COEGA PRESENTATION CCGT EOI SESSION 14 DECEMBER 2009 CONTENT Coega General Overview The Project Overview Technical Conceptual Study Commercial Aspects Other Considerations CDC Procurement Policy Questions COEGA


slide-1
SLIDE 1

COEGA PRESENTATION CCGT EOI SESSION 14 DECEMBER 2009

slide-2
SLIDE 2

CONTENT

  • Coega General Overview
  • The Project

– Overview – Technical Conceptual Study – Commercial Aspects

  • Other Considerations
  • CDC Procurement Policy
  • Questions
slide-3
SLIDE 3

COEGA GENERAL OVERVIEW

slide-4
SLIDE 4

ORGANISATIONAL MANDATE

  • Attraction of Investment (Local & Foreign)
  • Enable Technology Transfer
  • Human Capital Development
  • Creation of Decent Work
  • Economic Development
  • Facilitate Enabling Infrastructure Investments
  • Assist Government on Project Delivery
slide-5
SLIDE 5

COEGA BUSINESS MODEL

ECONOMIC ZONE (+NMBSP) EXTERNAL SERVICES COEGA DEVELOPMENT CORPORATION

Investment Promotion Operations Consultancy Services

Facilities Infrastructure Support Services Customs + Logistics Finance Global Markets Project Development

Investor Services (OSISC)

Systems ICT Marketing Research Negotiations

Infrastructure Development Human Capital

Audit Human Resources, Legal, Office Management, Travel Portfolio Development Training and Development Employee Relations Recruitment and Placement SHE Infrastructure Development SMME Development Infrastructure Planning

ECONOMIC ZONE (+NMBSP) EXTERNAL SERVICES COEGA DEVELOPMENT CORPORATION

Investment Promotion Operations Consultancy Services

Facilities Infrastructure Support Services Customs + Logistics Finance Global Markets Project Development

Investor Services (OSISC)

Systems ICT Marketing Research Negotiations

Infrastructure Development Human Capital

Audit Human Resources, Legal, Office Management, Travel Portfolio Development Training and Development Employee Relations Recruitment and Placement SHE Infrastructure Development SMME Development Infrastructure Planning Management

slide-6
SLIDE 6
  • Framework Plan: Phased Development
slide-7
SLIDE 7

CHANNELS OF INTERVENTION

  • Industrial Development Zone (IDZ)
  • Nelson Mandela Bay Logistics Park (NMBLP)
  • Physical Infrastructure Programme Management
  • Strategic Advisory
  • Human Capital Development (HCS)
  • Economic Research
slide-8
SLIDE 8

WIDER ECONOMIC RELEVANCE

slide-9
SLIDE 9

POLICY RELEVANCE OF COEGA

  • Facilitate the creation of an industrial complex with clear

economic advantages;

  • Provide the location for the establishment of strategic

investments;

  • Take advantage of existing capacity that promotes

integration with local industry

  • Increase value-added production; and
  • Create employment and other economic and social

benefits in the region in which it is located

slide-10
SLIDE 10

SIGNED INVESTORS

SECTOR VALUE DIRECT EMPLOYMENT INDIRECT EMPLOYMENT Chemicals R6 billion 800 1800 Logistics R85 million 417 21178 Auto components R694 million 616 1682 Alternative energy R1.5 billion 50 350 BPO R31 million 120 48 Downstream metals (Iron and Steel) R75 million 120 100 Food & Beverage Industries R4 billion 5015 9450 Manufacturing R50 million 50 40 Total R12.4 billion 7188 34648

slide-11
SLIDE 11

CDC & THE CCGT PROJECT

  • CDC facilitated in terms of attracting investment and

enabling IPP

  • Consistent to policy of Government
  • Worked with Departments of Mineral & Energy and now

Department of Energy

  • Takes cognisance of changes in the energy sector

institutions and roles

slide-12
SLIDE 12

THE PROJECT

slide-13
SLIDE 13

PROJECT OVERVIEW

  • Background

– Project was started by major entities – Independent power production was a challenge and the entities withdrew from the process – Project is relevant and has been accepted at National Gov. level – CDC was involved early 2008 to do groundwork for an IPP

