City of Stoughton, West Main Street US 51 Hoel Avenue Page Street Alex Hagen, P.E. WisDOT Project Manager Public Involvement Meeting No. 1 November 8, 2018 Presentation Outline Project Area Project Purpose and Need Project


slide-1
SLIDE 1

Alex Hagen, P.E.

WisDOT Project Manager

Public Involvement Meeting No. 1

November 8, 2018

City of Stoughton, West Main Street US 51 Hoel Avenue – Page Street

slide-2
SLIDE 2

Presentation Outline

  • Project Area
  • Project Purpose and Need
  • Project Schedule
  • Construction Staging/Detour
  • Comments and Questions
slide-3
SLIDE 3

Project Area

Hoel Avenue Jefferson Street King Street Rowe Street Nora Street Gjertson Street Van Buren Street Harrison Street Monroe Street Madison Street Prairie Street Page Street Jackson Street Yahara River

NORTH

slide-4
SLIDE 4

Project Purpose and Need

Project Purpose

This project will address current concrete pavement distresses and evaluate curb ramp design, within existing right of way, for Americans with Disabilities Act (ADA) compliance until a long-term US 51 pavement reconstruction can be pursued.

slide-5
SLIDE 5

Project Need – Roadway Pavement Deficiencies

The pavement along the corridor is experiencing severe transverse and longitudinal joint deterioration.

slide-6
SLIDE 6

Some curb ramps in the corridor do not meet current ADA standards. The project will bring curb ramps up to ADA compliance to the extent feasible within existing right of way.

Curb Ramp ADA Compliance

slide-7
SLIDE 7

Project Schedule

PIM No. 1 Environmental Document Design Study Report Final Plans Project is Awarded to Contractor Construction is Anticipated to Begin

  • November 8, 2018
  • December 2018
  • December 2018
  • November 1, 2019
  • April 14, 2020
  • June 2020
slide-8
SLIDE 8

Project Area

Hoel Avenue Jefferson Street King Street Rowe Street Nora Street Gjertson Street Van Buren Street Harrison Street Monroe Street Madison Street Prairie Street Page Street Jackson Street Yahara River

NORTH

Hoel Avenue to Van Buren Street

slide-9
SLIDE 9

Proposed Work

Hoel Avenue to Van Buren Street

  • Spot replacement of concrete pavement.
  • Concrete joint repair.
  • Milling existing concrete pavement in outside lanes.
  • 2-inch asphalt overlay.

4-5’ 4-5’ 12’ 12’ 12’ 12’ ASPHALT PAVEMENT EXISTING CONCRETE PAVEMENT TO REMAIN BASE COURSE TO REMAIN CURB AND GUTTER TO REMAIN SIDEWALK TO REMAIN PROPOSED SECTION

slide-10
SLIDE 10

Construction Staging Stage 1

Stage 1: Median Island Near Hamilton Street

4-5’ 4-5’ 12’ WORK ZONE 12’ MEDIAN

slide-11
SLIDE 11

Construction Staging Stage 2

Stage 2: Right in/right out access will be maintained to businesses and residences at all times.

WB EB

4-5’ 4-5’ 11’ 11’ 12’ 12’ WORK ZONE 2’ 1’

slide-12
SLIDE 12

Construction Staging Stage 2

Hoel Avenue

King Street Rowe Street Pine Street Nora Street Gjertson Street

NORTH

Open at all Times Closed During Stage 2 Alternate Closings One road needs to stay open while other is closed Limited Closing ~10 Calendar Days

slide-13
SLIDE 13

Construction Staging Stage 3

Stage 3: Right in/right out access will be maintained to businesses and residences at all times.

WB EB

4-5’ 4-5’ 11’ 11’ 12’ 12’ WORK ZONE 2’ 1’

slide-14
SLIDE 14

Construction Staging Stage 3

Jackson Street Gjertson Street Van Buren Street

NORTH

Open at all Times Closed During Stage 3 Alternate Closings One road needs to stay open while other is closed Limited Closing ~10 Calendar Days

slide-15
SLIDE 15

Proposed Work

Hoel Avenue Jefferson Street King Street Rowe Street Nora Street Gjertson Street Van Buren Street Harrison Street Monroe Street Madison Street Prairie Street Page Street Jackson Street Yahara River

NORTH

Van Buren Street to Page Street

  • Construction will be completed at the same time as Stages 1-3.
  • US 51 between Van Buren Street and Page Street will be detoured.
  • US 51 will be open to traffic before the 2020-2021 School Year.
slide-16
SLIDE 16

Proposed Work

Van Buren Street to Page Street

  • Full depth pavement replacement

5.5-inches HMA 6-inches Base Aggregate Dense 10-inches Select Crushed Material

4-5’ 4-5’ 10’ 10’ 10’ 10’ ASPHALT PAVEMENT BASE AGGREGATE DENSE SELECT CRUSHED MATERIAL CURB AND GUTTER TO REMAIN SIDEWALK TO REMAIN PROPOSED SECTION

slide-17
SLIDE 17

US 51 Official Marked Detour Route

Monona Deerfield Stoughton McFarland

slide-18
SLIDE 18
  • Comment Form

Fill out Here and Put in Comment Box Take Home and Mail

  • Send Comments Via Email –

Alex.Hagen@dot.wi.gov

Opportunities to Provide Input

slide-19
SLIDE 19

Comments and Questions

Questions?