Colc he ste r / Rive r side / Ba r r e tt/ Mill Inte r se c - - PowerPoint PPT Presentation
Colc he ste r / Rive r side / Ba r r e tt/ Mill Inte r se c - - PowerPoint PPT Presentation
Colc he ste r / Rive r side / Ba r r e tt/ Mill Inte r se c tion Study PAC Me e ting #3 Se pte mbe r 22, 2016 T onig hts Ag e nda Re vie w Pro je c t Purpo se a nd Ne e d De sc rib e sho rt te rm a nd lo ng impro ve me
T
- nig ht’s Ag e nda
- Re vie w Pro je c t Purpo se a nd Ne e d
- De sc rib e sho rt te rm a nd lo ng
impro ve me nts a nd c ha ng e s sinc e pub lic wo rksho p
- Re vie w c o mpa riso n o f a lte rna tive s
- Disc uss q ue stio ns a nd ne xt ste ps
Study T a sks a nd T ime line
- T
a sk 1: Da ta g a the ring ,e xisting c o nditio ns a na lysis;
Ja nua ry- F e brua ry
- T
a sk 2: L
- c a l c o nc e rns pub lic wo rksho p; Ma rc h
- T
a sk 3: Alte rna tive s de ve lo pme nt, PAC me e ting , pub lic wo rksho p; Ma rc h – June
- T
a sk 4: Alte rna tive e va lua tio n, dra ft sc o ping re po rt, PAC me e ting ; July- Se pte mbe r
- T
a sk 5: Alte rna tive pre se nta tio n, fina l re po rt;
Oc tobe r - De c e mbe r
Proje c t Purpose a nd Ne e d
Purpose : T
he purpo se o f the Co lc he ste r/ Rive rside Ave pro je c t is to c re a te a sa fe r a nd mo re e ffic ie ntly
- pe ra ting inte rse c tio n tha t e nha nc e s the sa fe ty,
mo b ility, a nd a c c e ss fo r a ll use rs, while c o ntrib uting to a liva b le a nd vib ra nt c o mmunity.
Proje c t Ne e ds:
- 1. I
mpro ve sa fe ty a nd mo b ility fo r a ll use rs
–
Addre ss pe de stria n sa fe ty
–
Addre ss sa fe r b ic yc le c o nne c tio n, Wino o ski to Burling to n
–
Addre ss hig h c ra sh ra te a t inte rse c tio n
- 2. Simplify the inte rse c tio n – re duc e c o mple xity
- 3. Re duc e tra ffic c o ng e stio n – ma na g e le ng thy
q ue ue s.
Short T e rm Improve me nts
Public c omme nts
–
I mpro ve pe de stria n/ b ike c o nne c tio n to Mill St.
–
Co nc e rn with so uthb o und le ft turns.
–
Add la ne to Co lc he ste r Ave nue NB
–
Dive rt tra ffic fro m Mill Stre e t to Ba rre tt Stre e t
–
De line a te pa rking b e twe e n Ba rre tt a nd Mill St
Short T e rm Improve me nts
Inte rse c tion Pe rforma nc e
Existing (2015) Future (2035) No Build Future with Short Term Improvements Peak Hour V/C1 Delay2 LOS3 V/C Delay LOS V/C Delay LOS AM 0.69 21.9 C 0.74 24.4 C 0.83 27.6 C PM 0.98 50.8 D 1.05 64.2 E 1.10 68.9 E
L
- ng T
e rm Alte rna tive s
- 4-Wa y I
nte rse c tio n
- 4-Wa y I
nte rse c tio n with Se pa ra te Rig ht L a ne
- Ro unda b o ut
4- Wa y Inte rse c tion
–
Re c o nfig ure s to o ne sig na l
–
Pe de stria n sig na ls
–
Co lc he ste r Ave - 2 la ne a ppro a c h w/ b ike la ne s
–
Bic yc le c o nne c tio ns
–
3 la ne b ridg e with sha re d use pa th
–
Adva nc e d sig ns
–
Ne w ma rking s
–
De line a te pa rking
–
Re lo c a te b us sto p
–
Pro te c te d c ro ssing pha se
4- Wa y Inte rse c tion w/ Rig ht L a ne
–
Sa me impro ve me nts a s 4 wa y
–
Pe de stria n sig na ls a t 4 wa y
–
Rig ht la ne g e o me try pro mo te s yie ld to pe de stria ns a nd impro ve s tra ffic c a pa c ity.
Rounda bout
–
K no wn fo r e ffic ie nc y, tra ffic c a lming , sa fe ty, a nd g a te wa y
–
2 la ne ro unda b o ut
–
Pro vide s fo r 3 la ne b ridg e
–
Ha s 5 to 7% slo pe
–
Re q uire s re ta ining wa lls
–
I mpa c ts pro pe rty
–
Ac c o mmo da te s SB le ft turn
- nto Mill St.
