City Solutions EcoCity A division of Ecolog International City - - PDF document

city solutions
SMART_READER_LITE
LIVE PREVIEW

City Solutions EcoCity A division of Ecolog International City - - PDF document

City Solutions EcoCity A division of Ecolog International City Solutions Content 2. Mission & Commitment 6


slide-1
SLIDE 1

City Solutions

EcoCity A division of Ecolog International

slide-2
SLIDE 2

City Solutions

slide-3
SLIDE 3
  • 2.
Mission & Commitment 6 2.1 EcoCity Operation Center 8 2.2 Awareness Creation Campaign/Program 13
  • 2.4
Transfer Station Management 23
  • 2.6
Recycling 27
  • 2.8
Waste Incineration 34 2.9 Management of Urban Infrastructures 37 2.10 Green Spaces Management 42 2.11 Waste Water Management 44 2.12 Hazardous Waste 47
  • 2.17
QHSE 60

Content

slide-4
SLIDE 4 4
slide-5
SLIDE 5
  • History
  • supporting international missions in the
Balkans
  • Ecolog International

Strategic Goals

  • international safety and health standards
Exceed customers’ expectation is our motto
  • in the most rural zones of the world
Create long-lasting customer relations by ensuring
  • Core Principles
  • Complying with the international Health, Safety
  • Ecolog is committed to highest integrity and ethical
standards
  • Performance
  • State-of-the-art, scalable ICT system (SAP)
High ethical standards, dedicated employees Long-term client relationships
slide-6
SLIDE 6 6

EcoCity

  • may be done in sorting plants, transfer stations,
compact incineration plants, etc. We do this as a BOOT model (Build-Own-Operate-Transfer); EcoCity designs and
  • f time.
  • After the end of the BOOT contract the plant will be
transferred to the Municipality based on the contractual agreements. infrastructures will be released; parallely a technology and plant to the customer after the agreed operations period. Invest in the Environment
slide-7
SLIDE 7 7
  • Turn-Key Solutions
The management of urban infrastructures is increasingly becoming a complex challenge for municipalities.
  • and operations of tasks can raise the costs and exceed
public budgets. Based on our standardized approach of complex project management and integrated operation centers, we are
  • the utmost satisfaction of our customers. The customer
  • The focus of our philosophy is the long-term partnership
with our customers. Therefore we are able and willing to commit to contracts not only for one or two years; the always is in the forefront of EcoCity’s mission.
  • harsh conditions.
  • complete maintenance know-how and experience at
command.

Latest

Technology ‘made-to-last’

slide-8
SLIDE 8 8 EcoCity’s Operation Center will take care of the planning,
  • Furthermore the Operation Center will act as a Customer
  • and coordinated.
Operation Center

2.1

Ecocity

Operation Center

Operations Center of Rio de Janeiro/Brazil Municipality based on IBM Smart City Concept
slide-9
SLIDE 9 9

Regional Structure and District Management

  • etc. in the system.
the database. Buildings, plots, industrial areas and other
  • necessary facilities will be maintained in the database
including the complete address and contact information.

High Level Process Operations Center

Project Planning Operations Center Mobilization Project Execution Project Monitoring Project Mobilization Customer Interaction Center Materials Workforce Vehicles Container The city electronic map will be imported into EcoCity’s eMap solution. Once the data is uploaded, GPS coordinates will be linked to the address and district management. The eMap database will be maintained by EcoCity’s planning team in close cooperation with the city planning department of the customer. The integration of objects/GPS data in eMap will support
slide-10
SLIDE 10 10 Operation Ceanter

Waste Bin Management

Each waste bin will be registered in the database including key data i.e. manufacturer’s name, production year, supply period.
  • sizes of households.
Waste bins range from 120l, 240l, to 1,100l capacity. Our
  • the bin after putting the waste; solid rubber tires for easy
  • exact position will be read with a handheld scanner and
location data will be synchronized with EcoCity’s database system.
  • to minimize the risk of accidents.
  • Barcode
RFID Key Reader Bin with Key/Barcode
slide-11
SLIDE 11 11

Vehicle Management

  • information like manufacturer’s name, production year,
registration number, serial number, weight, maximum
  • parts details will also be entered into the database.
  • and operating hours are monitored. The information in
  • lists, spare parts planning and forecasting.