  • Motivation

– Development of IDZ taking the future needs into account – There is a need for a baseload power station in the EC – Government imperative of opening the IPP market – The project is in line with the Integrated Resource Plan – Reduce SA’s carbon footprint – Efficient technology – Diversification of SA’s fuel sources

slide-14
SLIDE 14

PROJECT OVERVIEW (2)

  • Concept

– Up to 3200MWe envisaged – Baseload Power Station – LNG as the preferred fuel source

  • Why Coega

– Transmission lines and substation availability – Port of Ngqura with potential infrastructure and logistical facilities – Large Industrial users in the IDZ – Seawater cooling availability – Grid stability with EC baseload – Local power security – Availability of land

slide-15
SLIDE 15

SITE LOCATION

Floating Solution

Cryogenic pipelines

slide-16
SLIDE 16
  • Pre-Feasibility Report

– The Project – Project Owner – Value Proposition & Alignment of Objectives – Economic Analysis – Electricity Sector Analysis – Natural Gas Sector Analysis – Regulatory and Legal Framework – Commercial Structures – Target Strategic Partners – Technical Study – Financing Options – Project Financial Viability – Risk Mitigation

  • Class II Cost Estimate (ROM 40%)

TECHNICAL CONCEPTUAL STUDY

16

slide-17
SLIDE 17

TYPICAL POWER PLANT INTERFACES

17

slide-18
SLIDE 18

TYPICAL DESIGN BASIS

  • Site location is fixed (bordered by Zone 8 & 10)
  • 3200 MWe Combined Cycle Power Plant (4 x 800 MWe)
  • Fuel is Natural Gas (regasified on site from imported LNG)
  • Some municipal effluent (water) available for re-use

18

Power Plant Site

slide-19
SLIDE 19

CONCEPTUAL PLANT LAYOUT

19

slide-20
SLIDE 20

FUEL SUPPLY

  • 3200 MWe
  • ~4 million tons LNG per year

(8.6 million m3 per year)

  • Requires a ship every 5

days (135,000 m3 capacity)

  • Onshore regasification

20

slide-21
SLIDE 21

COOLING WATER SYSTEM

  • Significant condenser cooling

requirements (approx 1 million m3 per 800MW per day)

  • Cooling Options

– Open Cycle (once through cooling) – Closed Cycle (wet cooling towers, dry cooling)

  • Solution will be influenced by

– Marine regulations (sea water intake, sea water temperature rise) – Site conditions (elevation, water availability, water and ambient temperatures)

  • EIA and detailed study needed to

determine optimal cooling solution

21

slide-22
SLIDE 22

COMMERCIAL ASPECTS

  • Conceptual Project’s Commercial Structure

Government Authorities O&M Contractor EPC Contractors

BOT Law/Concession Agreement/Licences/ Permits/Other Approvals Equity/Joint Venture Agreement Financing/Security Documentation/Equity Bridge Loan EPC Contract(s) O&M Agreement

Project Company Project Sponsors

(Consortium Agreement)

Project Lenders Offtaker

Power Purchase Agreement (“PPA”)

Land Owner

Land Purchase/ Lease/Land Use Rights

Bank Performance Bond (O+M) Bank Performance Bond (EPC)

Fuel Supply/Transportation Agreements Note: There will also be direct agreements between the Project Lenders and various project parties.

Sub Contractor Sub Contractor Fuel Supplier/ Fuel Transporter Water Supplier Government Authorities O&M Contractor EPC Contractors

BOT Law/Concession Agreement/Licences/ Permits/Other Approvals Equity/Joint Venture Agreement Financing/Security Documentation/Equity Bridge Loan EPC Contract(s) O&M Agreement

Project Company Project Sponsors

(Consortium Agreement)

Project Lenders Offtaker

Power Purchase Agreement (“PPA”)

Land Owner

Land Purchase/ Lease/Land Use Rights

Bank Performance Bond (O+M) Bank Performance Bond (EPC)

Fuel Supply/Transportation Agreements Note: There will also be direct agreements between the Project Lenders and various project parties.

