Coronado City Council September 1, 2020 Aesthetics and Visual Simulations Purpo se o f Visua l Simula tio ns Provide a Feasible Concept Provide a Feasible Concept o Simulate changes to golf course configuration / playability o Simulate


slide-1
SLIDE 1

Coronado City Council September 1, 2020 Aesthetics and Visual Simulations

slide-2
SLIDE 2

2 City Council – 9/1/20

 Provide a Feasible Concept

  • Simulate changes to golf course configuration / playability
  • Simulate aesthetics from multiple of vantage points

 Use in CEQA Environmental Review of Project

  • Assist in the review of aesthetic and visual changes from public vantage points

 Confirm City’s Next Steps

  • Bayside Location, Layout A, and Installation of Story Poles
  • Story Pole Installation: September 8 – 15, 2020

Purpo se o f Visua l Simula tio ns

 Provide a Feasible Concept  Use in CEQA Environmental Review of Project  Confirm City’s Next Steps

slide-3
SLIDE 3

3 City Council – 9/1/20

  • Starting Point: 2018 Feasibility Study, Bayside Alternative
  • Red Area = Space for Recycled Water & Turf Facility
  • Blue Area = New pond for recycled water storage
  • Grey Line = New Access Driveway
  • Concept was a 2-D exercise

Pro vide a F e a sib le Co nc e pt fo r City’ s / Pub lic ’ s Co nside ra tio n

slide-4
SLIDE 4

4 City Council – 9/1/20

Pro vide a F e a sib le Co nc e pt fo r City’ s / Pub lic ’ s Co nside ra tio n

Concept A

  • 2020 Visual Simulation Concepts
  • Concept is a 3-D Exercise
slide-5
SLIDE 5

5 City Council – 9/1/20

  • 2020 Visual Simulation Concepts
  • Different Building Layouts Between Concept A and Concept B

Pro vide a F e a sib le Co nc e pt fo r City’ s / Pub lic ’ s Co nside ra tio n

Concept A Concept B

slide-6
SLIDE 6

6 City Council – 9/1/20

Concept A

  • 2020 Visual Simulation Concepts
  • Concept is a 3-D Exercise
  • Different Building Layouts Between Concept A and Concept B
  • Conceptual Design Elements
  • Fairways on Holes 1, 2, and 3 to Maximize Bay Views
  • Realigned Hole 1; Maintained Par 4
  • Realigned Hole 2; Infinity Edge Green; Longer Par 5
  • Realigned Hole 3; Green Closer To Bay; Maintained Par 4
  • Relocated Hole 4 Tee; Reduced to Par 4
  • 2 Ways To Access Site From Existing Maintenance Area

(Combination Cart Path / Access Driveway)

  • Lowered Project Area with Raised Landscaped Berm

Pro vide a F e a sib le Co nc e pt fo r City’ s / Pub lic ’ s Co nside ra tio n

slide-7
SLIDE 7

14 City Council – 9/1/20

slide-8
SLIDE 8

15 City Council – 9/1/20

slide-9
SLIDE 9

17 City Council – 9/1/20

slide-10
SLIDE 10

19 City Council – 9/1/20

slide-11
SLIDE 11

20 City Council – 9/1/20

slide-12
SLIDE 12

21 City Council – 9/1/20

slide-13
SLIDE 13

23 City Council – 9/1/20

slide-14
SLIDE 14

25 City Council – 9/1/20

slide-15
SLIDE 15

26 City Council – 9/1/20

slide-16
SLIDE 16

28 City Council – 9/1/20

slide-17
SLIDE 17

29 City Council – 9/1/20

Purpo se o f Visua l Simula tio ns

Staff’s Recommendation

Staff Recommends Bayside Layout A .  Provide a Feasible Concept

  • Simulate changes to golf course configuration / playability
  • Simulate aesthetics from multiple of vantage points

 Bayside Layout A Incorporation Into Design-Build Documents

  • Require location to match Bayside Alternative area
  • Set maximum building height elevations equal to those in visual simulation
  • Require no more than 1 shot reduction for par along front nine; Reward designs that maintain par
  • Require relocated Hole 3 green to improve view of bay from bike path
  • Reward design proposals with improved player views of bay from holes 1, 2, and 3
slide-18
SLIDE 18

30 City Council – 9/1/20

 Provide a Feasible Concept

  • Simulate changes to golf course configuration / playability
  • Simulate aesthetics from multiple of vantage points

 Use in CEQA Environmental Review of Project

  • Assist in the review of aesthetic and visual changes from public vantage points

 Confirm City’s Next Steps

  • Confirm Bayside Location, Layout A, and Installation of Story Poles
  • Story Pole Installation: September 8 – September 15, 2020

Purpo se o f Visua l Simula tio ns

Staff’s Recommendation

Staff Prefers Bayside Layout A Addressed by MND Continue With Project Next Slides

slide-19
SLIDE 19

31 City Council – 9/1/20

Sto ry Po le s

 September 8 – 15, 2020

Concept A

1 2 3 4 5 6

slide-20
SLIDE 20

32 City Council – 9/1/20

Sto ry Po le s

 Poles to have 2 flags: 1 for the structure height, 1 for the adjacent landscaped berm height POND LANDSCAPED BERM STRUCTURE Line Of Sight

Concept A

1 2 3 4 5 6