Workforce Management

coordinated through the operations center. Employee
  • teams.
be done on an ongoing basis and teams will be assigned to
  • distributed and the teams will get a brief on the shift tasks.
slide-12
SLIDE 12 12

Operational Route Planning Collection Calendar

EcoCity will conduct a detailed planning and ongoing
  • ptimization of the routes.
  • into consideration.
JULY 2012 AUGUST 2012 SEPTEMBER 2012 Sun Mon Tue Wed Thu Fri Sat 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Sun Mon Tue Wed Thu Fri Sat 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Sun Mon Tue Wed Thu Fri Sat 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Sun Mon Tue Wed Thu Fri Sat 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Sun Mon Tue Wed Thu Fri Sat 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 OCTOBER 2012 NOVEMBER 2012
  • map.
Operation Center EcoCity will create a waste collection calendar which will be distributed to all households and the municipality. This calendar will clearly show what kind of waste (household
  • time mentioned.
slide-13
SLIDE 13 13 A critical component in any waste management program is public awareness and participation in addition to appropriate legislation, strong technical support and
  • 2.2

Awareness

Creation Program

slide-14
SLIDE 14 14 the citizens on proper waste management concepts. This will support public awareness and participation resulting in successful waste management. Our experience shows that an awareness creation program
  • acknowledged within the municipality and EcoCity will
publicize the results so that people are aware of changes,
  • We realize this through :
Banners and posters put up throughout the city and
  • areas.
Waste inspection teams Courses aimed at educating school teachers on waste management issues who will in turn educate their students.
  • the impacts of poor waste management on health
  • feature distinguished people from politics, religion,
economy or society Awareness Creation Program Metal and glass take the longest to dissolve Never leave your trash out of the bin Dispose your waste in separate bins Teach your children how to reduce waste
slide-15
SLIDE 15
  • f tons of solid waste. This waste has to be handled in the
  • In some cases the costs for the management of waste
  • EcoCity welcomes this challenge and is ready to support
  • waste management based on international standards but
always adapted to the local situation. waste management experts – for sure we will care for your needs!

Introduction

Solid Waste Management

slide-16
SLIDE 16 16 Landfill Refuse-derived fuel (RDF) Cement Plant Composting Plant Agriculture Paper & Cardboard Industry Sorting Plant PET Recycling Glass Recycling Plastic Recycling Metal Industry Treatment / Landfill Incinerators Collection System Total Generated Household Waste Slaughter House Hospital Hazardous Waste Center Waste Treatment Plant Biological kitchen & Garden Waste, Wood Paper, Carton Plastics, Plastic Foils PET and PE Bottles Glass NE Metals, FE Metals Hazardous Waste Hospital Waste Slaughter House Waste Diapers, Hygenics Tetrapack,Styropor, Textile,Rubber, Shoes Stones, Bricks More than 40mm Others

Solid Waste Flow

slide-17
SLIDE 17 17

Rapid Cleaning Intervention

  • communities.
With a fast-track analysis, we deploy a number of teams
  • loaders, bobcats will be used following a structured rollout
plan. interruptions that result from the deployment of our cleanup crews. We also understand that during long periods of waste
  • City Centers / Market Areas
In municipalities some areas like market areas or small roads in historical districts may be inaccessible for garbage
  • collection.
Pick-up trucks are used to collect the waste from smaller inaccessible roads. In market areas, waste collectors are deployed with electro carts, wheel-barrows and hand tools that help in collecting the waste from the market booths. collect the waste and transport it to the next transfer
  • the market operation.
slide-18
SLIDE 18 18

Industrial Waste

Each kind of trade and industry generates waste that is be segregated depending on their components and
  • Corresponding to the handled raw materials and
pre-products, EcoCity will check the generated waste and
  • Production waste
Hazardous waste
  • for the waste disposal.
The waste will be collected either based on a schedule (recommended for smaller companies) or based on companies). Skip trucks will collect and replace the skips at the location
  • f the company.
Solid Waste Management

Household Waste

A well organized disposal of waste is an integral part of fostering good health of the population and leads to
  • EcoCity will collect the waste from households based on a
scheduled collection scheme on a regular basis.
  • be scanned to document the collection date and time.
  • minimize the risk of accidents.
slide-19
SLIDE 19 19

Construction and Demolition Waste

  • done if a construction site has to be cleared shortly and
there is no time for sorting and recycling. Construction and demolition waste can be used for the
  • Ideally construction and demolition waste will be crushed
construction, road stabilization or for the construction of sound barriers along highways. For the immediate use of crushed material a mobile crusher will be set up on the construction site. disposal of construction and demolition waste, EcoCity will analyze the construction and demolition waste regarding hazardous substances like asbestos.

Medical Waste

Medical waste is a special waste particularly with regard to the composition. The waste may contain some types of hazardous substances.
  • which may be hazardous like
Body parts
  • Blood and blood residues
Contaminated bandages and bed linens
  • containing mercury
  • EcoCity will collect medical waste in special containers
  • For the transportation, special box trucks will be used to
transport the medical waste to a waste incineration plant
slide-20
SLIDE 20 20

Bulk Waste

Bulk Waste is non-hazardous waste which is too big or
  • EcoCity will create a periodical bulk waste collection
calendar which will be distributed within the communities. The calendar will show the exact dates and areas for bulk waste collection. Optionally citizens can contact EcoCity’s Operations Center in order to arrange the collection of bulk waste. In this case the operations center will agree a pickup date on which the bulk waste will be collected.

