colc he ste r rive r side ba r r e tt mill inte r se c
play

Colc he ste r / Rive r side / Ba r r e tt/ Mill Inte r se c - PowerPoint PPT Presentation

Colc he ste r / Rive r side / Ba r r e tt/ Mill Inte r se c tion Study PAC Me e ting #3 Se pte mbe r 22, 2016 T onig hts Ag e nda Re vie w Pro je c t Purpo se a nd Ne e d De sc rib e sho rt te rm a nd lo ng impro ve me


  1. Colc he ste r / Rive r side / Ba r r e tt/ Mill Inte r se c tion Study PAC Me e ting #3 Se pte mbe r 22, 2016

  2. T onig ht’s Ag e nda • Re vie w Pro je c t Purpo se a nd Ne e d • De sc rib e sho rt te rm a nd lo ng impro ve me nts a nd c ha ng e s sinc e pub lic wo rksho p • Re vie w c o mpa riso n o f a lte rna tive s • Disc uss q ue stio ns a nd ne xt ste ps

  3. Study T a sks a nd T ime line • T a sk 1: Da ta g a the ring ,e xisting c o nditio ns a na lysis; Ja nua ry- F e brua ry • T a sk 2: L o c a l c o nc e rns pub lic wo rksho p; Ma rc h • T a sk 3: Alte rna tive s de ve lo pme nt, PAC me e ting , pub lic wo rksho p; Ma rc h – June • T a sk 4: Alte rna tive e va lua tio n, dra ft sc o ping re po rt, PAC me e ting ; July- Se pte mbe r • T a sk 5: Alte rna tive pre se nta tio n, fina l re po rt; Oc tobe r - De c e mbe r

  4. Proje c t Purpose a nd Ne e d Purpose : T he purpo se o f the Co lc he ste r/ Rive rside Ave pro je c t is to c re a te a sa fe r a nd mo re e ffic ie ntly o pe ra ting inte rse c tio n tha t e nha nc e s the sa fe ty, mo b ility, a nd a c c e ss fo r a ll use rs, while c o ntrib uting to a liva b le a nd vib ra nt c o mmunity. Proje c t Ne e ds: 1. I mpro ve sa fe ty a nd mo b ility fo r a ll use rs – Addre ss pe de stria n sa fe ty – Addre ss sa fe r b ic yc le c o nne c tio n, Wino o ski to Burling to n – Addre ss hig h c ra sh ra te a t inte rse c tio n 2. Simplify the inte rse c tio n – re duc e c o mple xity 3. Re duc e tra ffic c o ng e stio n – ma na g e le ng thy q ue ue s.

  5. Short T e rm Improve me nts Public c omme nts – I mpro ve pe de stria n/ b ike c o nne c tio n to Mill St. – Co nc e rn with so uthb o und le ft turns. – Add la ne to Co lc he ste r Ave nue NB – Dive rt tra ffic fro m Mill Stre e t to Ba rre tt Stre e t – De line a te pa rking b e twe e n Ba rre tt a nd Mill St

  6. Short T e rm Improve me nts Inte rse c tion Pe rforma nc e Future (2035) Future with Short Existing (2015) No Build Term Improvements Peak V/C 1 Delay 2 LOS 3 Hour V/C Delay LOS V/C Delay LOS AM 0.69 21.9 C 0.74 24.4 C 0.83 27.6 C PM 0.98 50.8 D 1.05 64.2 E 1.10 68.9 E

  7. L ong T e rm Alte rna tive s • 4-Wa y I nte rse c tio n • 4-Wa y I nte rse c tio n with Se pa ra te Rig ht L a ne • Ro unda b o ut

  8. 4- Wa y Inte rse c tion – Re c o nfig ure s to o ne sig na l – Pe de stria n sig na ls – Co lc he ste r Ave - 2 la ne a ppro a c h w/ b ike la ne s – Bic yc le c o nne c tio ns – 3 la ne b ridg e with sha re d use pa th – Adva nc e d sig ns – Ne w ma rking s – De line a te pa rking – Re lo c a te b us sto p – Pro te c te d c ro ssing pha se

  9. 4- Wa y Inte rse c tion w/ Rig ht L a ne – Sa me impro ve me nts a s 4 wa y – Pe de stria n sig na ls a t 4 wa y – Rig ht la ne g e o me try pro mo te s yie ld to pe de stria ns a nd impro ve s tra ffic c a pa c ity.

  10. Rounda bout – K no wn fo r e ffic ie nc y, tra ffic c a lming , sa fe ty, a nd g a te wa y – 2 la ne ro unda b o ut – Pro vide s fo r 3 la ne b ridg e – Ha s 5 to 7% slo pe – Re q uire s re ta ining wa lls – I mpa c ts pro pe rty – Ac c o mmo da te s SB le ft turn o nto Mill St.

