Community Response for Pipeline Safety Berkshire County, Massachusetts Berkshire Regional Planning Commission Massachuse5s Presented by Thomas Matuszko, AICP Northeast Energy Direct &


slide-1
SLIDE 1

Community Response for Pipeline Safety Berkshire County, Massachusetts

Berkshire ¡Regional ¡Planning ¡Commission ¡ Massachuse5s ¡ Presented ¡by ¡Thomas ¡Matuszko, ¡AICP ¡

slide-2
SLIDE 2
slide-3
SLIDE 3
slide-4
SLIDE 4
slide-5
SLIDE 5
slide-6
SLIDE 6

Northeast Energy Direct & Connecticut Expansion Projects

slide-7
SLIDE 7

Connecticut Expansion Project

  • Pipeline ¡loop ¡(the ¡“Massachuse5s ¡Loop”) ¡along ¡the ¡exisFng ¡

Tennessee ¡Gas ¡200 ¡Line ¡to ¡increase ¡the ¡volume ¡of ¡gas ¡to ¡provide ¡a ¡ modest ¡expansion ¡of ¡capacity ¡

  • 3.8-­‑mile ¡36-­‑inch ¡outside ¡diameter ¡(OD) ¡pipeline ¡within ¡or ¡adjacent ¡to ¡

the ¡exisFng ¡Tennessee ¡Gas ¡right-­‑of-­‑way ¡(ROW) ¡in ¡Sandisfield ¡ ¡

  • Appurtenant ¡faciliFes ¡-­‑ ¡mainline ¡valves, ¡blowdown ¡valves, ¡pig ¡

launchers, ¡pig ¡receivers, ¡other ¡valves ¡and ¡piping ¡and ¡pipeyard/staging ¡ areas ¡ ¡

  • Withdrawal ¡of ¡more ¡than ¡one ¡million ¡gallons ¡of ¡water ¡from ¡Lower ¡

Spectacle ¡Pond ¡in ¡Sandisfield ¡for ¡a ¡hydrostaFc ¡test ¡ ¡

slide-8
SLIDE 8

Northeast Energy Direct (NED)

  • Approximately ¡188 ¡miles ¡of ¡new ¡and ¡collocated ¡36-­‑inch-­‑diameter ¡

pipeline ¡and ¡pipeline ¡faciliFes ¡extending ¡from ¡Wright, ¡New ¡York ¡ through ¡Berkshire, ¡Hampshire ¡and ¡Franklin ¡CounFes. ¡From ¡ Massachuse5s, ¡southern ¡New ¡Hampshire ¡and ¡then ¡reenter ¡ Massachuse5s ¡and ¡terminate ¡in ¡Dracut ¡(“Market ¡Path ¡Component” ¡

  • f ¡the ¡NED ¡Project). ¡
slide-9
SLIDE 9

NED Impacts

  • Public ¡Safety ¡and ¡Health ¡
  • TransportaFon ¡and ¡Local ¡

Infrastructure ¡

  • Compressor ¡StaFons ¡
  • Drinking ¡Water ¡
  • Rivers, ¡Streams, ¡

Waterbodies, ¡and ¡Wetlands ¡

  • Invasive ¡Plants ¡
  • Special ¡Species ¡Status ¡and ¡

Special ¡Interest ¡Areas ¡

  • Socio-­‑Economic ¡and ¡Fiscal ¡

Issues ¡

  • Impacts ¡to ¡Property ¡Owners ¡

¡

slide-10
SLIDE 10

Community Context

  • Limited Staff
  • Home Rule
  • No County

Government

slide-11
SLIDE 11

“Downtown” ¡ Windsor ¡MA ¡

slide-12
SLIDE 12

Process

  • Feb. ¡2014 ¡

1st ¡Request ¡ March ¡2014 ¡ PHMSA ¡ Grant ¡ ApplicaFon ¡

  • Sept. ¡2014 ¡

PHSMA ¡ Grant ¡Start ¡

  • Sept. ¡2014 ¡

FERC ¡ ¡ ¡ ¡ ¡ ¡ Pre-­‑filing ¡ April ¡-­‑ ¡July ¡ 2015 ¡ Workshops ¡ FERC ¡NOI ¡ June ¡2015 ¡

