TURNKEY BUILDING SOLUTIONS ________________________________________________ Contents Mission and philosophy Worldwide Turnkey projects Installations for Public, Office and Trade buildings Installations for the Industrial Sector


slide-1
SLIDE 1

________________________________________________

TURNKEY BUILDING SOLUTIONS

slide-2
SLIDE 2

 Mission and philosophy  Worldwide  Turnkey projects  Installations for Public, Office and Trade buildings  Installations for the Industrial Sector  Thermal Power Plants and Cogeneration power plants  Hydroelectric Power Plants and Photovoltaic Systems  Electrical Switchboards and Switchgears  Building management  Electrical Substations 132/15 kV  Certificates Contents

slide-3
SLIDE 3

MISSION

The CARAGLIO Group is strong owing to the united actions of the companies in the group

which are integrated and complement each other. The CARAGLIO Group is active in the energy sector and it has established its name in the industrial and service sector as a supplier of engineering services, industrial systems and service systems, process automation and development of power generation systems.

Energy-Ка as a representative of the CARAGLIO Group in Bulgaria combines the

knowledge and experience of the Italian companies from the Group. Our main goal is to offer an end-to-end solution to our customers. That is why Energy-Ка designs, develops, constructs, installs and delivers a turnkey project, including construction and building products, all electrical installations and the equipment required for electric power distribution, heating, ventilation and air conditioning systems, fire safety and fire alarm systems, all low-voltage installations and BMS. The end-to-end solution also includes an analysis of the needs taking into account the customer’s requirements, the choice of the best solution and warranting the products and performance by means of providing regular or urgent support depending on the customer’s needs. Our relations with our customers are very important for us. The honest, polite and highly professional manner is the norm in our relations with customers. Energy-Ка is ever committed to its main principles:

  • flexible products and solutions delivered;
  • good-quality materials ensuring robust and reliable products;
  • functional and practical solutions for the planned systems;
  • quality/price ratio at a fully competitive level.

PHILOSOPHY Customer satisfaction is at the core of the CARAGLIO Group’s strategy and Energy-Ka’s policy,

in turn, as a group member. The Group pays special attention not only to the price but also to the following main components of delivering services to our customers:

  • constant analysis of our customers’ needs;
  • ability to offer first class products meeting our customers’ needs;
  • research of innovative and unique technical solutions taking into account the product’s

functionality (security, functionality, flexibility);

  • growth and development in cooperation with our partners;
  • customized solutions in the very design based on the customer’s specific requirements;
  • flexible and timely delivery;
  • post-purchase service;
  • product warranty.
slide-4
SLIDE 4

CARAGLIO CANADA CARAGLIO MEXICO

Worldwide

slide-5
SLIDE 5

___________________________________________________________________ We have built Office buildings, logistic centers, trade centers, hotels, hypermarkets in Italy and Bulgaria, such as Logistic center Giordano (40 000 m2), SAC (38 000 m2), Perform (36 000 m2), Vertigo (40 000 m2), Grand’A (37 000 m2), Big Store, Leclerc, Conad, OBI (5 000 m2), Cash and Carry (18 500 m2), Mercato’ (4 000 m2) etc. We are on the Italian market for 40 years, in Bulgaria since 1998

About Us

slide-6
SLIDE 6

Turnkey projects

PLACE: ALBA (CN), Italy – Asti Blvd. DESCRIPTION: Construction of a shopping center with hypermarket and adjoining gallery

“COMMERCIAL CENTER ALBACENTER - CONAD”

slide-7
SLIDE 7

“COMMERCIAL CENTER BIGSTORE ALBA”

PLACE: ALBA (CN), Italy – Canale Blvd. DESCRIPTION: Construction of a shopping center with hypermarket and adjoining gallery

Turnkey projects

slide-8
SLIDE 8

PLACE: CUNEO, Italy – Madonna dell’Olmo zone DESCRIPTION: Construction of a shopping center with hypermarket and adjoining commercial gallery

COMMERCIAL CENTER “La Grand’A – CUNEO”

