Tullamarine Landfill Community Meeting
30 March 2016
Community Meeting 30 March 2016 Stormwater Connection Improved - - PowerPoint PPT Presentation
Tullamarine Landfill Community Meeting 30 March 2016 Stormwater Connection Improved Design Landscaped Channel No Pipe Concrete Pits and Pipes Amended Landscaped Channel Weir Landscaped Channel Road Crossing Instead of Concrete Pipe.
30 March 2016
Landscaped Channel Landscaped Channel Road Crossing Landscaped Channel Instead of Concrete Pipe. No Pipe Weir Concrete Pits and Pipes Amended
Currently Updating the Management and Monitoring Plan
Information on current monitoring frequency will be provided with Technical Review information
TECHNICAL REVIEW
Currently with the Auditor
The Technical Review Report will be ready for the community by end of April
Monitoring & Management Plan, including contingency requirements, will be included
Upon receipt of final report, welcome a special briefing session with community before next meeting
Proposed Locations On Airport Land Prepared by Cardno Lane Piper for Cleanaway
Proposed Locations Proposed Locations Non regulatory requirement
Flare sampling for methane destruction efficiency will take
A second full emissions test is to be completed after methane
Ambient
Ambient air monitoring will be undertaken concurrently with
Outlet Sample Point Blower Water Knock Out Pot Inlet Sample Point Calibrated Data Collection System Flow Temperature Methane %
Landfill Gas Inlet Combustion Air Inlet Methane Detector Sample Canister for Laboratory Sample Canister for Laboratory