MISSION
The CARAGLIO Group is strong owing to the united actions of the companies in the group
which are integrated and complement each other. The CARAGLIO Group is active in the energy sector and it has established its name in the industrial and service sector as a supplier of engineering services, industrial systems and service systems, process automation and development of power generation systems.
Energy-Ка as a representative of the CARAGLIO Group in Bulgaria combines the
knowledge and experience of the Italian companies from the Group. Our main goal is to offer an end-to-end solution to our customers. That is why Energy-Ка designs, develops, constructs, installs and delivers a turnkey project, including construction and building products, all electrical installations and the equipment required for electric power distribution, heating, ventilation and air conditioning systems, fire safety and fire alarm systems, all low-voltage installations and BMS. The end-to-end solution also includes an analysis of the needs taking into account the customer’s requirements, the choice of the best solution and warranting the products and performance by means of providing regular or urgent support depending on the customer’s needs. Our relations with our customers are very important for us. The honest, polite and highly professional manner is the norm in our relations with customers. Energy-Ка is ever committed to its main principles:
PHILOSOPHY Customer satisfaction is at the core of the CARAGLIO Group’s strategy and Energy-Ka’s policy,
in turn, as a group member. The Group pays special attention not only to the price but also to the following main components of delivering services to our customers:
functionality (security, functionality, flexibility);
CARAGLIO CANADA CARAGLIO MEXICO
___________________________________________________________________ We have built Office buildings, logistic centers, trade centers, hotels, hypermarkets in Italy and Bulgaria, such as Logistic center Giordano (40 000 m2), SAC (38 000 m2), Perform (36 000 m2), Vertigo (40 000 m2), Grand’A (37 000 m2), Big Store, Leclerc, Conad, OBI (5 000 m2), Cash and Carry (18 500 m2), Mercato’ (4 000 m2) etc. We are on the Italian market for 40 years, in Bulgaria since 1998
PLACE: ALBA (CN), Italy – Asti Blvd. DESCRIPTION: Construction of a shopping center with hypermarket and adjoining gallery
“COMMERCIAL CENTER ALBACENTER - CONAD”
“COMMERCIAL CENTER BIGSTORE ALBA”
PLACE: ALBA (CN), Italy – Canale Blvd. DESCRIPTION: Construction of a shopping center with hypermarket and adjoining gallery
PLACE: CUNEO, Italy – Madonna dell’Olmo zone DESCRIPTION: Construction of a shopping center with hypermarket and adjoining commercial gallery
COMMERCIAL CENTER “La Grand’A – CUNEO”
“KIMBERLY CLARK”
PLACE: ROMAGNANO SESIA (NO), Italy DESCRIPTION: Construction of a new plant and various further interventions
“FERRERO” JSC confectionery industry
PLACE: ALBA (CN) - Italy DESCRIPTION: Construction of new buildings as well as internal and external refurbishment
“CIEB NUOVA”
PLACE: FOSSANO (CN), Italy – Torino Str. DESCRIPTION: Construction of an industrial building with adjoining offices
PLACE: Biandrate (NO), Italy
“LIDL”
DESCRIPTION: Enlargement of an establishment storehouses finished product “turnkey” Combined roof construction prefabricated/steel, infill walls, finishing works and external works, systems and internal restructuring
“DIMAR” JSC
PLACE: Roreto di Cherasco (CN), Italy DESCRIPTION: Enlargement of a storehouse and a new headquarters office building
All types of installations – mechanical, electrical, plumbing, fire detection and fire fighting
Reconstruction and modernization of some parts of the building’s installations and full maintenance
Installations of ultimate technology in Bulgaria implemented in a modern business center near Sofia Airport
Building of the Year 2012 “Business Office Buildings” and “Green Buildings” Bulgaria’s first LEED Gold office building
SEE Green Building Awards
Humidification system
Microclimate systems in the winter garden
Prix d’Excellence Award – Bulgaria 2013 from The International Real Estate Federation (FIABCI)
Water purification system for lake water
Modern architecture with innovative installations
Building of the Year 2013 “Business Office Buildings”
Miroglio Bulgaria – Elin Pelin, Sliven, Nova Zagora, Yambol, Svishtov, Elenovo
Modern factories realized in compliance with the european standards
Miroglio Bulgaria – Factory in Elin Pelin Miroglio Bulgaria – Factory in Sliven Bulltek – Factory in Plovdiv ABB – Factory in Rakovski Bulsafil – Factory in Plovdiv