Turnkey projects

slide-9
SLIDE 9

“KIMBERLY CLARK”

PLACE: ROMAGNANO SESIA (NO), Italy DESCRIPTION: Construction of a new plant and various further interventions

“FERRERO” JSC confectionery industry

PLACE: ALBA (CN) - Italy DESCRIPTION: Construction of new buildings as well as internal and external refurbishment

Turnkey projects

slide-10
SLIDE 10

“CIEB NUOVA”

PLACE: FOSSANO (CN), Italy – Torino Str. DESCRIPTION: Construction of an industrial building with adjoining offices

Turnkey projects

slide-11
SLIDE 11

PLACE: Biandrate (NO), Italy

“LIDL”

DESCRIPTION: Enlargement of an establishment storehouses finished product “turnkey” Combined roof construction prefabricated/steel, infill walls, finishing works and external works, systems and internal restructuring

Turnkey projects

“DIMAR” JSC

PLACE: Roreto di Cherasco (CN), Italy DESCRIPTION: Enlargement of a storehouse and a new headquarters office building

slide-12
SLIDE 12

All types of installations – mechanical, electrical, plumbing, fire detection and fire fighting

Installations for Public, Office and Trade buildings

slide-13
SLIDE 13

Installations for Public, Office and Trade buildings

slide-14
SLIDE 14

Installations for Public, Office and Trade buildings

slide-15
SLIDE 15

Perform Business Center – Sofia (36 000 m2)

Installations for Public, Office and Trade buildings

slide-16
SLIDE 16

Installations for Public, Office and Trade buildings

slide-17
SLIDE 17

Interpred World Trade Center -Sofia (36 000 m2)

Reconstruction and modernization of some parts of the building’s installations and full maintenance

Installations for Public, Office and Trade buildings

Biovet - Peshtera Office Park Plovdiv

slide-18
SLIDE 18

Park Central Hotel in Sliven Hotel Soli Invicto in Elenovo

Installations for Public, Office and Trade buildings

slide-19
SLIDE 19

Sofia Airport Center (38 000 m2)

Installations of ultimate technology in Bulgaria implemented in a modern business center near Sofia Airport

Building of the Year 2012 “Business Office Buildings” and “Green Buildings” Bulgaria’s first LEED Gold office building

Installations for Public, Office and Trade buildings

slide-20
SLIDE 20

Installations for Public, Office and Trade buildings

slide-21
SLIDE 21

SEE Green Building Awards

Humidification system

Installations for Public, Office and Trade buildings

slide-22
SLIDE 22

Bring nature into your office space

Microclimate systems in the winter garden

Prix d’Excellence Award – Bulgaria 2013 from The International Real Estate Federation (FIABCI)

Water purification system for lake water

Installations for Public, Office and Trade buildings

slide-23
SLIDE 23

Vertigo Business Center (40 000 m2)

Modern architecture with innovative installations

Building of the Year 2013 “Business Office Buildings”

Installations for Public, Office and Trade buildings

slide-24
SLIDE 24

Installations for Public, Office and Trade buildings

slide-25
SLIDE 25

Installations for Public, Office and Trade buildings

slide-26
SLIDE 26

Miroglio Bulgaria – Elin Pelin, Sliven, Nova Zagora, Yambol, Svishtov, Elenovo

Installations for the industry with high energy efficiency, safeguard and environment friendly

Installations for the Industrial Sector

slide-27
SLIDE 27

Modern factories realized in compliance with the european standards

Installations for the Industrial Sector

Miroglio Bulgaria – Factory in Elin Pelin Miroglio Bulgaria – Factory in Sliven Bulltek – Factory in Plovdiv ABB – Factory in Rakovski Bulsafil – Factory in Plovdiv

slide-28
SLIDE 28

Project Name: ELECTRICAL AND SPECIAL PLANTS Description: Installation and connection of all electrical MV-LV systems related to FM power installation, lighting and general electric distribution (including electrical substations, grounding systems) . Were built, supplied and installed electrical panels of distribution and control/monitoring utilities for each department (laboratories, production areas, etc.). Other data: Installed Power 11.200kW - Plant 45.000 sqm