Inte rse c tion Pe rforma nc e
Alternative AM Peak Hour PM Peak Hour V/C1 Delay2 LOS3 V/C1 Delay2 LOS3 Existing (2015) No Build 0.69 21.9 C 0.98 50.8 D Future (2035) No Build 0.74 24.4 C 1.05 64.2 E Future with Alternative 1 Improvements 0.83 28.7 C 1.00 70.5 E Future with Alternative 2 Improvements 0.75 24.0 C 0.99 70.9 E Future with Alternative 3 Improvements 0.36 - 0.88 2.5 - 20 A - C 0.67 - 1.09 16 - 47 C - E
Sa fe ty Ana lysis
- 1. Cr
a she s = Cra sh Ra te X Vo lume
- 2. Annua l Cost of Cr
a she s = Cra she s
X Co st pe r Cra sh
- 3. Ne t Pr
e se nt Va lue a ssume s 20-
ye a r life a nd thre e pe rc e nt inte re st
Sa fe ty Compa rison
Location/Performance Measure Baseline (Existing Conditions) Alternative 1 (Four-way, Signalized Intersection) Alternative 2 (Four-way with Bypass) Alternative 3 (Modern Roundabout)
Combined (three locations) Present Value of Crashes $12,717,000 $7,139,000 $5,480,000 $3,373,000 Savings Relative to Existing
- $5,578,000
$7,237,000 $9,344,000
E va lua tion Ma trix
CRITERIA No Build Short Term Improvements Alternative 1 4 -Way Intersection Alternative 2 4-Way intersection w/separate lane Alternative 3 Roundabout Project Costs $0 $150,000 to $825,000 $3,300,000 $3,430,000 $6, 700,000
PURPOSE AND NEED
Improves Pedestrian Safety No Some Better Better Best Provides Safer Bicycle Connectivity Winooski to Burlington No No Yes – 3 lane bridge Yes – 3 lane bridge Yes – 3 lane bridge Reduces Potential for Crashes Estimated Safety Savings No $0 Some N/A Better $5,578,000 Better $7,237,000 Best $9,344,000 Reduces Intersection Complexity No No Yes Yes Yes Manages Peak Hour Congestion No No No No Yes
IMPACTS
ROW Impacts None None 1600 sf 1600 sf 4000 sf/ 1 house Historic Resources None None None None Removes 4(f) resource
Short T e rm Improve me nts
Public c omme nts
–
I mpro ve c o nne c tio n to Mill Stre e t.
–
Co nc e rn with so uthb o und le ft turns.
–
Add la ne to Co lc he ste r Ave nue NB
–
Dive rt tra ffic fro m Mill Stre e t to Ba rre tt Stre e t
–
De line a te pa rking b e twe e n Ba rre tt a nd Mill St
–
De line a te ro a d la ne s thro ug h the inte rse c tio n
4- Wa y Inte rse c tion
–
E va lua te c o nc e rns with “Rig ht o nly” o ut o f Mill St.
–
Pro hib it le fts fro m Mill stre e t in pe a k ho urs? (7-9a / 4-6p)
–
I mpro ve Mill St. a c c e ss fo r b ike s/ pe de stria ns
–
Co nc e rne d with le fts o nto Mill St b lo c king thru tra ffic
–
E va lua te re ta ining 1 la ne o n Co lc he ste r Ave nue NB
–
Pro vide pro te c te d b ike la ne s to ma tc h the BT V Bike / wa lk
–
E va lua te re stric ting le ft fro m Co lc he ste r to Rive rside Ave
4- Wa y Inte rse c tion w/ Rig ht L a ne
–
I nsta ll tra ffic sig na l fo r c ro sswa lk o n rig ht turn la ne
–
Add a no rth side c ro sswa lk a t Co lc he ste r a nd Ba rre tt
–
Re mo ve Co lc he ste r Ave pa rking , b e twe e n Ba rre tt a nd Mill fo r wide r side wa lk.
–
Pro vide a pro te c te d pha se o r a ll sto p fo r pe de stria ns vs a le a ding inte rva l pha se fo r pe de stria ns
Rounda bout
–
Bike / Pe d a c c e ss to Mill stre e t sho uld b e impro ve d
–
Pro vide wide r a nd ra ise d c ro sswa lks
–
E limina te pa rking b e twe e n Mill a nd Ba rre tt Stre e ts fo r b ike / pe de stria ns
–
Cre a te wide r side wa lk o n Rive rside to Co lc he ste r
–
Pro vide c urb isla nds
–
Add side wa lk o n Mill Stre e t
–
E xpla in the sa fe ty diffe re nc e b e twe e n 1 a nd 2 la ne ro unda b o uts
–
Co nc e rne d c a nno t ma ke a le ft fro m Ba rre tt to Rive rside
4- Wa y Inte rse c tion
Inte rse c tion Pe rforma nc e
Existing (2015) No Build Future (2035) No Build Future with Alternative 1 Improvements Peak Hour V/C1 Delay2 LOS3 V/C Delay LOS V/C Delay LOS AM 0.69 21.9 C 0.74 24.4 C 0.83 28.7 C PM 0.98 50.8 D 1.05 64.2 E 1.00 70.5 E
4- Wa y Inte rse c tion with Se pa ra te Rig ht L a ne
Inte rse c tion Pe rforma nc e
Existing (2015) Future (2035) No Build Future with Alternative 2 Improvements Peak Hour V/C1 Delay2 LOS3 V/C Delay LOS V/C Delay LOS AM 0.69 21.9 C 0.74 24.4 C 0.75 24.0 C PM 0.98 50.8 D 1.05 64.2 E 0.99 70.9 E