River Cleaning

  • groundwater pollution and odor nuisance Furthermore
  • water. All of these problems may lead to health risks for
  • processing or disposal.
  • steel grids which will be specially designed for the
particular need. These steel grids will be installed at the than the collection out of the water.

Beach Cleaning

reputation often depends on the cleanliness of the beaches.
  • generating business and boosting the city’s economy.
  • The cleaning of beaches is usually done after sun dawn to
limit disturbance. Solid Waste Management
slide-21
SLIDE 21 21

Ad Hoc Requests

  • Waste bins were skipped or demolished
Waste bins were stolen People littered larger amounts of waste on streets,
  • earliest.
Based on the importance of the incident the operation
  • Agreement.

Document Destruction

years.
  • and discrete destruction of documents and records for
public administration and commercial sector. will shred the documents on site and in presence of the customer’s person in charge. The paper waste produced will be processed in a sorting
  • Rental of Roll-Off and Skip Containers
  • The container will be picked up and according to its
treatment or disposal. The following containers will be provided for rental: Skip Containers 1m33, 7m3, 10m3 open or with lid
  • 3, 20m3, 36m3, 40m3 open
  • r with lid
  • 3, 20m3
slide-22
SLIDE 22 22 GSM / GPRS WLAN UMTS SOAP / XML Email SMS Disposition Parameter Orders Key Figures Hand reader Transponder recognition Order management Vehicle scale Rear view camera Wireless Communication GPS / DGPS Tracking
  • GPS
UKW UKW / RDS / TMC Vehicle Engine / Body Pour Pour timing Truck- Trailer Scale Dynamic Container scale Ident Transponder reader
  • 4-Wheel / Comb
Right - hand pour NMEA Text Bluetooth WLAN CANxxx CANopen Gateway BDE-Bus RS 485 CleANopen (in preparation) CE-Onboard computer Order management Time capture Tour recording Navigation Remote maintenance BDE-Bus RS 485 s R RS CleANopen Nope n) (in preparation) ar rat e ce

Waste Collection Equipment

  • compliance with European standards which will support
  • according to European standards. Global Positioning
Systems (GPS) will enable monitoring and scheduling of all
  • 3, 8m3, 12m3, 16-28m3,
22-24m3, and 30-40m3. Small pick-up trucks are used to collect waste from narrow roads.
  • the system “One Stop”. This system allows the emptying
and washing of waste bins 60-1,100l in one process and will support the reduction of pests and odor. EcoCity suggests the deployment of such trucks with rotating shifts in order to clean each waste bin on regular basis. Solid Waste Management
slide-23
SLIDE 23 23

Transfer Station

Management

Transfer Stations play an important role in a community
  • disposal facility.
EcoCity recommends transfer stations for the primary reason of reducing the cost of transporting waste to disposal facilities. Consolidating smaller loads from
  • sites and spend more time collecting waste.
Garbage trucks which collect the waste in the districts
  • compactor 10-12 tons)
management of your waste transfer stations. We will analyze the needs and compare it with the existing structure and based on the gap analysis, we will optimize the facilities.
slide-24
SLIDE 24 24 economic handling of all waste collection streams. Waste Additionally transfer stations act as collection point household hazardous waste or electronic waste. EcoCity’s Transfer Station Management includes the
  • incineration plant. Regular reports and recommendations
  • management program.
  • maintenance as well as breakdown maintenance will be
  • maximize the lifespan of the plant.
Transfer Station Management

Mobile Transfer Stations

community is not always feasible.
  • the deployment of 40” waste compactor trailers. If during
the waste collection a garbage compactor is loaded it will reload the waste into the waste compactor trailer. Waste compactor trailers will be positioned at central
  • and noise and odor nuisance while deciding the location.
One waste compactor trailer is able to load the waste of 3-4 garbage compactors before it transports the waste to a
  • ensure a redundancy of waste compactor trailers in order
to minimize waiting times of garbage compactors.
slide-25
SLIDE 25
  • EcoCity’s philosophy is based in the reduction of MSW
  • this reduction by maximizing recy
cling. As solid waste disposal costs continue to rise, recycling
  • redundant.
  • processing step between the collec
tion of recyclable materials from waste generators and the sale of recyclable materials to markets for use in making new products.

