Completed Rehab of Level 1 and Level 3 Completed Bypass Adit and Entry into Level 1 Designed Level 1 Bulkhead Constructed Level 1 Bulkhead Sealed Raises within Level 3 Level 1: Grout Bulkhead Install Gate Valve
Completed Rehab of Level 1 and Level 3 Completed Bypass Adit and Entry into Level 1 Designed Level 1 Bulkhead Constructed Level 1 Bulkhead Sealed Raises within Level 3
- Level 1:
- Grout Bulkhead
- Install Gate Valve
- Install Flume and Instrumentation
- Complete Installation of Portal Structure
- Level 3:
- Complete rehab
- Mine Raises: Chemically seal concrete
to the rock
- Install mine portal structure
- Construct drainage channel
- Complete Repository Closure
- Level 2:
- Geophysics to intercept Level 2
- Well installation
- Dewater Level 2
Tas Task N Nam ame Days ays Sta Start Fi Fini nish
Construction
- n A
Activiti ties
61
Mon 7/ n 7/17/ 17/17 17 Mon 9/ n 9/25/ 25/17 17 Level 1 Construction 19 Mon 7/25/17 Tue 8/15/17 Level 3 Construction 26 Wed 8/25/17 Fri 9/14/17 Conveyance Channel Construction 13 Tue 8/15/17 Wed 8/30/17 Repository Closure 11 Thu 8/31/17 Thu 9/14/17 Demobilize 10 Thu 9/14/17 Mon 9/25/17 Level el 2 47 47 Mon 7/ n 7/10/ 10/17 17 Wed 9/ 9/13/ 13/17 17 Geophysics Field Work 5 Mon 7/10/17 Fri 7/14/17 Geophysics Interpretation 15 Mon 7/17/17 Mon 8/7/17 Well Installation 6 Mon 8/14/17 Tue 8/22/17 Dewatering 21 Wed 8/23/17 Wed 9/13/17 Stakeh eholder er V Visit 1 Wed 9/ 9/15/ 15/17 17 Wed 9/ 9/15/ 15/17 17
- Goal: Monitor to evaluate the
need for Phase II Remedial Action (Treatment of Mine Discharge)
- 2017 Plan:
- Monitoring flow, water quality, and
metals from Level 1 and 3
- Monitoring of water quality and