CPU 5 Breakout Troubleshooting on the Grade Gary L. Mitchell, - PowerPoint PPT Presentation

AC ACPA PA Pr Prot otoc ocol ol an and Re d Reso sour urce ces s for for Mud Mud Ball Ball Pro Problems blems CPU 5 Breakout Troubleshooting on the Grade Gary L. Mitchell, P.E. Vice President Airports & Pavement


  1. AC ACPA PA Pr Prot otoc ocol ol an and Re d Reso sour urce ces s for for Mud Mud Ball Ball Pro Problems blems CPU 5 Breakout — Troubleshooting on the Grade Gary L. Mitchell, P.E. Vice President — Airports & Pavement Technology American Concrete Pavement Association

  2. Introduction Surface Defect Contained in aggregates Loader operations Don’t disperse in the mixer Shows up after paving

  3. Prevention Stockpile Location Flat Facilitate unloading & stockpiling Pad or sacrificial layer Loader Operator

  4. Determining Severity ASTM D 5340 PCI Standards 3 pop outs per square yard Size – can it be cored? Deleterious Material Requirements ASTM C 33 – 3% fine ag, up to 5% coarse ag Airfield project will not tolerate C 33 threshold Remove & Replace only if extensive or large clay balls

  5. Repair Procedures Filling Sandblasting Pressure washing Compressed air Coring Slightly larger than clay ball Partial depth core Epoxy fill

  6. Summary Prevention Manage owner’s perception Assess extent of the problem Establish repair procedure

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.