Sorting Plant

Management

slide-26
SLIDE 26 26
  • 3.
  • construction uses rotating blades to open bags or
boxes with mixed communal waste. Incl. eco tank transported to septic tanks or public sewage system. Sorting drum for waste selection according to type, structure and size. The length of the screw rotation
  • and preparation for further selection is obtained.
and airing of the waste to be forwarded to the sorting line.
  • waste and waste residues from the sorting drum;
  • rganic waste will be forwarded to the composting
  • incineration plant.
  • wide. The belt speed is adjustable to the processing
progress. Container sorting unit with a length of 24 m; made
  • f prefabricated containers 3 and 4 m wide, placed
music system for the creation of a good working
  • Containers for the collection of extracted waste.
Extracted waste will be thrown in chutes beside the workers from where it will go to the container. At the end of the sorting process magnetic separators will be installed for the separation of ferromagnetic metals. The extracted ferromagnetic metals will be transported to a separate container. Furthermore roll containers are placed for the collection of (crushed) glass, not separated and
  • ther waste.
Automatic baler for the compacting and baling of extracted waste – paper/cardboard, metal, plastic.
  • Storage area for the baled waste fractions.
Material Recovery Management

Sorting Plant – Functionality

1 1 2 3 4

  • 6

7 8 9 10 2 6 7 8 9 10 3 4

slide-27
SLIDE 27 27

2.6

Recycling

  • to follow the 4R approach - Reduce, Reuse, Recycle and
  • like returnable glass bottles; recycling of waste like plastic
  • from waste and only what cannot be processed will be
  • Recyclable waste fractions will be extracted from the
waste in sorting plants. The extracted materials will be sold to manufacturers in order to process new materials out of the used materials. EcoCity will care for the handling of the extracted waste and trade on local and international markets.
slide-28
SLIDE 28 28 Recycling

EcoCity Recycling Paper

1 Collection

P a p e r c
  • l
l e c t e d b y E c
  • C
i t y ’ s t r u c k s . P a p e r t r a n s p
  • r
t e d t
  • p
a p e r r e c y c l i n g p l a n t .

2 Sorting

P a p e r m a n u a l l y s
  • r
t e d a n d c
  • n
t r
  • l
l e d

3 Processing

P a p e r i s t h e r m
  • c
h e m i c a l l y p r
  • c
e s s e d i n t
  • p
a p e r p u l p +

4 Screening & cleaning

S c r e e n i n g a n d c l e a n i n g t h e p u l p r e m
  • v
e s s m a l l c
  • n
t a m i n a n t s a n d p a r t i c l e s

5 Papermaking

T h e p u l p p a s s e s t h r
  • u
g h a l a r g e p a p e r m a c h i n e t
  • p
r
  • d
u c e l a r g e r
  • l
l s
  • f
p a p e r

6 Paper products

P a p e r i s r e
  • r
  • l
l e d i n t
  • s
m a l l e r p a p e r p r
  • d
u c t s s u c h a s t
  • i
l e t p a p e r a n d t
  • w
e l s Recycling
slide-29
SLIDE 29 29

EcoCity Recycling Plastic

1 C

  • l

l e c t i

  • n
P l a s t i c c
  • l
l e c t e d b y E c
  • C
i t y ’ s t r u c k s . P l a s t i c t r a n s p
  • r
t e d t
  • p
l a s t i c r e c y c l i n g p l a n t .

2 S

  • r

t i n g

P l a s t i c m a n u a l l y s
  • r
t e d a n d c
  • n
t r
  • l
l e d i n t
  • :
  • P
  • l
y e t h y l e n e ( P E )
  • P
E T b
  • t
t l e s

3 P r

  • c

e s s i n g

P O L Y E T H Y L E N E i n i t i a l r e c y c l i n g p r
  • c
e s s i n c l u d e s : 1 . S h r e d d i n g 2 . C l e a n i n g 3 . P r i m a r y C
  • l
l e c t i
  • n
f
  • r
f u r t h e r t r e a t m e n t P E T B
  • t
t l e s i n i t i a l r e c y c l i n g p r
  • c
e s s i n c l u d e s : 1 . G r i n d i n g 2 . P l a c e d i n b a g s 3 . R e a d y f
  • r
f u r t h e r p r
  • c
e s s i n g +

4

t h e d r y i n g d r u m

5 P E p e l l e t s

p r
  • c
e s s e d i n e x t r u d e r a n d t r a n s f
  • r
m e d i n t
  • P
E p e l l e t s

6 N e w p r

  • d

u c t s

P E p e l l e t s a r e m i x e d w i t h v i r g i n p e l l e t s t
  • m
a k e n e w b a g s a n d p l a s t i c p i p e

D r y i n g

+
slide-30
SLIDE 30 30 Recycling

EcoCity Recycling Metal

1 Collection

Metal collected by EcoCity’s
  • trucks. Metal transported to
metal recycling plant.

