coburg crescent
play

COBURG CRESCENT NEW RESOURCE CENTRE 26.01.2017 - STAKEHOLDER - PowerPoint PPT Presentation

COBURG CRESCENT NEW RESOURCE CENTRE 26.01.2017 - STAKEHOLDER ENGAGEMENT AERIAL VIEW CHRISTCHURCH ROAD PALACE ROAD NATURE GARDEN PALACE ROAD SITE PHOTOS view from Palace Road - approach from Tulse Hill view from the estate gardens to the


  1. COBURG CRESCENT NEW RESOURCE CENTRE 26.01.2017 - STAKEHOLDER ENGAGEMENT

  2. AERIAL VIEW CHRISTCHURCH ROAD PALACE ROAD NATURE GARDEN PALACE ROAD

  3. SITE PHOTOS view from Palace Road - approach from Tulse Hill view from the estate gardens to the Coburg Crescent site

  4. PREVIOUS ENGAGEMENT EVENTS 14.01.16 - 1ST ENGAGEMENT EVENT - PRESENTATION 09.02.16 - 2ND ENGAGEMENT EVENT - CARDS AND ROUND TABLE DISCUSSIONS 14.03.16 - 3RD ENGAGEMENT EVENT - PHISICAL MODELS AND COMMENTS ON THE SCHEME 19.04.16 - RESIDENTS ASSOCIATION PRESENTATION 25.04.16 - LAMBETH LEARNING DISABILITIES ASSEMBLY

  5. 2ND ENGAGEMENT EVENT 09.02.16 BOLNEY MEADOW COMMUNITY CENTRE 31 BOLNEY ST, LONDON SW8 1EZ WORK-STREAMS: RESOURCE CENTRE DAY ACCOMMODATION SERVICES EMPLOYMENT COMMUNITY

  6. 2ND ENGAGEMENT EVENT 09.02.16 BOLNEY MEADOW COMMUNITY CENTRE 31 BOLNEY ST, LONDON SW8 1EZ CARDS: ACCOMMODATION DAY CENTRE 1 1 LOW LOW S H O R T T E R M S O C I A L H U B : D A Y R O O M 2 2 Q: IS IT EASIER TO HAVE ENSUITE ROOMS OR ALL THE WC FACILITIES TOGETHER? Q: DO WE NEED A CEILING HOIST THROUGHOUT THE ENTIRE DAY SPACE? 3 3 A: THE FIVE MOST IMPORTANT IDEAS ARE... A: THE FIVE MOST IMPORTANT IDEAS ARE... 4 4 HIGH HIGH 5 5 FIRST PUBLIC WORKSHOP - 09.02.16 FIRST PUBLIC WORKSHOP - 09.02.16 COMMUNITY EMPLOYMENT 1 1 LOW LOW C A F E 2 2 Q: WOULD YOU THINK A CAFÉ IS AN APPROPRIATE MEETING POINT? Q: HOW DO YOU THINK WE CAN ATTRACT PEOPLE 3 WITH DISABILITIES TO WORK HERE? 3 A: THE FIVE MOST IMPORTANT IDEAS ARE... A: THE FIVE MOST IMPORTANT IDEAS ARE... 4 4 HIGH HIGH 5 5 FIRST PUBLIC WORKSHOP - 09.02.16 FIRST PUBLIC WORKSHOP - 09.02.16

  7. 2ND ENGAGEMENT EVENT 09.02.16 BOLNEY MEADOW COMMUNITY CENTRE 31 BOLNEY ST, LONDON SW8 1EZ DAY SERVICES ACCOMMODATION EMPLOYMENT COMMUNITY • NOT INSTITUTIONAL • LONG TERM AND SHORT • GOOD WHEELCHAIR • THE CAFE WILL BE THE • INTUITIVE TERM ACCESS TO THE GARDEN FOCAL POINT OF THE • OPEN PLAN DINING • EVERYONE SHOULD HAVE • SIGNAGE NEEDS TO BE BUILDING ROOM/ ACTIVITIES ROOM THEIR OWN FACILITIES EASY TO UNDERSTAND • HOT-DESKING • STORAGE FOR • HOTEL TYPE MODE • COLOUR-CODED ROOMS • COMMUNITY SPACE EQUIPMENT AND ART • COMMUNAL KITCHENETTE • POTENCIAL • CHANGING PLACE • AVOID HAVING SHARP • HOIST ON EACH ROOM OPPORTUNITIES: ANGLED BITS • STAFF ROOM - CAFÉ • GYM AREA WITH A • OUTDOOR SPACE - CLEANING TRAMPOLINE • CONNECTION WITH DAY - PAPER SHREDDING • THERAPY ROOMS FOR CENTRE - LUNCHTIME SUPPORT DIVERSE USES - HELP WITH LEAFLETS • THE GARDEN AS PART OF - MAKING TEA THE CENTRE - GARDENING • SEPARATED MALE AND FEMALE WC ( 4 TO 6) • COVERED DROP-OFF AREA

  8. 3RD ENGAGEMENT EVENT 14.03.16 BOLNEY MEADOW COMMUNITY CENTRE 31 BOLNEY ST, LONDON SW8 1EZ photo from 3rd public engagement event

  9. 3RD ENGAGEMENT EVENT 14.03.16 BOLNEY MEADOW COMMUNITY CENTRE 31 BOLNEY ST, LONDON SW8 1EZ drawings shown on the 3rd public engagement event photo from 3rd public engagement event

