Co unc il Pre se nta tio n DEC EMBER 15, 2017 ATTACHMENT B F low - - PowerPoint PPT Presentation

co unc il pre se nta tio n
SMART_READER_LITE
LIVE PREVIEW

Co unc il Pre se nta tio n DEC EMBER 15, 2017 ATTACHMENT B F low - - PowerPoint PPT Presentation

F L OW T R AIL PR OJE CT 2017 Co unc il Pre se nta tio n DEC EMBER 15, 2017 ATTACHMENT B F low T r ail Pr ojec t Motion During Oc to b e r 25, 2016 Co unty Co unc il me e ting c o unc ilo r I zra e le vitz mo tio ne d fo r the


slide-1
SLIDE 1

F L OW T R AIL PR OJE CT 2017

Co unc il Pre se nta tio n

DEC EMBER 15, 2017

ATTACHMENT B

slide-2
SLIDE 2

F low T r ail Pr

  • jec t Motion

During Oc to b e r 25, 2016 Co unty Co unc il me e ting c o unc ilo r I zra e le vitz mo tio ne d fo r the Co untry to utilize $50,000 o f the $500,000 pre vio usly e a rma rke d fo r mo unta in b ike tra ils o n Pa ja rito Mo unta in c urre ntly c o nta ine d in the CI P funds to pursue a pilo t pro je c t o n de mo nstra ting the c o nstruc tio n a nd ma inte na nc e o f a mo unta in b ike flo w tra il o n Co unty la nd.

ATTACHMENT B

slide-3
SLIDE 3

F low T r ail Cr itic al T imeline – Winter

  • f 2016/ 2017
  • Ma ny pub lic me e ting s we re he ld to disc uss F

lo w T ra il c o nc e pts a nd tra il lo c a tio n o ptio ns

  • Outre a c h pre se nta tio ns: K

RSN inte rvie ws, Na ture o n T a p a t UnQua rke d , F a rme rs Ma rke t, T ra ils Wo rking Gro up

ATTACHMENT B

slide-4
SLIDE 4

PR B Meeting 4-13-17

Me e ting Disc ussion

  • Disc usse d a ll po ssib le lo c a tio ns o f pro po se d F

lo w T ra il to Bo a rd a nd pub lic

  • T

hre e tra il lo c a tio ns we re pre se nte d (Ba yo Ca nyo n, Wa lnut Ca nyo n, a nd Pue b lo Ca nyo n)

  • T

he pub lic se ntime nt a g re e d o n the de sire fo r a F lo w T ra il a t Pa ja rito Mo unta in

  • A to wnsite lo c a tio n c o uld no t b e a g re e d upo n

ATTACHMENT B

slide-5
SLIDE 5

F low T r ail Cr itic al T imeline – Spr ing of 2017

  • L

AC sta ff wo rking with pub lic de te rmine d tha t Ba yo Ca nyo n wa s the b e st o ptio n o n Co unty Ope n Spa c e la nd a nd ma ppe d a nd fla g g e d a po te ntia l tra il ro ute

  • Cha lle ng e s fo r Ba yo Ca nyo n:

1. T

  • po g ra phy
  • 2. Use r c o nflic t
  • 3. Vie w she d disruptio n
  • 4. Shuttle se rvic e
  • 5. Re me dia tio n site s
  • 6. Histo ric a l a nd Cultura l site s
  • 7. Ha b ita t
  • 8. Na tura l a re a s

ATTACHMENT B

slide-6
SLIDE 6

Pr

  • posed Bayo Canyon F

low T r ail

ATTACHMENT B

slide-7
SLIDE 7

PR B Meeting 6-8-17

Me e ting Disc ussion

  • L

AC Ope n Spa c e s sta ff g a ve upda te o n a pro po se d ro ute in Ba yo Ca nyo n a nd c ha lle ng e s we re disc usse d

  • Pub lic se ntime nt re ite ra te d tha t the mo st a ppro pria te

lo c a tio n wa s still a t Pa ja rito Mo unta in b e c a use o f the c ha lle ng e s a sso c ia te d with Ba yo Ca nyo n

ATTACHMENT B

slide-8
SLIDE 8

F low T r ail Cr itic al T imeline – Summer

  • f 2017
  • L

AC sta ff e va lua te d a ll c ha lle ng e s a nd pre pa re d a n RF P fo r flo w tra il de sig n a nd c o nstruc tio n

  • RF

P wa s a dve rtise d

  • L

AC sta ff invite d ma ny tra il de sig n a nd c o nstruc tio n firms to b id o n the RF P

  • One re spo nde nt sub mitte d a pro po sa l. Due to c o sts

b e yo nd the Co unc il a llo c a te d a mo unt we ha d to de c line the RF P pro po sa l

ATTACHMENT B

slide-9
SLIDE 9

F low T r ail Cr itic al T imeline – Winter 2017/ 2018

  • Wo rk with a ll pub lic la nd o wne rs (L

ANL , Na tio na l F

  • re st, Pa ja rito Mo unta in) a nd

re side nts to de ve lo p a ho listic , fa mily frie ndly, lo ng ra ng e ma ste rpla n fo r the future o f mo unta in b iking in L

  • s Ala mo s Co unty.
  • L
  • s Ala mo s Co unty Mo unta in Bike Ame nitie s:

1. Ne w F lo w T ra ils – Be g inne rs to Adva nc e d 2. Ne w I nte rme dia te to Adva nc e d Bike Pa rk 3. Upg ra de Be g inne r to I nte rme dia te Bike Pa rk

  • Ne w Pump T

ra c k

  • Ne w Ob sta c le Co urse s
  • BMX T

ra c k

  • Stride r Bike Pa rk

ATTACHMENT B

slide-10
SLIDE 10

F low T r ail Cr itic al T imeline – Winter 2017/ 2018 c ont.

  • Onc e c o mple te d, the pla n will a llo w b ike rs to sta rt a t the

to p o f the ski hill a nd b ike to Hig hwa y 4 se a mle ssly a nd/ o r e njo y the va rie d a me nitie s thro ug ho ut the e ntire syste m

  • T

his pla n will a lig n a ll pa rtie s to c o lla b o ra te o n:

  • 1. Gra nts a nd funding so urc e s
  • 2. T

ra il sta nda rds tha t a re susta ina b le , lo ng la sting , a nd lo w ma inte na nc e

  • 3. T

a rg e ting a ll le ve ls o f mo unta in b ike rs

  • 4. Ma rke ting e ffo rts, c ro ss pro mo tio na l e ffo rts to a ttra c t to urism
  • 5. Co mple me nta ry mo unta in b iking a me nitie s
  • 6. F

uture de ve lo pme nt pla nning

ATTACHMENT B

slide-11
SLIDE 11

Que stions?

ATTACHMENT B