Company Trent & Dove Housing Country England, UK City - - PowerPoint PPT Presentation

company trent dove housing country england uk city
SMART_READER_LITE
LIVE PREVIEW

Company Trent & Dove Housing Country England, UK City - - PowerPoint PPT Presentation

Energy Saving Group | May, 16 2014 | Darmstadt, Germany Company Trent & Dove Housing Country England, UK City Staffordshire Name and surname Steve Grocock Energy Saving Group | May, 16 2014 | Darmstadt, Germany Pilot site overall


slide-1
SLIDE 1

Energy Saving Group | May, 16 2014 | Darmstadt, Germany

Company Trent & Dove Housing Country England, UK City Staffordshire Name and surname Steve Grocock

slide-2
SLIDE 2

Energy Saving Group | May, 16 2014 | Darmstadt, Germany

Pilot site name East Staffordshire City Burton on Trent / Uttoxeter & surrounding areas Year of construction 1964 - 1989 N° of dwellings 133 N° of floors Bungalows Total floor surface 42m2

Pilot site overall informations

Please paste a map showing the location of your pilot site here

slide-3
SLIDE 3

Energy Saving Group | May, 16 2014 | Darmstadt, Germany

Pilot site overall informations

Please paste a picture of your pilot site here Please paste a picture of your pilot site here

slide-4
SLIDE 4

Energy Saving Group | May, 16 2014 | Darmstadt, Germany

Pilot site overall informations

Please paste a picture of your pilot site here Please paste a picture of your pilot site here

slide-5
SLIDE 5

Energy Saving Group | May, 16 2014 | Darmstadt, Germany

Pilot site overall informations

Please paste a picture of your pilot site here Please paste a picture of your pilot site here

slide-6
SLIDE 6

Energy Saving Group | May, 16 2014 | Darmstadt, Germany

Energy consumption (energy certification) TBC Generator for heating Was electric storage heaters, now GSHP Generator for hot water Was immersion heater, now GSHP Type of windows Double glazed PVCu Walls insulated (Y/N) Yes – Cavity Wall Insulation Roof insulated (Y/N) Yes Floor insulated (Y/N) No Mechanical ventilation (Y/N) No

Pilot site thermal informations

Please paste a thermal picture (if available) of your pilot site here or another interesting image

slide-7
SLIDE 7

Energy Saving Group | May, 16 2014 | Darmstadt, Germany

Description of the expected works to be realized

“Micro district” ground source heat networks retrofitted into existing

  • properties. The existing night storage

heaters will be replaced with heat pumps which are connected to a ground source heat pump network system, harnessing support funding through a combination of the ECO & the Non Domestic Renewal Heat Incentive (RHI). A traditional ‘wet’ system will then be installed internally.

Expected design begin date December 2014 Expected works begin date

January 2015

Tenants will stay inside Yes Is there an energy consumption target? Half tenants energy bills, estimated savings p.a. between £350-£550 Budget for works Costs = £1.8m (estimated income = £2.3m)

Prevision of works

Please paste pilot site’s plan here