  10. GENERAL STRATEGY LONG TERM FLATS PMLD FLATS CAFE / COMMUNITY SHORT-TERM ROOMS DAY CENTRE

  11. DESIGN PRINCIPLES CORE LOCATION futureproofjng - connection with drop-ofg HIGHER CORNER creating a street - articulation with context LOWER CORNER interaction with the garden ACTIVE FRONTAGE QUIET CORNER Palace Road towards the gardens 01. Massing principles 02. Internal and external flow conditions POTENTIAL DOUBLE ASPECT CONNECTION TO THE PARK COLLECT LANDSCAPE FLOWS corner and limit condition 03. Views 04. Landscaping interaction

  12. LONG TERM ACCOMMODATION - PMLD USERS GROUND FLOOR PLAN DEVELOPMENT: A-20-ELE-304 1 NE Elevation 01 02 03 04 05 06 07 08 CCC L 08 09 09 08 09 09 09 219 220 221 Room Room Room 23 m² 23 m² 22 m² ESTATE GARDENS DROP-OFF THERAPY ROOMS K 05 09 222 Room 23 m² J 11 13 05 11 09 09 223 Room 22 m² PERSONAL I CARE 06 09 06 12 CORE 12 H 01 GYM SE Elevation DAY SPACES 05 07 218 1 A-20-ELE-302 Gym 146 m² 215 G WC 8 m² 180 therapy room 28 m² 07 01 05 F 181 therapy room NW Elevation 35 m² A-20-ELE-303 1 GARDEN E 216 WC 10 5 m² 10 03 217 WC 5 m² D 173 day room 108 m² 02 C 174 02 dining room 114 m² 44 storage 13 m² PLANT B 16 plant 04 94 m² A-20-ELE-303-East East Elevation Elevation 3 - c A - - - - - 01. PRE-APP MEETING - GF PLAN 02. LATEST SCHEME - GF PLAN 03. DIAGRAMATIC UPDATED SCHEME

  13. ACCOMMODATION DIAGRAM - 1ST FLOOR ST ST ST LT ROOM 02 ROOM 03 ROOM 04 PMLD 2 USERS + STAFF ST ROOM 01 COMMUNAL SPACE LT PMLD 2 USERS + STAFF CORE STAFF AREA having access from the COMMUNITY street / drop-ofg area SPACES

  14. SHORT-TERM ACCOMMODATION SKETCH SCHEMATIC ARRANGEMENT Area (GIA): 30 m 2 4no units // 4 users 4M 3M 1M 2.5M WET ROOM 1.5M BEDROOM 5.1M 1M CHARGING SPACE 1.5M PRIVATE OUTDOOR SPACE COMMUNAL SPACE

  15. LONG TERM ACCOMMODATION - PMLD USERS SCHEMATIC ARRANGEMENT Area (GIA): 155 m 2 2no units // 4 users 4M 3M 3.5M 3M 4M 6.5M USER CHANGING STAFF CHANGING USER ROOM ROOM ROOM ROOM ROOM 4M M 5 . 1 6M M HOIST HOIST 5 LIVING . 1 KITCHEN DINING M 5 . 1 M 5 . 2M 1 WC CHARGING SPACE 3M 25.75M Two 3 bed fmats for four PMLD with double handed care. clients, which come with track These service users would attend hoists and wet rooms and Coburg Day Centre and stafg assistive technology. Each fmat from the centre could provide will have their own live in carer additional support at peak times, and be able to access two as they have the skills and will fmoating support workers to help know the clients well.

  16. ACCOMMODATION DIAGRAM - 2ND FLOOR potential connection LT LT LT LT 2 USERS 2 USERS 1 USER 1 USERS LT LT 3 USERS 2 USERS CORE fmoor for more independent users

  17. LONG TERM ACCOMMODATION - MODERATE NEEDS USERS SCHEMATIC ARRANGEMENT Area (GIA): 93 m 2 3no units // 6 users 4M 4M 2.5M 4M WC USER USER 3.5M ROOM ROOM M 5 M . 1 5 . 1 6M LIVING KITCHEN DINING M 5 . 1 M 2.5M WC 5 . 1 CHARGING SPACE 3.5M 6.5M 15.5M Two 2 bed fmats for four signifjcant savings as it would transitions clients with moderate be a sizeable reduction in this support needs. They will live cohort’s current care packages. more independently and access Their lower support needs shared community support reduce the risks associated for 8 hours per day and utilise with stacking a scheme with all assistive technology. It is complex clients. this cohort who provide the

  18. JAN 2016 STAKEHOLDER ENGAGEMENT TIMELINE FEB 2016 STAKEHOLDER ENGAGEMENT MARCH 2016 STAKEHOLDER ENGAGEMENT TODAY JAN 2017 STAKEHOLDER ENGAGEMENT STAKEHOLDER ENGAGEMENT PUBLIC EXHIBITION SUMMER 2017 PLANNING SUBMISSION STAKEHOLDER ENGAGEMENT STAKEHOLDER ENGAGEMENT WINTER 2017 CONSTRUCTION SPRING 2019 USE

  19. CONTACT DETAILS: ROLF NIELSEN - ASSOCIATE PARTNER C.F. MØLLER ARCHITECTS A: METROPOLITAN WHARF BLDG, 70 WAPPING WALL, LONDON E1W 3SS E: RN@CFMOLLER.COM T: +44 (0)20 7427 1540

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend