CPU 5 Breakout Troubleshooting on the Grade Gary L. Mitchell, - - PowerPoint PPT Presentation

cpu 5 breakout
SMART_READER_LITE
LIVE PREVIEW

CPU 5 Breakout Troubleshooting on the Grade Gary L. Mitchell, - - PowerPoint PPT Presentation

AC ACPA PA Pr Prot otoc ocol ol an and Re d Reso sour urce ces s for for Mud Mud Ball Ball Pro Problems blems CPU 5 Breakout Troubleshooting on the Grade Gary L. Mitchell, P.E. Vice President Airports & Pavement


slide-1
SLIDE 1

AC ACPA PA Pr Prot

  • toc
  • col
  • l an

and Re d Reso sour urce ces s for for Mud Mud Ball Ball Pro Problems blems

Gary L. Mitchell, P.E.

Vice President—Airports & Pavement Technology American Concrete Pavement Association

CPU 5 Breakout— Troubleshooting

  • n the Grade
slide-2
SLIDE 2
slide-3
SLIDE 3
slide-4
SLIDE 4

Introduction Surface Defect Contained in aggregates Loader operations Don’t disperse in the mixer Shows up after paving

slide-5
SLIDE 5

Prevention Stockpile Location Flat Facilitate unloading & stockpiling Pad or sacrificial layer Loader Operator

slide-6
SLIDE 6

Determining Severity ASTM D 5340 PCI Standards 3 pop outs per square yard Size – can it be cored? Deleterious Material Requirements ASTM C 33 – 3% fine ag, up to 5% coarse ag Airfield project will not tolerate C 33 threshold Remove & Replace only if extensive or large clay balls

slide-7
SLIDE 7

Repair Procedures Filling

Sandblasting Pressure washing Compressed air

Coring

Slightly larger than clay ball Partial depth core Epoxy fill

slide-8
SLIDE 8

Summary

Prevention

Manage owner’s perception Assess extent of the problem Establish repair procedure