  • Oct. ¡ ¡2015 ¡

EIS ¡ Comments ¡ May ¡2016 ¡ FERC ¡ ApplicaFon ¡ Withdrawn ¡

slide-13
SLIDE 13

Working Group

  • 9 Berkshire County Communities
  • 3 New

York Communities

  • Select Boards & Town Administrators
  • Exchange Information
  • Understand and meaningfully

participate in the FERC process

  • Shared approach to negotiations
slide-14
SLIDE 14

Public Workshops

  • Roles & Responsibilities
  • Federal Preemption
  • When & How to Participate
  • Pipeline Construction 101
  • How to minimize potential impacts

Participation

Public access to information Involvement of local government, regulators,

  • perators, industry, and agencies

Prevention

Appropriate siting and routing of pipelines Appropriate community development around pipelines Clear and consistent regulations Reduction of pipeline incidents

Preparedness

Knowledge of pipelines, their products, and locations Risk assessment Operations and maintenance Emergency response and preparedness planning

slide-15
SLIDE 15

Emergency Response Training

  • Volunteer Fire Departments
  • One Hazardous Response Team for

Berkshire County

  • Limited Resources
  • Limited Equipment
  • Limited Access
slide-16
SLIDE 16

Environmental Review & Land Use Analysis

  • Monitoring filings
  • Sorting through information
  • Communicating with FERC

through the pre-filing process

  • Developing meaningful comments
  • Strength in numbers
  • Regional context
slide-17
SLIDE 17

TAG Grant

  • Educa&on ¡and ¡Awareness ¡Program ¡
  • 1. Engage ¡the ¡community ¡and ¡local ¡officials ¡
  • 2. Develop ¡educaFon ¡and ¡awareness ¡program ¡
  • 3. Conduct ¡4 ¡workshops ¡
  • 4. Compile ¡web-­‑based ¡resources ¡
  • Environmental ¡Review ¡and ¡Land ¡Use ¡Analysis ¡
  • 1. Compile ¡model ¡review ¡and ¡analysis ¡of ¡potenFal ¡land ¡use ¡impacts ¡
  • Pipeline ¡Failure ¡Emergency ¡Response ¡Training ¡
  • 1. Day-­‑long ¡emergency ¡response ¡training ¡

√ ¡ √ ¡ √ ¡

slide-18
SLIDE 18

23% 16% 38% 23%

Combined Effort

USDOT PHMSA Grant MA District Local Technical Assistance Municipal Appropriations BRPC

slide-19
SLIDE 19

Key Issues & Lessons Learned

  • Multiple and substantial resources

are needed

  • Be prepared to make a sustained

commitment

  • “Neutrality” is challenging
  • Towns were willing to provide

financial resources to participate in this process

slide-20
SLIDE 20

Key Issues & Lessons Learned

  • Finding experts that aren’t

conflicted is a challenge – get them early

  • Use experts that had been through

the process

  • Participating in the FERC led

regular Pre-Filing Conference calls was indispensable

  • Constantly watch the schedule
slide-21
SLIDE 21

Other Observations

  • Surprised ¡at ¡the ¡inadequacy ¡
  • f ¡the ¡informaFon ¡in ¡the ¡

iniFal ¡filing ¡

  • Extensive ¡resources ¡were ¡

expended ¡prior ¡to ¡the ¡ determinaFon ¡of ¡market ¡ need ¡

slide-22
SLIDE 22

Thank you

Thomas Matuszko, Assistant Director Berkshire Regional Planning Commission 1 Fenn Street, Suite 201 Pittsfield, MA 01201 413-442-1521 ex 34 tmatuszko@berkshireplanning.org www.berkshireplanning.org

¡