Project Name: ELECTRICAL AND SPECIAL PLANTS Description: Installation and connection of all electrical MV-LV systems related to FM power installation, lighting and general electric distribution (including electrical substations, grounding systems) . Were built, supplied and installed electrical panels of distribution and control/monitoring utilities for each department (laboratories, production areas, etc.). Other data: Installed Power 11.200kW - Plant 45.000 sqm
New FERRERO production facility San Josè de Iturbide, Guanajuato, Mexico FERRERO PLANT Manisa, Turkey
Project Name: ELECTRICAL EQUIPMENT ON BOARD MACHINE Description: Supply and installation of electrical panels to power FAL, Pinguì and Nutella production lines in Ferrero Turkey plant Other data: 3000 utility points
New tobacco production facility Philip Morris Bologna, Italy
Project Name: Realization of complete MV/LV electrical systems Description: Realization of electrical systems, Substation MV/LV, distribution, lighting, power supply, electrical support for air conditioning, smoke detection plant
FERRERO production facility and new warehouse Poḉos De Caldas, Brazil
Project Name: ELECTRICAL AND SPECIAL PLANTS Description: Realization of electrical plants in Ferrero Brazil. Realization of electrical substation MV-LV, distriubution plant, lighting, power supply, electrical plants supporting air conditioning systems. Other data: Installed Power 4.800kW - Plant 21.000 sqm
Wine production plant – Miroglio Elenovo
Building of the Year 2013 “Industrial and logistic buildings”
Heavy Residue Process Complex First phase The largest oil refinery in Southeastern Europe
Lighting system
The first south-eastern European power plant to comply with EU environmental standards
AlbaPower obtained “green certificates” and energy efficiency certificates, for the destination of the energy produced for civil “tele- heating” and for the improvement of the energy efficiency of the industrial plant.
AlbaPower has received ISO 14001 and EMAS certifications
The project benefits the environment by helping keep clean the waters of the Iskar River Cascade of nine river-bed hydroelectric power plants on the Iskar River located on the territory of Svoghe Municipality
No negative impact on the water balance and Fish access ways insure the free passage of fish up and down the river
Photovoltaic park 3 MWp in Shishmantsi, Bulgaria Various type of systems mounted on roofs, facade, on the ground, stationary, tracking
Photovoltaic park 1,917 MWp in Corridonia (MC), Italy Various type of systems mounted on roofs, facade, on the ground, stationary, tracking
Photovoltaic system on roof 1 MWp for Miroglio S.p.A. in Castagnole delle Lanze (AT), Italy
Photovoltaic system 370 kWp on roof in Valenza (AL), Italy
Supply and installation of all components such as modules, inverters, transformers etc.
Piadena (CR), Italy
Photovoltaic system 60 000 kWp in Cassiopea (VT), Italy; electrical substation 150/15 kV
Photovoltaic system 90 kWp on roof in Alba (CN), Italy
Photovoltaic plant 990 kWp in Monteporzio (MC), Italy Photovoltaic system 400 kWp in La Morra (CN), Italy
Photovoltaic system 55 kWp inTorino, Italy Photovoltaic system 136 kWp on roofs in Santa Vittoria d’Alba (CN), Italy Photovoltaic system 200 kWp in Giaveno (TO), Italy
TPP Maritsa Iztok 3 TPP Maritsa Iztok 3
Switchboards and switchgears for every sector
Miroglio Bulgaria - Yambol Vertigo Business Center – Sofia Perform Business Center - Sofia Perform Business Center - Sofia Miroglio Bulgaria - Yambol
ContourGlobal Maritsa Iztok 3 TPP ContourGlobal Maritsa Iztok 3 TPP ContourGlobal Maritsa Iztok 3 TPP Miroglio Bulgaria
Perform Business Center - Sofia Vertigo Business Center – Sofia Hydroelectric Power Plant Lakatnik
Vertigo Business Center – Sofia Miroglio Bulgaria Sofia Airport Center – Tishman International GE Real Estate Perform Business Center – Sofia
Interpred WTC - Sofia
We offer complete management and maintenance Of all the systems In office buildings, trade centers, hotels, industrial buildings Following the principal goal To satisfy the client and to give security and quality
Full and complete maintenance of:
conditioning system
fighting system
Miroglio Stores in Bulgaria Miroglio Bulgaria Photovoltaic plant in Shishmatsi, Bulgaria
Perform Business Center - Sofia Sofia Airport Center Vertigo Business Center - Sofia
Quality on all levels
TURNKEY BUILDING SOLUTIONS
9P Kuklensko shose Blvd.– PLOVDIV 4004 – BULGARIA 36 Dragan Tsankov Blvd, Interpred WTC-Sofia –
Fax: +359 32 676 140 Tel./fax: +359 2 969 5073 www.energy-ka.net – E-mail: energy-ka@energy-ka.net E-mail: office.sofia@energy-ka.net