Construction Update Musick Library Elevator Tower Wallman Hall Renovations Turley Student Access & Success Center Hardway Hall Renovations Musick Library Elevator Tower Musick Library Elevator Tower Wallman Hall Renovations Wallman Hall


  1. Construction Update Musick Library Elevator Tower Wallman Hall Renovations Turley Student Access & Success Center Hardway Hall Renovations

  2. Musick Library Elevator Tower

  3. Musick Library Elevator Tower

  4. Wallman Hall Renovations

  5. Wallman Hall Renovations

  6. Wallman Hall Renovations

  7. Turley Student Access & Success Center

  8. Turley Student Access & Success Center

  9. Hardway Hall Renovations

  10. Construction Staging

  11. Follow us on the web… Construction Updates & Other Physical Plant News • http://www.fairmontstate.edu/adminfiscalaffairs/physical-plant • http://www.pierpont.edu/adminfiscalaffairs/physical-plant QUESTIONS/ CONCERNS DIAL 4110 •

  12. Repair, Pave & Drainage of Tennis Court Road Paving at Pence Hall Painting of Colebank Gym & Lobby Repair, Seal, & Waterproofing of Parking Garage 6 th Floor Fire Alarm Systems in Pence and Prichard Hall Cleaning of Dormitories Remove and Replace Retaining Wall at Bryant Place Striping of Entire Campus Falcon Center ADA Bathroom Renovations Dust Collection System for Engineering Building Demolition of Warner Property Hunt Haught Hall Upgrades to Vet Tech Demolition of Bank Bldg at Caperton Saniglaze of Dorm Restrooms Landscaping at Caperton and Byrd Center HVAC Project at Byrd Center Falcon Center Loading Dock Paving & Striping at Byrd Center Lighting Replacement in Hanger at Byrd Center Student Workers painted Falcon Center

  13. Student Workers painted Dorms Football Locker Room Project Pablanos was remodeled to incorporate a new Hershey Ice Cream Shop (Convenience items were relocated to the Bookstore) Remodeled Main Street Market for Conferencing Business Repair & Paint Exterior of Presidents House Install New Domestic Hot Water System at Pence Demo & Replace Concrete Entrance at Prichard Folklife Center Garden & Hillside Drainage Multiple Office Moves and Relocations Slippage at Prichard Hall & Education Building Updated and Installed New Fire Hydrants New VCT Tile at Byrd Center Sealing & Stripping of Parking Lots Sprinkler Head Replacement in Colebank, Engineering, & Feaster Ceiling Tile Replacement in Hallways & Common Areas of Prichard & Morrow Hall Heating & Cooling Upgrades at Physical Plant Renovation to Tiered Classroom in Education Building Braxton County Renovation for Health Careers Hunt Haught Hall Computer Lab Compressor & Air Lines in Hanger at Byrd Center

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.