24
SLIDE 24

CR 455 Extension Project Development & Environment (PD&E) Study

24

Stay Informed! Stay Involved

For additional information, please contact:

George Gadiel, PE Lake County Project Manager Lake County Public Works 350 N. Sinclair Ave Tavares, FL 32778 Phone: (352) 253-9092 Email: ggadiel@lakecountyfl.gov Dwayne Darbonne, PE Consultant Project Manager METRO Consulting Group, LLC 604 Courtland St. Ste. 140 Orlando, FL 32804 Phone: (407) 960-3973 Email: dwayne.darbonne@metrocgllc.com Visit the study website, www.cr455extensionstudy.com, to stay informed about the study’s progress.

www.cr455extensionstudy.com

slide-25
SLIDE 25

CR 455 Extension Project Development and Environment (PD&E) Study

THANK YOU!

Lake County Alternative Concepts Public Workshop June 20, 2019 Meeting

RSQ 17-0014