New FERRERO production facility San Josè de Iturbide, Guanajuato, Mexico FERRERO PLANT Manisa, Turkey

Project Name: ELECTRICAL EQUIPMENT ON BOARD MACHINE Description: Supply and installation of electrical panels to power FAL, Pinguì and Nutella production lines in Ferrero Turkey plant Other data: 3000 utility points

Installations for the Industrial Sector

slide-29
SLIDE 29

New tobacco production facility Philip Morris Bologna, Italy

Project Name: Realization of complete MV/LV electrical systems Description: Realization of electrical systems, Substation MV/LV, distribution, lighting, power supply, electrical support for air conditioning, smoke detection plant

FERRERO production facility and new warehouse Poḉos De Caldas, Brazil

Project Name: ELECTRICAL AND SPECIAL PLANTS Description: Realization of electrical plants in Ferrero Brazil. Realization of electrical substation MV-LV, distriubution plant, lighting, power supply, electrical plants supporting air conditioning systems. Other data: Installed Power 4.800kW - Plant 21.000 sqm

Installations for the Industrial Sector

slide-30
SLIDE 30

Wine production plant – Miroglio Elenovo

Installations for the Industrial Sector

slide-31
SLIDE 31

Building of the Year 2013 “Industrial and logistic buildings”

ABB Bulgaria – factory in Rakovski for production of LV and MV components

Installations for the Industrial Sector

slide-32
SLIDE 32

Installations for the Industrial Sector

slide-33
SLIDE 33

LUKOIL Neftochim Burgas

Heavy Residue Process Complex First phase The largest oil refinery in Southeastern Europe

Installations for the Industrial Sector

slide-34
SLIDE 34

Lighting system

Installations for the Industrial Sector

slide-35
SLIDE 35

The first south-eastern European power plant to comply with EU environmental standards

TPP Maritza Iztok 3 – Bulgaria /908 MW/

Thermal Power Plants and Cogeneration power plants

slide-36
SLIDE 36

Cogeneration power plants

“Alba Power” – Italy (186 MWt, 50 MW)

AlbaPower obtained “green certificates” and energy efficiency certificates, for the destination of the energy produced for civil “tele- heating” and for the improvement of the energy efficiency of the industrial plant.

Thermal Power Plants and Cogeneration power plants

slide-37
SLIDE 37

AlbaPower has received ISO 14001 and EMAS certifications

Thermal Power Plants and Cogeneration power plants

slide-38
SLIDE 38

Hydroelectric Power Plant “Lakatnik”, Bulgaria (3 MW)

The project benefits the environment by helping keep clean the waters of the Iskar River Cascade of nine river-bed hydroelectric power plants on the Iskar River located on the territory of Svoghe Municipality

Hydroelectric Power Plants and Photovoltaic Systems

slide-39
SLIDE 39

Hydroelectric Power Plant “Svrajen” – Bulgaria (3 MW)

No negative impact on the water balance and Fish access ways insure the free passage of fish up and down the river

Hydroelectric Power Plants and Photovoltaic Systems

slide-40
SLIDE 40

Hydroelectric Power Plants “Tserovo”, “Prokopanik”, “Opletnya” Bulgaria

Hydroelectric Power Plants and Photovoltaic Systems

slide-41
SLIDE 41

Photovoltaic park 3 MWp in Shishmantsi, Bulgaria Various type of systems mounted on roofs, facade, on the ground, stationary, tracking

Hydroelectric Power Plants and Photovoltaic Systems

slide-42
SLIDE 42

Photovoltaic park 1,917 MWp in Corridonia (MC), Italy Various type of systems mounted on roofs, facade, on the ground, stationary, tracking

Hydroelectric Power Plants and Photovoltaic Systems

slide-43
SLIDE 43

Photovoltaic system on roof 1 MWp for Miroglio S.p.A. in Castagnole delle Lanze (AT), Italy

Hydroelectric Power Plants and Photovoltaic Systems

slide-44
SLIDE 44

Photovoltaic system 370 kWp on roof in Valenza (AL), Italy

Hydroelectric Power Plants and Photovoltaic Systems

slide-45
SLIDE 45

Supply and installation of all components such as modules, inverters, transformers etc.

