SBN-FD Control Room Operations Working Group Geoff Savage WA104/ICARUS Technical Working Group Meeting 11-Dec-2019 The brief history of the Control Room Operations WG 15-Nov-2019 I sent an email to Claudio suggesting we start an


  1. SBN-FD Control Room Operations Working Group Geoff Savage WA104/ICARUS Technical Working Group Meeting 11-Dec-2019

  2. The brief history of the Control Room Operations WG • 15-Nov-2019 – I sent an email to Claudio suggesting we start an operations working group. – “The mandate would be setting up documentation infrastructure for shifts and computers in the control room. The software infrastructure for control room operations requires a significant amount of work.” • The verbal response shortly after was yes, form the working group, with some good suggestions. – Narrow the scope of “operations”. – Start the group with senior people leading. – Write down to goals of the WG (I see that my mandate is not coherent.) • Diana and Bruce started working on setting up the control room. • We are still working on the goals • We had our first meeting this week on Monday 9-Dec. 2 12/11/19 Geoff Savage | Control Room Operations WG

  3. Control Room Operations WG Goals • Identify and implement the technical aspects of operating the Icarus detector from ROC-W and from remote control rooms. – Hardware - computers, monitors – Software • Shift communications (zoom, slack) • DAQ communications (ssh tunnel, vpn, vnc, authentication) • DAQ software (run control, art daq, monitoring) • Event display • Be ready for cool down operations – Display internal cryostat parameters – temperatures and LAr level – Operate DAQ to readout 6 tpc crates • This group will not determine when a shifter is qualified to take a shift. Nor will it determine when a remote control room is ready for shifters. Nor will it determine the shift quotas for collaborators. 3 12/11/19 Geoff Savage | Control Room Operations WG

  4. SBN Control Room in ROC-West • Space allocated in ROC-West is for the SBN control room with Icarus as the first occupant. – Remote Operations Center – West side of Wilson Hall • Right now Nova test beam is using the SBN control room space that will eventually be used by SBND. – Nova test beam runs for another 6 months. 4 12/11/19 Geoff Savage | Control Room Operations WG

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.