Community Consultative Committee 10 July 2014 Agenda item 3 - - - PowerPoint PPT Presentation

community consultative committee 10 july 2014 agenda item
SMART_READER_LITE
LIVE PREVIEW

Community Consultative Committee 10 July 2014 Agenda item 3 - - - PowerPoint PPT Presentation

Community Consultative Committee 10 July 2014 Agenda item 3 - Correspondence Approval of AHMP by Department of Planning. 2 Agenda item 4 Operations - Blasting undertaken for overburden removal and drop cut formation for the pit proper


slide-1
SLIDE 1

Community Consultative Committee 10 July 2014

slide-2
SLIDE 2

2

Agenda item 3 - Correspondence

  • Approval of AHMP by Department of Planning.
slide-3
SLIDE 3

3

Agenda item 4 – Operations

  • Blasting undertaken for overburden removal and drop cut formation for the pit proper
  • Target of Easter next year to move the crusher into the pit
  • Overburden removal contract in place
  • Feedback from customers very positive
  • 100,000 tonnes of product transported by rail to Maldon / St Peters and Enfield per month now
  • Day and night shift operations
  • Team of 16 in place with further recruitment to come
slide-4
SLIDE 4

4

Agenda item 5 – OH&S Performance

  • Only 1 LTI over the course of

construction at the Limestone sand plant

  • Occupational noise monitoring

conducted for the operations

  • DTI Electrical Audit
  • Audits to be conducted to review

registers / signage/ traffic management

slide-5
SLIDE 5

5

Agenda Item 6 - Environmental Performance Incidents (EPL period June 2013 – July 2014)

July - 2 minor oil leaks from broken hydraulic hoses have been reported. Less than 1 litre of oil was spilt each time. Spills were cleaned up and equipment repaired after an investigation as to the cause of the hose failures. October – 1 minor oil leak from an EWP. Spill was contained and cleaned up. Dust emitted from Sand Plant during commissioning following the loosening of a clamp. Nov – dust from train unloading at Maldon Jan – 2 oil spills associated with fire sprinkler system and loose drain tap, dust from TLO silo due to leaking door Feb – broken hydraulic hose June – broken hydraulic hose (EPL period June 2013 to July 2014)

Environmental Incidents (EPL period July 2013-july 2014)

0.5 1 1.5 2 2.5 3 3.5

Jul- 13 Aug- 13 Sep- 13 Oct- 13 Nov- 13 Dec- 13 Jan- 14 Feb- 14 Mar- 14 Apr- 14 May- 14 Jun- 14

month # of incidents

slide-6
SLIDE 6

6

Agenda item 6 – Environmental Performance Complaints

Peppertree Quarry Complaints 2013 - 2014

2 4 6 8 10 12 14 Jul-13 Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14

Month

  • No. of complaints
  • No. of complaints
slide-7
SLIDE 7

7

Agenda item 6 – Environmental Performance Air

Site 1: Onsite (North west Boundary) / Site 2: 683 Marulan South Road / Site 3: 432 Long Point Road, Tallong Annual Average goal of 4gm2/month - Levels in compliance at all sites with the exception of site 1. this is attributed to wind blown dust from rail

  • perations west of the Quarry site.

Insoluble solids (EPL 2013-2014)

0.00 5.00 10.00 15.00

Jul-2013 Aug- 2013 Sep- 2013 Oct- 2013 Nov- 2013 Dec- 2013 Jan- 2014 Feb- 2014 Mar- 2014 Apr- 2014 May- 2014 Jun- 2014 Annual average

Month mg/m3 site 1 Insoluble solids site 2 Insoluble solids site 3 Insoluble solids Insoluble solid goal

slide-8
SLIDE 8

8

Agenda item 6 – Environmental Performance Air – Particulate Matter <10 microns (EPL period June 2013 – July 2014)

PM10 below annual average goal No exceedence of PM10 24hour goal

slide-9
SLIDE 9

9

Agenda item 6 – Environmental Performance Air - Total Suspended Particulates (EPL period June 2013 – July 2014)

TSP below Annual average goal

Peppertree Quarry TSP 2013- 2014

20 40 60 80 100 120 24/7/13 17/08/20 10/9/13 4/10/13 28/10/13 21/11/13 15/12/13 8/1/14 1/2/14 25/2/14 21/03/20 14/4/14 8/5/14 1/6/14 Annual date TSP ug/m3 TSP TSP annual average goal

slide-10
SLIDE 10

10

Agenda item 6 – Environmental Performance Noise - quarterly noise monitoring April 2014

Receiv eive r Date Site e Noise Lev evel el Cont ntribut ibutio ion Oper erat ation ional al Criteria ria (dB(A) B(A)) EPL ID Name LAeq, eq, 15 minut nute e (dB(A) B(A)) 2 Ordasi 15 April 2014 28 39 2 Ordasi 15 April 2014 29 39 5 Cooper 15 April 2014 20 35 5 Cooper 15 April 2014 21 35 6 Bartolo 15 April 2014 31 35 6 Bartolo 15 April 2014 29 35 16 Pace 15 April 2014 20 41 16 Pace 15 April 2014 <20 41

In compliance

slide-11
SLIDE 11

11

Agenda item 6 – Environmental Performance Noise - quarterly noise monitoring April 2014

Receiv eive r Date Site e Noise Lev evel el Cont ntribut ibutio ion Oper erat ation ional al Criteria ria (dB(A) B(A)) EPL ID Name LAeq, eq, 15 minut nute e (dB(A) B(A)) 2 Ordasi 16 April 2014 <20 39 2 Ordasi 16 April 2014 30 39 2 Ordasi 16 April 2014 32 39 5 Cooper 16 April 2014 <20 35 6 Bartolo 16 April 2014 28 35 16 Pace 16 April 2014 <20 41

In compliance

slide-12
SLIDE 12

12

Environmental Performance Noise - quarterly noise monitoring April 2014

Receiv eive r Date Site e Noise Lev evel el Cont ntribut ibutio ion Oper erat ation ional al Criteria ria (dB(A) B(A)) EPL ID Name LAeq, eq, 15 minut nute e (dB(A) B(A)) 5 Cooper 17 April 2014 29 35 5 Cooper 17 April 2014 27 35 6 Bartolo 17 April 2014 27 35 6 Bartolo 17 April 2014 27 35 16 Pace 17 April 2014 35 41 16 Pace 17 April 2014 33 41

In compliance

slide-13
SLIDE 13

13

Environmental Performance Noise - quarterly noise monitoring April 2014 (evening)

Receiv eive r Date Site e Noise Lev evel el Cont ntribut ibutio ion Oper erat ation ional al Criteria ria (dB(A) B(A)) EPL ID Name LA1, 1, 1 minut nute e (dB(A) B(A)) LA1, 1, 1 minut nute e (dB(A) B(A)) 2 Ordasi 15 April 2014 33 45 2 Ordasi 15 April 2014 40 45 5 Cooper 15 April 2014 18 45 5 Cooper 15 April 2014 20 45 6 Bartolo 15 April 2014 29 45 6 Bartolo 15 April 2014 29 45 16 Pace 15 April 2014 43 45 16 Pace 15 April 2014 38 45

In compliance

slide-14
SLIDE 14

14

Environmental Performance Noise - quarterly noise monitoring 15 to 17 April 2014 (cumulative - unattended)

Recei ei v e r Over erall all Ambie ient nt Noise Lev evel el Estim imated d Site e Noise Level evel Cont ntribut ibutio ion Cumulat ulativ ive Oper erat ation ional al Noise Impa pact asses essment nt Crit iter eria ia (dB( dB(A)) A))

day evening night day evening night day evening night

EPL EPL I D Name 2 Ordasi 41 41 40 <30 <30 32 50 45 49 5 Cooper 49 42 42 <30 <30 29 50 45 49 6 Bartolo 43 36 43 31 <30 27 50 45 49 16 Pace 54 36 42 <30 <30 35 50 45 49

In compliance

slide-15
SLIDE 15

15

Agenda item 6 – Environmental Performance Blast monitoring

Loca catio tion Blast st Date te Ground Vibra ratio tion Resu sult lt GV Complian iant Overpre rpressu ssure re Resu sult lt OP Comp mplian iant North West Boundary 22nd May 2014 No trigger YES No trigger YES North East Boundary 22nd May 2014 0.73 YES 104.2 YES 683 Marulan South Road 22nd May 2014 No trigger YES No trigger YES Pace Residence 22nd May 2014 No trigger YES No trigger YES North West Boundary

13th June 2014

0.976 YES 108.4 YES North East Boundary

13th June 2014

No trigger YES No trigger YES 683 Marulan South Road

13th June 2014

No trigger YES No trigger YES Pace Residence

13th June 2014

No trigger YES No trigger YES

slide-16
SLIDE 16

16

Agenda item 6 – Environmental Performance Blast monitoring

Loc

  • cat

ation ion Blas ast Date Grou

  • und

nd Vibrat bration ion Result ult GV GV Complia plia nt nt Over erpr pres essure ure Result ult OP OP Complian plian t North West Boundary 2nd July 2014 0.582 YES 102.8 YES North East Boundary 2nd July 2014 0.568 YES 102.8 YES 683 Marulan South Road 2nd July 2014 No trigger YES No trigger YES Pace Residence 2nd July 2014 No trigger YES No trigger YES North West Boundary 4thJuly 2014 YES YES North East Boundary 4thJuly 2014 YES YES 683 Marulan South Road 4thJuly 2014 YES YES Pace Residence 4thJuly 2014 YES YES

slide-17
SLIDE 17

17

Agenda item 6 – Environmental Performance Heritage

  • Revised Aboriginal Heritage Management Plan has been approved by OEH and

Department of Planning

  • Salvage works being undertaken on the new pit area. Over 2000 artefacts salvaged

and a number of high density sites identified along the creek line

slide-18
SLIDE 18

18

Agenda item 6 – Environmental Performance Ecology

  • Tree planting has been completed as per conditions of consent with over 120 000

plants in the ground.

  • 70 turtles and 2 bream relocated from dam during stripping operations
slide-19
SLIDE 19

19

Agenda item 6 – Stakeholder Engagement

  • Participated in the Tallong Apple

Festival

  • Participation in HASP project
  • Participated in Council's Economic

Development committee’s extractive Industries Breakfast and Expo

  • Provided high vis vests for Councils

learn to cycle program for children and adults with disabilities

  • Pink Grader raffle
  • Partner with Council in upgrade of

Marulan South Road

  • Participated in the PCYC fundraiser with

the goaling of the Mayor

  • Partners with Outward Bound
slide-20
SLIDE 20

20

Agenda item 7 – Plans for the next three months

  • Ongoing quality Production
  • Heritage works to continue
  • Movement of overburden and development of pit heading east
  • Kite festival
slide-21
SLIDE 21

21

Agenda item 8 – General Business

  • weather station queries
slide-22
SLIDE 22

22

END