On behalf of
QUALITY HOMES IN GREAT COMMUNITIES
On behalf of
QUALITY HOMES IN GREAT COMMUNITIES
Condition survey summary Asset Strategy - June 2014 QUALITY HOMES - - PowerPoint PPT Presentation
Evening meeting T158 Grosvenor Externals Condition survey summary Asset Strategy - June 2014 QUALITY HOMES IN GREAT COMMUNITIES QUALITY HOMES IN GREAT COMMUNITIES On behalf of On behalf of Blocks proposed to be included in the scheme Abady
On behalf of
QUALITY HOMES IN GREAT COMMUNITIES
On behalf of
QUALITY HOMES IN GREAT COMMUNITIES
On behalf of
QUALITY HOMES IN GREAT COMMUNITIES
6
On behalf of
QUALITY HOMES IN GREAT COMMUNITIES
Year Works completed Blocks
2009 P162 - External redecoration, together with associated window and other minor repairs and the internal redecoration of all common parts. Refurbish the concrete stairs and landings and recover the flat roof areas. Abady House Edric House 2008 M125 - Window and staircase repairs including redecoration of internal and external areas along with repairs to the concrete stairs and landing where defective. Bennett House 2006 J131 - New roof coverings to the flat roofs. Abady House Bennett House Edric House Redecoration of internal parts and replacement of floor coverings. Bennet House Schomberg House
2003 F317 - Installation of horizontal fall arrest system, renewal of roof access. Abady House Decoration of internal and external communal areas, essential roof works, replacement of worn parts of windows, jetting of drains, works to drain pipes and any associated works. Jessel House 2002 Repairs to balcony asphalt and stair balustrades. Renewal of mastic jointing and joinery repairs to windows and sills, Repairs to rainwater goods, guttering and jet cleaning of gullies. External redecoration of all painted surfaces and ventilation works. Abady House Edric House Schomberg House 2002 Preparation and reinstatement of Damp proofing. Jessel House 2001 Exterior repairs & redecoration. Other works include the renewal of defective rainwater goods and internal decoration to stairwell surfaces. Bennett House 1998 Grosvenor Estate - Phase 4. Refurbishment & Estate Works. Bennett house 1995 Repairs & redecorations to exterior and interior common parts. Jessel House
On behalf of
QUALITY HOMES IN GREAT COMMUNITIES
Abady House- 84 properties, 64 tenants, 20 lessees
cracking to the concrete staircase landings/treads.
and faces. Black painted metal gates require redecoration.
blocks in the open bin store have been removed. FRA
electric meter boxes have been fitted into the protected zone and the outer skin of brickwork removed, penetrations between the meter housing and flat beyond were also noted. Meters should be relocated inside the flat and the protected zone reinstated.
zone of 1100mm in provided.
separation and should be replaced on next block refurb.
On behalf of
QUALITY HOMES IN GREAT COMMUNITIES
Bennett House - 72 properties, 44 tenants, 28 lessees
caused cracking to the concrete staircase landings/treads.
with a fungicidal wash
useful life. FRA
upgrade windows to flats in dead end sections during next block refurbishment.
On behalf of
QUALITY HOMES IN GREAT COMMUNITIES
Edric House - 84 properties, 52 tenants, 32 Lessees
caused cracking to the concrete staircase landings/treads.
FRA
upgraded during next block refurbishment.
doors on next block refurbishment.
On behalf of
QUALITY HOMES IN GREAT COMMUNITIES
Jessel House- 90 properties, 41 tenants, 49 lessees
some flaking paint and water ingress and should be programmed for redecoration.
low level brickwork on Page Street needs cleaning down and repointing.
FRA
heads
cables pass out missing. Replace with FD30s and reinstate missing infill panel,
On behalf of
QUALITY HOMES IN GREAT COMMUNITIES
Schomberg House – 72 properties, 50 tenants, 22 lessees
repointing and cleaning down and treating with a fungicidal wash. Black painted metal gates and railings require redecoration.
slates refixing into position.
heads inside each dwelling is required as compensation for single direction of travel; extended travel distances (due to discounting of roof SME) and age and construction of block, in accordance with the LACORS fire safety guide.
between flat 72 and staircase cable penetration between roof SME staircase enclosure and main staircase - LHS wall to all blocks pipe penetration above flat 39 and 32 doors cable penetrations to RHS above doorway to flats 22, 24 and 25.
maintained.
during next block refurbishment.
On behalf of
QUALITY HOMES IN GREAT COMMUNITIES
Abady House- 84 properties, 64 tenants, 20 lessees
On behalf of
QUALITY HOMES IN GREAT COMMUNITIES
Bennett House - 72 properties, 44 tenants, 28 lessees
On behalf of
QUALITY HOMES IN GREAT COMMUNITIES
Edric House - 84 properties, 52 tenants, 32 Lessees
On behalf of
QUALITY HOMES IN GREAT COMMUNITIES
Jessel House- 90 properties, 41 tenants, 49 lessees
On behalf of
QUALITY HOMES IN GREAT COMMUNITIES
Schomberg House – 72 properties, 50 tenants, 22 lessees