  • f the plant

Piadena (CR), Italy

Hydroelectric Power Plants and Photovoltaic Systems

slide-46
SLIDE 46

Photovoltaic system 60 000 kWp in Cassiopea (VT), Italy; electrical substation 150/15 kV

Hydroelectric Power Plants and Photovoltaic Systems

slide-47
SLIDE 47

Photovoltaic system 90 kWp on roof in Alba (CN), Italy

Hydroelectric Power Plants and Photovoltaic Systems

slide-48
SLIDE 48

Photovoltaic plant 990 kWp in Monteporzio (MC), Italy Photovoltaic system 400 kWp in La Morra (CN), Italy

Hydroelectric Power Plants and Photovoltaic Systems

slide-49
SLIDE 49

Photovoltaic system 55 kWp inTorino, Italy Photovoltaic system 136 kWp on roofs in Santa Vittoria d’Alba (CN), Italy Photovoltaic system 200 kWp in Giaveno (TO), Italy

Hydroelectric Power Plants and Photovoltaic Systems

slide-50
SLIDE 50

TPP Maritsa Iztok 3 TPP Maritsa Iztok 3

Switchboards and switchgears for every sector

Electrical Switchboards and Switchgears

slide-51
SLIDE 51

Miroglio Bulgaria - Yambol Vertigo Business Center – Sofia Perform Business Center - Sofia Perform Business Center - Sofia Miroglio Bulgaria - Yambol

Electrical Switchboards and Switchgears

slide-52
SLIDE 52

ContourGlobal Maritsa Iztok 3 TPP ContourGlobal Maritsa Iztok 3 TPP ContourGlobal Maritsa Iztok 3 TPP Miroglio Bulgaria

Electrical Switchboards and Switchgears

slide-53
SLIDE 53

Perform Business Center - Sofia Vertigo Business Center – Sofia Hydroelectric Power Plant Lakatnik

Electrical Switchboards and Switchgears

slide-54
SLIDE 54

Vertigo Business Center – Sofia Miroglio Bulgaria Sofia Airport Center – Tishman International GE Real Estate Perform Business Center – Sofia

Electrical Switchboards and Switchgears

slide-55
SLIDE 55

Building management

Interpred WTC - Sofia

We offer complete management and maintenance Of all the systems In office buildings, trade centers, hotels, industrial buildings Following the principal goal To satisfy the client and to give security and quality

Full and complete maintenance of:

  • Electrical systems and lighting
  • Heating, Ventilation and Air

conditioning system

  • Water supply and sewerage systems
  • Fire detection system and Fire

fighting system

  • Elevators

Building management

slide-56
SLIDE 56

Miroglio Stores in Bulgaria Miroglio Bulgaria Photovoltaic plant in Shishmatsi, Bulgaria

Building management

slide-57
SLIDE 57

Perform Business Center - Sofia Sofia Airport Center Vertigo Business Center - Sofia

Building management

slide-58
SLIDE 58

Electrical Substations 132/15 kV

Electrical Substations 132/15 kV

slide-59
SLIDE 59

Electrical Substations 132/15 kV

slide-60
SLIDE 60

Electrical Substations 132/15 kV

slide-61
SLIDE 61

Quality on all levels

Certificates

slide-62
SLIDE 62

TURNKEY BUILDING SOLUTIONS

9P Kuklensko shose Blvd.– PLOVDIV 4004 – BULGARIA 36 Dragan Tsankov Blvd, Interpred WTC-Sofia –

  • Tel. +359 32 676 145 SOFIA 1040 – BULGARIA

Fax: +359 32 676 140 Tel./fax: +359 2 969 5073 www.energy-ka.net – E-mail: energy-ka@energy-ka.net E-mail: office.sofia@energy-ka.net