2 Sorting

Metal waste is manually separated according to the metal type

3 Processing 4

Metal blocks are transported to
  • ther metal processing plants

Export

Metal is pressed into blocks by a metal hydraulic compactor
slide-31
SLIDE 31 31 using a complex technology. Therefore it is important to
  • systems and leachate recirculation. Proper operations will
  • does not penetrate the liner and damage the leachate
collection system. The leachate collection system has to be embedded in a
  • be placed to maintain the stability of the slope.
  • Management
slide-32
SLIDE 32 32
  • by raising operation and maintenance issues that need
to be considered already during the design phase. This may be a construction and debris recycling center, green waste composting area, hazardous waste transfer station
  • Optimization
  • Based on the condition audit, a gap analysis will be done
and in close cooperation with the municipality we will
  • Leachate recirculation and control
Flare gas extraction and control
  • Setup of a new disposal area
  • Operations
  • Liners
  • Compacting
  • Soil stabilization
  • Capping
  • scales, etc.
Regular reporting to the municipality incl. capacity forecasting
slide-33
SLIDE 33 33

Decommissioning / Renaturation

  • it reaches its planned capacity.
and renaturation works during and after the end of the
  • Landscaping works
  • Equipment
  • after waste disposal
  • layers
  • f soil/sand/construction waste layers
  • f trucks, issuing of disposal notes, operations
coordination
slide-34
SLIDE 34 34
  • an integral part of the waste cycle as some waste fractions
  • the treatment of certain waste types in niche areas
such as clinical wastes and certain hazardous wastes where pathogens and toxins can be destroyed by high temperatures. Examples include chemical multi-product plants with
  • 2.8

Waste

Incineration

Waste Incineration
slide-35
SLIDE 35
  • Solutions
predominantly for medical waste and certain types of hazardous materials as well as limited amounts of municipal solid waste. Capacities up to 170 m3/day
  • EcoCity works with distinguished manufacturers from
Germany and Europe. The picture below shows our waste incineration plant 100 m3/day (manufacturer Michaelis Germany). EcoCity is operating this incineration plant since 2011 in Mazar-e-Sharif/Afghanistan.

Incinerator Container

  • ram feeder system.
In case a ram feeder is used, it will shift and mix the waste in the incinerator. The waste is incinerated in a rigid incineration chamber. Combustion air is blown into the incinerated material by a nozzle system controlled by the incineration parameters. A burner system is installed to start up the incinerator and
  • In emergency cases a sprinkler system is installed inside the
  • incinerator. The sprinkler system is connected to a water
  • tank. The combustion chamber is lined entirely with high
  • xide content and is resistant to wear.
The construction of the incinerator is made in a way that smaller explosions will not cause damages which endanger the operators.
slide-36
SLIDE 36 36

Post Combustion Container

  • burnt components as this would produce soot and smell.
  • The chamber is designed to completely oxidize all organic
components and CO. This is realized through the installation
  • air is controlled by a oxygen measurement.
In order to compensate the pressure shocks caused by
  • f the second combustion chamber. The exhaust is also
used as emergency stack to protect the operators and the
  • is oxidized and practically free from organic components,
soot, smell and CO.

Auxiliary Parts Container

  • The cleaned gases are released into the air through the
stack. The auxiliary parts container is also used for the combustion second combustion chamber.
  • Waste Incineration
Ecocity medic waste incinerator
slide-37
SLIDE 37 37
  • be managed in the most professional manner.
The repair and marking of roads is important for a
  • broken down will be assisted and in case an immediate
  • next workshop. Furthermore roadside assistance will
  • the streets.
  • risk of accidents.

2.9

Management of

Urban Infrastructure

slide-38
SLIDE 38 38 Urban Infrastructure

Community Cleaning

municipalities. EcoCity deploys an array of modern technology and
  • location.
community places and streets. If an area has fallen below the high standards of cleanliness expected, we will respond
  • back up to the standards.
  • executes a Litter Control Strategy to promote the message
that littering is unacceptable socially and can be ended by a few simple measures.

Classification

  • High and main streets
Secondary streets Commercial streets and public places
  • According to the size of the road, large or small city
sweepers will be used. Small city sweepers will be used which are not accessible by city sweepers will be cleaned
  • manually. Therefore EcoCity will deploy waste pickers and
workforce which will clean the litter and dust using brooms, rakes, wheel-barrows and other tools.

Street Spraying

In order to reduce the dust on roads and to minimize contamination of apartments and houses, water sprayer streets.
slide-39
SLIDE 39 39

Disposal of Litter, Sand and Dust

  • and shrubs
Illegal dumps of waste Waste collected from public trash bins EcoCity recommends to use most of this waste for
  • composting. Visible hazardous waste will be sorted out
before composting and non-compostable waste can be extracted after the composting process.
  • handle as it may contain losses of drips from motor oils,
fuels, abrasion of tyres and brakes. Therefore sweepings are rated as water pollutants and will be used as spacing
  • Equipment
  • Road sweepers large and small
Flushing trucks
  • bins and repositories for sweeping
slide-40
SLIDE 40 40
  • role for the security of a city.
  • plan for each item.
  • regular cleaning and inspection cycles will be scheduled.
  • the functionality of these systems within shortest possible
  • Solar Street Lights
Today the technology of solar street lights is a standard external power source – except sunlight. rechargeable batteries. The batteries are installed in the light case or in the solar street light foundation. Sensors will switch on the light during dusk and switch it
  • The controller will scrutinize the battery capacity and
automatically adjust the light intensity in case of low battery capacity. Solar street lights will be managed through EcoCity’s immediately report breakdowns to the operation center.
  • solar street light.
example special designs for shopping areas or public places.

Traffic Light, Street Light and Traffic Sign Management

Urban Infrastructure
slide-41
SLIDE 41 41

Road Maintenance and Marking

EcoCity understands the importance of road infrastructure
  • In case a road defect is detected, the issue will be recorded
  • the closest road maintenance team in order to get the
repair done at the earliest possible time. Road markings will be registered in EcoCity’s district and
  • be setup in order to regularly check the condition of road
markings and renewing them in case they are worn out.

Roadside Assistance

In cooperation with international automobile associations,
  • truck will transport the car to the next workshop.
  • road and bring them to the next workshop or collection
point.

Road Construction Security

  • Plastic curbs
Temporary road markings Trailers with warning indicators
slide-42
SLIDE 42 42
  • EcoCity manages green parks focusing on the following
  • Gardening
Landscaping Irrigation Green Space Management

2.10

Green Space

Management

slide-43
SLIDE 43 43

Gardening

  • Parks and green spaces will be regularly cleaned from litter;
walkways will be swept; public waste bins will be emptied according to EcoCity’s Community Cleaning Plan. holidays etc. will be taken into consideration for the gardening plan.

Landscaping

  • park areas.
  • Walkways / Lawns
Fountains Play areas Sports areas Parking areas Irrigation system

Irrigation Systems

Especially in areas with little rainfall the irrigation of green
  • EcoCity will take care of the installation, operation and
maintenance of irrigation systems. According to the needs possible, grey water will be used for the irrigation in order
  • In areas with no access to the public water system, water
tanks will be installed to ensure the supply of water for irrigation.

Equipment

  • shrubs and trees
slide-44
SLIDE 44 44 Waste Water Management The access to clean water is one of the most serious issues in many countries in the world. Contaminated water is the source of numerous diseases, a lot of them may lead to death. EcoCity cares for municipalities’ needs in setting up
  • commercial septic tanks, we take care of the inspection
and maintenance of public sewer systems. We also manage
  • ur customer’s waste water treatment plants in order to
  • 2.11

Waste Water

Management

slide-45
SLIDE 45
  • Sewer Inspection and Maintenance
Parts of Public Sewer Systems were built decades ago. As
  • system.
  • stage of a public sewer system.
through odor, a loss of sewage water accompanied by a contamination of the soil in the proximity of the sewer
  • system. The functionality of the whole sewer system is
  • By using camera systems with GIS/GPS/transponder
technology the inspection of sewer systems can be tracked and recorded. This will support the creation of sewer
  • municipality for documentation purposes.
maintenance and repair of sewer systems and a reduction
  • technology in order to reduce the need for supply water
  • Litter, sand, mud and dust are collected in a separate
chamber of the truck system. For major maintenance and disposal of these residues from the jet truck. This will
  • Sewer inspection by camera systems
Physical inspection of sewer systems
  • Repair/replacement of damaged sewer pipes
  • Cleaning of drainage sinks
slide-46
SLIDE 46 46

Management of Waste Water Treatment Plants

  • and industry.
population. treatment it has to be ensured that all substances will be
  • stages
  • laboratories
Regular detailed reporting to the customer Waste Water Management

Septic Collection & Disposal

  • existing sewer system.
  • sanitized regularly to ensure a smooth operation.
  • and incidental septic collection as well as tank cleaning
slide-47
SLIDE 47 47
  • Class2 - Gases
  • Class4 - Flammable and Combustible Solids
  • Class6 - Toxic Materials and Infectious Substances
  • 2.12

Hazardous

Waste

slide-48
SLIDE 48 48

Operations Execution

  • determine its hazards and the process of storage, handling,
transportation and disposal. EcoCity’s HWM capabilities.
  • able to present a treatment solution for any HazMat types
except class 7. All HazMat types will be disposed/incinerated in professional and attested facilities only. For disposal and customer. Hazardous Waste

