city of stoughton west main street us 51 hoel avenue page
play

City of Stoughton, West Main Street US 51 Hoel Avenue Page Street - PowerPoint PPT Presentation

City of Stoughton, West Main Street US 51 Hoel Avenue Page Street Alex Hagen, P.E. WisDOT Project Manager Public Involvement Meeting No. 1 November 8, 2018 Presentation Outline Project Area Project Purpose and Need Project


  1. City of Stoughton, West Main Street US 51 Hoel Avenue – Page Street Alex Hagen, P.E. WisDOT Project Manager Public Involvement Meeting No. 1 November 8, 2018

  2. Presentation Outline • Project Area • Project Purpose and Need • Project Schedule • Construction Staging/Detour • Comments and Questions

  3. Yahara River Page Street Prairie Street NORTH Madison Street Monroe Street Jefferson Street Harrison Street Van Buren Street Gjertson Street Nora Street Project Area Jackson Street Rowe Street King Street Hoel Avenue

  4. Project Purpose and Need Project Purpose This project will address current concrete pavement distresses and evaluate curb ramp design, within existing right of way, for Americans with Disabilities Act (ADA) compliance until a long-term US 51 pavement reconstruction can be pursued.

  5. Project Need – Roadway Pavement Deficiencies The pavement along the corridor is experiencing severe transverse and longitudinal joint deterioration.

  6. Curb Ramp ADA Compliance Some curb ramps in the corridor do not meet current ADA standards. The project will bring curb ramps up to ADA compliance to the extent feasible within existing right of way.

  7. Project Schedule • November 8, 2018 PIM No. 1 • December 2018 Environmental Document • December 2018 Design Study Report • November 1, 2019 Final Plans • April 14, 2020 Project is Awarded to Contractor • June 2020 Construction is Anticipated to Begin

  8. Yahara River Page Street Prairie Street NORTH Madison Street Monroe Street Hoel Avenue to Van Buren Street Jefferson Street Harrison Street Van Buren Street Gjertson Street Nora Street Project Area Jackson Street Rowe Street King Street Hoel Avenue

  9. Proposed Work Hoel Avenue to Van Buren Street • Spot replacement of concrete pavement. • Concrete joint repair. • Milling existing concrete pavement in outside lanes. • 2-inch asphalt overlay. 12’ 12’ 12’ 4-5’ 12’ 4-5’ SIDEWALK TO REMAIN ASPHALT PAVEMENT CURB AND GUTTER TO REMAIN EXISTING CONCRETE PAVEMENT TO REMAIN BASE COURSE TO REMAIN PROPOSED SECTION

  10. Construction Staging Stage 1 Stage 1: Median Island Near Hamilton Street 12’ 4-5’ WORK ZONE 4-5’ 12’ MEDIAN

  11. Construction Staging Stage 2 Stage 2: Right in/right out access will be maintained to businesses and residences at all times. WORK ZONE WB EB 1’ 12’ 4-5’ 2’ 12’ 11’ 11’ 4-5’

  12. Construction Staging Stage 2 Open at all Times Closed During Stage 2 Alternate Closings One road needs to stay open while other is closed Limited Closing ~10 Calendar Days NORTH Hoel Avenue Pine Street Nora Street Rowe Street King Street Gjertson Street

  13. Construction Staging Stage 3 Stage 3: Right in/right out access will be maintained to businesses and residences at all times. WORK ZONE WB EB 1’ 4-5’ 12’ 12’ 4-5’ 2’ 11’ 11’

  14. Construction Staging Stage 3 Open at all Times Closed During Stage 3 Alternate Closings One road needs to stay open while other is closed Limited Closing NORTH ~10 Calendar Days Jackson Street Van Buren Street Gjertson Street

  15. Proposed Work Van Buren Street to Page Street • Construction will be completed at the same time as Stages 1-3. • US 51 between Van Buren Street and Page Street will be detoured. • US 51 will be open to traffic before the 2020-2021 School Year. NORTH Jackson Street Gjertson Street Van Buren Street Page Street Prairie Street Harrison Street King Street Rowe Street Hoel Avenue Nora Street Monroe Street Madison Street Yahara River Jefferson Street

  16. Proposed Work Van Buren Street to Page Street • Full depth pavement replacement � 5.5-inches HMA � 6-inches Base Aggregate Dense � 10-inches Select Crushed Material 4-5’ 10’ 10’ 10’ 10’ 4-5’ SIDEWALK TO REMAIN ASPHALT PAVEMENT CURB AND GUTTER TO REMAIN BASE AGGREGATE DENSE SELECT CRUSHED MATERIAL PROPOSED SECTION

  17. US 51 Official Marked Detour Route Monona Deerfield McFarland Stoughton

  18. Opportunities to Provide Input • Comment Form � Fill out Here and Put in Comment Box � Take Home and Mail • Send Comments Via Email – � Alex.Hagen@dot.wi.gov

  19. Comments and Questions Questions?

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.