Sub Contractor Sub Contractor Fuel Supplier/ Fuel Transporter Water Supplier

slide-23
SLIDE 23

COMMERCIAL ASPECTS (2)

  • Development Phase

– CDC is looking for a potential IPP’s from an early stage – CDC will continue to act as a facilitator until PPA signed

  • Construction Phase & Operational Phase

– CDC may look at different forms of compensation in terms of its landlord and facilitation role – Capital structure is still to be determined – Government through its entities may consider participating in the shareholding of the company – Further details will be highlighted in the RFP and finalised during the negotiations

slide-24
SLIDE 24

OTHER CONSIDERATIONS

slide-25
SLIDE 25

OTHER CONSIDERATIONS

  • Regulatory environment

– Recent Government Announcement confirm proposed changes in Institutional Arrangements and the Role of Eskom – Detail to be clarified in 2010 – Imminent establishment of Independent Systems Operator – Buying of Power – Environmental licensing requirements – Other licensing requirements

  • The role of the CDC in the project

– To continue with the EIA – To apply for licences – To facilitate the PPA – May facilitate for gas sourcing (if necessary)

slide-26
SLIDE 26

STAKEHOLDERS ROLES

  • Stakeholders and their roles

– Various entities that are stakeholders – Assist with the Regulatory environment – Ensure that the necessary support is received – To continue with the relevant work to bring the project to fruition

slide-27
SLIDE 27

CDC PROCUREMENT POLICY

slide-28
SLIDE 28

BACKGROUND

  • COEGA is implementing BB-BEE as per DTI requirements

(RFP Stage)

  • Multinational and national Contractors, Service Providers

and Consultants – compliant with BB-BEE (RFP Stage)

  • Encourage participation of SMME and Local (EC)

companies

  • COEGA Procurement Policy and Procedures (website)
slide-29
SLIDE 29

Element Weighting Primary Codes Reference Ownership 20 Points Code 100 Management Control 10 Points Code 200 Employment Equity 15 Points Code 300 Skills Development 15 Points Code 400 Preferential Procurement 20 Points Code 500 Enterprise Development 15 Points Code 600 Corporate Social Investment 5 Points Code 700

THE GENERIC SCORECARD

slide-30
SLIDE 30

SOCIO-ECONOMIC IMPERATIVES

  • TWO IMPORTANT REQUIREMENTS
  • SMME Participation

– SMME participation is vital – SMME Development Programme and Mentorship

  • LOCAL (EC) Participation

– Participation of Local companies in each Project – Source Local Companies

slide-31
SLIDE 31

EVALUATION OF EOI

  • Bids must be submitted in sealed envelope, 1 original & 2

copies

  • To be deposited into CDC Tender Box,
  • Bids received by Telegram, fax or email will not be

considered

  • Prequalification will be based on Item 6.4 pg 16/22
slide-32
SLIDE 32

EVALUATION OF RFP

  • This will be done in two stages after further consultations

with the National Government Departments

  • STAGE 1 - Request for Proposals

– Pre qualified companies will be issued RFP documents – RFP documents will be expected to demonstrate Price, Technical Expertise / Capacity and Empowerment (BB-BEE)

  • STAGE 2 - Approval Process

– Preferred Company (ies) will be advised – Unsuccessful companies will be advised

slide-33
SLIDE 33

EOI TIMELINE

ACTION START DATE COMPLETION DATE 1st Publication & Advertisement 30 November 2009 01 February 2010 Release of Expression of Interest Document 30 November 2009 22 January 2010 Non Disclosure Agreement 30 November 2009 22 January 2010 Non Compulsory Presentation 14 December 2009 14 December 2009 Period for EOI Clarification 07 December 2009 29 January 2010 EOI Closing Date 01 February 2010 @12h00

slide-34
SLIDE 34

CONCLUSIONS

  • Closing Date &Time – Monday 01 February 2010 @ 12h00
  • EOI must be submitted – COEGA Tender Box
  • Communication will only be in writing between specified

dates

  • All communication - tenders.ccgt@coega.co.za
  • LATE submissions will not be accepted
  • COEGA Web Site www.coega.com
slide-35
SLIDE 35

QUESTIONS