Handling of Used Grease

  • drums with secured lid.
reprocessing; optionally used grease can be used as secondary fuel in power plants. For the handling of used grease standard Personal
  • Customer Request
Site Inspection Upload of Ctes Forwarding Ctes to Customer
  • f HazMat Types
torage, Packaging, Transport, Disposal/Recycling Parameters Construction/ Preparation
  • f Facilities
Mobilization of Equipment and Workforce Application for needed C Transport Planning Temporary Hazmat Storage Hazmat Treatment & Packaging HazMat Labeling Transport Documentation Loading HazMat Collection HazMat Delivery Transportation Recycling Disposal Incineration Invoicing Determination of Resources Manpower, Facilities, Equipment, Materials

High Level Process Scenario - HazMat Waste Management

Assessment Mobilization Execution Reporting
slide-49
SLIDE 49 49

Handling of Used Engine Oil

  • Engine oil must not be mixed with other oil types.
  • drums.
power plants to be used as secondary fuel; optionally used
  • to the workforce.

Handling of Used Coolant/Antifreeze

  • top steel drums.
distillation and production of new coolant/antifreeze. For the handling of coolant/antifreeze standard PPE is
  • Handling of Used Vehicle Batteries Lead/Acid
  • barred boxes.
  • The battery casing will be dismantled; plastic will be
production of new materials. Optionally the plastic may be used as secondary fuel for power plants.
  • to local melting plants for further processing.
slide-50
SLIDE 50
  • Handling of Used Acid
  • the acid will be neutralized using ph alkali.
i.e. lime or clay. The mixed product will be incinerated according to accepted procedures. For the handling of used acid specialized, acid-resistant
  • Handling of Used Solid Electrolyte Batteries
  • top steel drums.
  • Flammable materials like plastic and insulation will be
  • cleaned and pollutants will be neutralized.
Battery cells will be shredded and heated until the metal
  • Extracted metals will be sold to manufacturing industry.
For the handling of solid electrolyte batteries specialized,
  • Handling of Drilling Muds
  • HazMat class 6 as they may contain i.e. benzoyl, mercury
and oil residues. customers as a permanent or mobile solution. Contaminated drilling mud will be loaded into a batch dryer.
  • Clean soil and clean water can be reused; the exhaust is not
containing any pollutants. Chemical residues will be incinerated according to accepted procedures. For the handling of drilling mud specialized, acid-resistant
  • Handling of Used LiSO2 Batteries
  • LiSO2 batteries will be protected against short circuit by
  • secured lid. Additionally a special inner PE packing bag will
  • palleted.
The transportation will be done to attested disposal facilities. In case LiSO2 batteries will exceed a space diagonal of batteries will be incinerated in special HazMat incineration plants.
  • customer as a proof of professional disposal.
For the handling of used LiSO2 batteries standard PPE is
  • Hazardous Waste
slide-51
SLIDE 51
  • chances of health related risks to the community.
to eradicate the current breeding in the communities/ colonies that exist today. EcoCity’s Integrated Vector Control Plan is a framework and accomplished within communities. The plan
  • management.
  • natural structures, food sources and seasonal change
impacts.

2.13

Vector

Control

slide-52
SLIDE 52
  • EcoCity documents any information showing historical
  • Pest control technicians will lay traps and pesticides.
according to the agreements with the customer.
  • adjusted based on trend analysis

Collaboration with Health Authorities

the responsible health authorities in a municipality. This shall help to identify health risks within a community and form the basis for public information and immunization programs.
  • Equipment
EcoCity will manage Vector Control with the help of pest
  • Traps
Pesticides Cages Containers Pesticide dispersal systems. Vector Control
slide-53
SLIDE 53
  • buildings, plants and systems to an integrated program
  • f a plant or building.
solution to its customers in order to enable you to focus on
  • Facility
Information Modeling, Technical (Hard) Facility Management and Infrastructural (Soft) Facility Management.

2.14

Facility

Management

slide-54
SLIDE 54
  • Facility Lifecycle Management
  • EcoCity as your partner for Facility Lifecycle Management
  • scenarios; using best practices from comparable
projects; analyzing renewable resources
  • subassemblies
  • stakeholders in order to increase the collaboration
  • which will allow the digital representation of
physical and functional characteristics of a facility.
  • ERP system of EcoCity
  • The customer is able to make his decision for
  • assets by using the building information modeling
  • status by web access
Permanent comparison of “to be” and “as is”;
  • taking all aspects into consideration
Facility Management
slide-55
SLIDE 55
  • Facility Information Modeling
  • Based on the documentation a site inspection/condition,
audit will be conducted.
  • gap analysis and all information will be used to create the
  • systems will be integrated and each asset will be clearly
  • to form the basis for space and facility management.
  • Technical Facility Management
EcoCity’s Technical Facility Management maintains all
  • Air Conditioning/Ventilation
Plumbing Fire Alarm and Protection
  • Building Automation
Access Control, Monitoring and Address Systems Electrical and Lighting Building Structure Canteen Appliances
  • Regular inspections of the plants and systems to
detect malfunctions at the earliest stage Scheduled maintenance based on German plant
  • suppliers’ maintenance instructions
  • Infrastructural Facility Management
In the area of Infrastructural Facility Management EcoCity
  • Facility Cleaning
Gardening/Landscaping Car Park Management
  • The needs of our customers are always in the foreground!
slide-56
SLIDE 56
  • Induction trainings, QHSE trainings, refresher trainings,
  • basic elements of EcoCity’s training program.
Furthermore a solid training will reduce the number and work.
  • Training & Development

2.15

Training &

slide-57
SLIDE 57
  • Training Center
  • customer.
  • r newly recruited) will participate in an assessment to
  • Based on the assessment, the employees will be enrolled
for an induction program which will consist of standard particular designations.
  • language of the employee.

Sample Training Plan for a ‘Garbage Compactor Driver’

  • Introduction EcoCity
  • Wearing uniform
Rights and obligations of the employee
  • First Aid
  • Communication with the ‘customer’
Handling of the garbage compactor
  • Speed during collection
  • Monitoring the compactor/cleaning system
  • Handling of the truck computer system
  • Work Safety Aspects
tasks the induction training will take 1-3 days and consists
  • f theoretical and practical sessions. At the end of the
induction, the employees will participate in a test where
  • Sample Training Plan for a ‘Waste Collector’
The following scenario describes the induction training for
  • Introduction EcoCity
EcoCity Code of Conduct
  • Wearing uniform
Rights and obligations of the employee
  • First Aid
  • Communication with the ‘customer’
Handling of waste bins
  • Use of the compactor/cleaning system
  • Work Safety Aspects
tasks the induction training will take 1-3 days and consists
  • f theoretical and practical sessions. At the end of the
induction, the employees will participate in a test where
slide-58
SLIDE 58
  • Consultancy / Collaboration with the Customer
As your accountable partner, EcoCity has no hidden
  • agenda. Once the cooperation with the customer starts,
  • population of the city.
  • f the municipality as well as operation experts of EcoCity.
Consultancy
  • satisfaction of the customer. Furthermore approaches to
increase the public awareness will be discussed. public institutions for further analysis and studies.

Consultancy

slide-59
SLIDE 59
  • Consultancy / Collaboration – Waste Analysis
EcoCity will setup an ongoing waste analysis program to clearly identify and classify the waste of a municipality
  • campaigns like segregating particular waste fractions
which do not belong to household waste.
  • statistics management.
  • i.e. the implementation of multiple bin collection based on
the results of the solid waste analysis.

Consultancy / Collaboration – Waste Logistics Optimization

  • these resources will greatly depend on a municipality
  • new residential, commercial and industrial areas, or the
  • EcoCity’s aim is to continuously analyze routes and
resources used and to optimize their utilization. This
  • extension of existing transfer stations, collection times etc.
All data collected will be analyzed and used for scenario congestions. planning which will again form the basis for the ongoing
  • Consultancy / Collaboration – Add-on Solutions
More can be less - One of the philosophies that EcoCity follows In case EcoCity’s ongoing analysis show considerable technologies, we will make the customer aware of the same by preparing the concept and presenting it to our customer
  • f the solution.
For example EcoCity will present a solution for a sorting
slide-60
SLIDE 60 60
  • Internal Controls
Standard Operating Procedures and Inspections
  • Quality Training and Control
QHSE

2.17

QHSE

The Principles of Quality

slide-61
SLIDE 61 61 2nd Party Compliance Quality Management System Internal Audits 3rd Party Accreditations ISO, OHSAS, CQI, Quality Assurance The Principle of Quality Planning and Implementation Audit & Review Management Commitment Policy and Objectives Organisation Documentation Resourses Risk Management Planning Implementation & Monitoring

Incident Free Workplace

QHSE-Model

Work Safety

  • Establishing safe work practices in all areas of
  • perations
  • safely
slide-62
SLIDE 62 www.ecocity.net info@ecocity.net
slide-63
SLIDE 63

Germany

Ecolog International Deutschland GmbH In der Steele 14
  • Strategy

Macedonia

Ecolog DOOEL Vidoe Smileski Bato n.n. PO Box 114
  • Operations Support

United Arab Emirates

Ecolog International FZE
  • Product Development
slide-64
SLIDE 64