  11. Inte rse c tion Pe rforma nc e AM Peak Hour PM Peak Hour Alternative V/C 1 Delay 2 LOS 3 V/C 1 Delay 2 LOS 3 Existing (2015) No Build 0.69 21.9 C 0.98 50.8 D Future (2035) No Build 0.74 24.4 C 1.05 64.2 E Future with Alternative 1 0.83 28.7 C 1.00 70.5 E Improvements Future with Alternative 2 0.75 24.0 C 0.99 70.9 E Improvements Future with Alternative 3 0.36 - 0.67 - 2.5 - 20 A - C 16 - 47 C - E Improvements 0.88 1.09

  12. Sa fe ty Ana lysis a she s = Cra sh Ra te X Vo lume 1. Cr a she s = Cra she s 2. Annua l Cost of Cr X Co st pe r Cra sh e se nt Va lue a ssume s 20- 3. Ne t Pr ye a r life a nd thre e pe rc e nt inte re st

  13. Sa fe ty Compa rison Location/Performance Alternative 1 Alternative 2 Measure (Four-way, (Four-way with Baseline Alternative 3 Signalized Bypass) (Existing Intersection) (Modern Conditions) Roundabout) Combined (three locations) Present Value of $12,717,000 $7,139,000 $5,480,000 $3,373,000 Crashes Savings Relative to - $5,578,000 $7,237,000 $9,344,000 Existing

  14. E va lua tion Ma trix Short Term Alternative 1 Alternative 2 Alternative 3 Improvements 4 -Way 4-Way Roundabout CRITERIA No Build Intersection intersection w/separate lane Project Costs $0 $150,000 to $3,300,000 $3,430,000 $6, 700,000 $825,000 PURPOSE AND NEED Improves Pedestrian Safety No Some Better Better Best Provides Safer Bicycle No No Yes – 3 lane Yes – 3 lane Yes – 3 lane Connectivity Winooski to bridge bridge bridge Burlington Reduces Potential for Crashes No Some Better Better Best Estimated Safety Savings $0 N/A $5,578,000 $7,237,000 $9,344,000 Reduces Intersection No No Yes Yes Yes Complexity Manages Peak Hour No No No No Yes Congestion IMPACTS ROW Impacts None None 1600 sf 1600 sf 4000 sf/ 1 house Historic Resources None None None None Removes 4(f) resource

  15. Short T e rm Improve me nts Public c omme nts – I mpro ve c o nne c tio n to Mill Stre e t. – Co nc e rn with so uthb o und le ft turns. – Add la ne to Co lc he ste r Ave nue NB – Dive rt tra ffic fro m Mill Stre e t to Ba rre tt Stre e t – De line a te pa rking b e twe e n Ba rre tt a nd Mill St – De line a te ro a d la ne s thro ug h the inte rse c tio n

  16. 4- Wa y Inte rse c tion – E va lua te c o nc e rns with “Rig ht o nly” o ut o f Mill St. – Pro hib it le fts fro m Mill stre e t in pe a k ho urs? (7-9a / 4-6p) – I mpro ve Mill St. a c c e ss fo r b ike s/ pe de stria ns – Co nc e rne d with le fts o nto Mill St b lo c king thru tra ffic – E va lua te re ta ining 1 la ne o n Co lc he ste r Ave nue NB – Pro vide pro te c te d b ike la ne s to ma tc h the BT V Bike / wa lk – E va lua te re stric ting le ft fro m Co lc he ste r to Rive rside Ave

  17. 4- Wa y Inte rse c tion w/ Rig ht L a ne – I nsta ll tra ffic sig na l fo r c ro sswa lk o n rig ht turn la ne – Add a no rth side c ro sswa lk a t Co lc he ste r a nd Ba rre tt – Re mo ve Co lc he ste r Ave pa rking , b e twe e n Ba rre tt a nd Mill fo r wide r side wa lk. – Pro vide a pro te c te d pha se o r a ll sto p fo r pe de stria ns vs a le a ding inte rva l pha se fo r pe de stria ns

  18. Rounda bout – Bike / Pe d a c c e ss to Mill stre e t sho uld b e impro ve d – Pro vide wide r a nd ra ise d c ro sswa lks – E limina te pa rking b e twe e n Mill a nd Ba rre tt Stre e ts fo r b ike / pe de stria ns – Cre a te wide r side wa lk o n Rive rside to Co lc he ste r – Pro vide c urb isla nds – Add side wa lk o n Mill Stre e t – E xpla in the sa fe ty diffe re nc e b e twe e n 1 a nd 2 la ne ro unda b o uts – Co nc e rne d c a nno t ma ke a le ft fro m Ba rre tt to Rive rside

  19. 4- Wa y Inte rse c tion Inte rse c tion Pe rforma nc e Future (2035) Future with Existing (2015) No Build Alternative 1 No Build Improvements Peak V/C 1 Delay 2 LOS 3 Hour V/C Delay LOS V/C Delay LOS AM 0.69 21.9 C 0.74 24.4 C 0.83 28.7 C PM 0.98 50.8 D 1.05 64.2 E 1.00 70.5 E

  20. 4- Wa y Inte rse c tion with Se pa ra te Rig ht L a ne Inte rse c tion Pe rforma nc e Future (2035) Future with No Build Alternative 2 Existing (2015) Improvements Peak V/C 1 Delay 2 LOS 3 Hour V/C Delay LOS V/C Delay LOS AM 0.69 21.9 C 0.74 24.4 C 0.75 24.0 C PM 0.98 50.8 D 1.05 64.2 E 0.99 70.9 E

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend