coronado city council september 1 2020 aesthetics and
play

Coronado City Council September 1, 2020 Aesthetics and Visual - PowerPoint PPT Presentation

Coronado City Council September 1, 2020 Aesthetics and Visual Simulations Purpo se o f Visua l Simula tio ns Provide a Feasible Concept Provide a Feasible Concept o Simulate changes to golf course configuration / playability o Simulate


  1. Coronado City Council September 1, 2020 Aesthetics and Visual Simulations

  2. Purpo se o f Visua l Simula tio ns  Provide a Feasible Concept  Provide a Feasible Concept o Simulate changes to golf course configuration / playability o Simulate aesthetics from multiple of vantage points  Use in CEQA Environmental Review of Project  Use in CEQA Environmental Review of Project o Assist in the review of aesthetic and visual changes from public vantage points  Confirm City’s Next Steps  Confirm City’s Next Steps o Bayside Location, Layout A, and Installation of Story Poles o Story Pole Installation: September 8 – 15, 2020 2 City Council – 9/1/20

  3. Pro vide a F e a sib le Co nc e pt fo r City’ s / Pub lic ’ s Co nside ra tio n • Starting Point: 2018 Feasibility Study, Bayside Alternative o Red Area = Space for Recycled Water & Turf Facility o Blue Area = New pond for recycled water storage o Grey Line = New Access Driveway o Concept was a 2-D exercise 3 City Council – 9/1/20

  4. Pro vide a F e a sib le Co nc e pt fo r City’ s / Pub lic ’ s Co nside ra tio n • 2020 Visual Simulation Concepts o Concept is a 3-D Exercise Concept A 4 City Council – 9/1/20

  5. Pro vide a F e a sib le Co nc e pt fo r City’ s / Pub lic ’ s Co nside ra tio n • 2020 Visual Simulation Concepts o Different Building Layouts Between Concept A and Concept B Concept A Concept B 5 City Council – 9/1/20

  6. Pro vide a F e a sib le Co nc e pt fo r City’ s / Pub lic ’ s Co nside ra tio n • 2020 Visual Simulation Concepts o Concept is a 3-D Exercise o Different Building Layouts Between Concept A and Concept B • Conceptual Design Elements o Fairways on Holes 1, 2, and 3 to Maximize Bay Views o Realigned Hole 1; Maintained Par 4 o Realigned Hole 2; Infinity Edge Green; Longer Par 5 o Realigned Hole 3; Green Closer To Bay; Maintained Par 4 o Relocated Hole 4 Tee; Reduced to Par 4 o 2 Ways To Access Site From Existing Maintenance Area (Combination Cart Path / Access Driveway) o Lowered Project Area with Raised Landscaped Berm Concept A 6 City Council – 9/1/20

  7. 14 City Council – 9/1/20

  8. 15 City Council – 9/1/20

  9. 17 City Council – 9/1/20

  10. 19 City Council – 9/1/20

  11. 20 City Council – 9/1/20

  12. 21 City Council – 9/1/20

  13. 23 City Council – 9/1/20

  14. 25 City Council – 9/1/20

  15. 26 City Council – 9/1/20

  16. 28 City Council – 9/1/20

  17. Purpo se o f Visua l Simula tio ns  Provide a Feasible Concept Staff’s Recommendation o Simulate changes to golf course configuration / playability Staff Recommends Bayside Layout A o Simulate aesthetics from multiple of vantage points  Bayside Layout A Incorporation Into Design-Build Documents o Require location to match Bayside Alternative area o Set maximum building height elevations equal to those in visual simulation . o Require no more than 1 shot reduction for par along front nine; Reward designs that maintain par o Require relocated Hole 3 green to improve view of bay from bike path o Reward design proposals with improved player views of bay from holes 1, 2, and 3 29 City Council – 9/1/20

  18. Purpo se o f Visua l Simula tio ns  Provide a Feasible Concept Staff’s Recommendation o Simulate changes to golf course configuration / playability Staff Prefers Bayside Layout A o Simulate aesthetics from multiple of vantage points  Use in CEQA Environmental Review of Project Addressed by MND o Assist in the review of aesthetic and visual changes from public vantage points  Confirm City’s Next Steps Continue With Project Next Slides o Confirm Bayside Location, Layout A, and Installation of Story Poles o Story Pole Installation: September 8 – September 15, 2020 30 City Council – 9/1/20

  19. Sto ry Po le s  September 8 – 15, 2020 2 1 3 5 4 6 Concept A 31 City Council – 9/1/20

  20. Sto ry Po le s  Poles to have 2 flags: 1 for the structure height, 1 for the adjacent landscaped berm height 2 1 Line Of Sight STRUCTURE LANDSCAPED 3 POND 5 BERM 4 6 Concept A 32 City Council – 9/1/20

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend