Alfa Laval Condition Audit
Gain insights about the actual condition of your Alfa Laval gasketed plate heat exchanger and optimize it for the future.
A service from Alfa Laval 360° Service Portfolio
Condition Audit Gain insights about the actual condition of your - - PowerPoint PPT Presentation
Alfa Laval Condition Audit Gain insights about the actual condition of your Alfa Laval gasketed plate heat exchanger and optimize it for the future. A service from Alfa Laval 360 Service Portfolio Alfa Laval Condition Audit Gasketed Plate
A service from Alfa Laval 360° Service Portfolio
www.alfalaval.com
Gasketed Plate Heat Exchangers
– Detailed mechanical condition – Need of repair – Remaining gasket lifetime prediction*
– Maintenance plan – Strategic spare parts – Cleaning services
Why should an Alfa Laval Condition Audit be performed?
*Only possible when PHE is not in operation
www.alfalaval.com
Alfa Laval Condition Audit Gasketed Plate Heat Exchangers
How is an Alfa Laval Condition Audit performed?
Analysis of customer data Onsite inspection visit using standardized procedures Delivery of Condition Audit report including feedback and discussion on actual state and future needs Perform actions to improve/optimize the plate heat exchanger In operation PHE connected to process Not in
PHE not connected to process
www.alfalaval.com
Alfa Laval Condition Audit Gasketed Plate Heat Exchangers
– Frame and bolt condition – General plate condition – General gasket condition – Spare parts inventory
checking: – Gasket lifetime prediction – Detailed plate condition including plate deformation test – Detailed frame condition including connection linings – Fouling evaluation
www.alfalaval.com
Alfa Laval Condition Audit Gasketed Plate Heat Exchangers
Serving non-Alfa Laval equipment
years of experience
models
such as Alfa Laval Cleaning Services GPHE and Alfa Laval Performance Audit GPHE
www.alfalaval.com
Alfa Laval Condition Audit Gasketed Plate Heat Exchangers
Knowing the condition of an Alfa Laval gasketed plate heat exchanger allows customers to: – Optimize maintenance plans – Secure production – Prevent safety issues – Improve control of maintenance budget – Increase equipment lifetime
www.alfalaval.com
Alfa Laval Condition Audit Gasketed Plate Heat Exchangers
An Alfa Laval Condition Audit should be considered when any of the following circumstances exist:
(large, exotic materials)
www.alfalaval.com
Alfa Laval Condition Audit Gasketed Plate Heat Exchangers
Exchangers
Exchangers
Heat Exchangers
Heat Exchangers
Plate Heat Exchangers
www.alfalaval.com
Alfa Laval Condition Audit Gasketed Plate Heat Exchangers
One out of four big Alfa Laval units installed in a sulphuric acid plant in South America started to leak, due to worn-out gaskets, a few months after a scheduled
for four weeks due to gasket replacement. If an Alfa Laval Condition Audit had been performed at an earlier stage, the poor condition of the gaskets would have been
reconditioned during a scheduled shutdown and the production losses prevented.
Results
production loss
* Production loss calculation: One unit out of operation => 25% production loss = 250 tons/week Total loss: 250 tons x 4 weeks x 150 €/ton = € 150,000
POTENTIAL SAVINGS VALUE HOW Potential production savings* € 150,000 Gasket lifetime prediction Total savings € 150,000 Alfa Laval Condition Audit
www.alfalaval.com
Alfa Laval Condition Audit Gasketed Plate Heat Exchangers
– Alfa Laval Condition Audits are performed by highly qualified Alfa Laval service engineers with extensive gasketed plate heat exchanger and process knowledge
– Audit results, together with service and upgrade recommendations, are delivered to the customer in a detailed audit report
www.alfalaval.com
Alfa Laval Condition Audit Gasketed Plate Heat Exchangers
Knowing the condition of an Alfa Laval gasketed plate heat exchanger can lead to:
www.alfalaval.com
Alfa Laval Condition Audit Gasketed Plate Heat Exchangers
www.alfalaval.com
Alfa Laval Condition Audit Gasketed Plate Heat Exchangers
Remaining gasket lifetime prediction
Remaining gasket lifetime depends on:
Alfa Laval material reference database)
Gasket compression set > 80% ‒ High risk for leakage. Plan for immediate change of gaskets.
Gasket compression set*
*Permanent gasket deformation, which reduces the sealing force
Gasket compression set (%) Time Limit: 80% Actual value Date of audit Remaining lifetime
www.alfalaval.com
Deformed gasket groove Reduced gasket compression Reduced sealing force
Increased risk for leakage
Alfa Laval Condition Audit Gasketed Plate Heat Exchangers Plate deformation test
Deformed gasket groove Fully compressed gasket Less compressed gasket due to deformed gasket groove Gasket compression > 25% ‒ Gasket compression is OK. Gasket compression 20% - 25% ‒ Gasket compression is reduced. Gasket compression < 20% ‒ Gasket compression is too low. Action should be taken.