Lowell High School
J U N E 6 T H 2 0 17
City Council Presentation
L O W E L L H I G H S C H O O L P R O J E C T
City Council Presentation Lowell High School ON 2 ON 3 3 (EX FUL - - PowerPoint PPT Presentation
L O W E L L H I G H S C H O O L P R O J E C T J U N E 6 T H 2 0 17 City Council Presentation Lowell High School ON 2 ON 3 3 (EX FUL ULL R RENOV OVATION ON ADD/RENO OP O OPTION ADD/RENO OP O OPTION EXP) EW 4 -STO EW 5 -STO NEW STORY
J U N E 6 T H 2 0 17
L O W E L L H I G H S C H O O L P R O J E C T
Building/S /Site
New w Information During T This PS PSR Ph Phas ase Differences From PD PDP P to PS PSR Total P Project Budget City S Share 6. 6.4 of 6.6 acres 650. 650.1k gsf (614.3k reno +35.8k add) Existing (63’), 1-3 Story (44’) Addtn’s
m Adjustme ments
Investigations
Soils ls I Investigations
lding Hazmat Investigations
Hist storic Investigations
Investigations + + 8, 8,435 s 435 sf Foundations & s & Superst structure MEP/F /FP Site PDP 2/ 2/2/ 2/17 17 PSR 6/ 6/1/ 1/17 17 $331, $331,36 360,298 298 $343, $343,58 585,338 338 $116, $116,47 472,533 533 $130, $130,02 022,882 882 6. 6.0 of 6.6 acres 636. 636.7k gsf (445.5k reno+191.2k add) Existing (63’), 1-5 Story (68’) Addtn’s
m Adjustme ments
Investigations
Soils ls I Investigations
lding Hazmat Investigations
Hist storic Investigations
Investigations +12, +12,602 602 s sf Foundations & s & Superst structure MEP/F /FP Site PDP 2/ 2/2/ 2/17 17 PSR 6/ 6/1/ 1/17 17 $344, $344,08 087,262 262 $343, $343,94 948,823 823 $135, $135,61 614,525 525 $135, $135,32 320,524 524 7. 7.4 = 6.0 of 6.6 acres +1.4 exp. lot 632. 632.1k gsf (440.1k reno +192k add) Existing (63’), 1-5 Story (68’) Addtn’s
m Adjustme ments
Investigations
Soils ls I Investigations
Investigations
Hazmat I Investigations
l Investigations
Study
Model
Investigations
Species Investigations
6,615 s 15 sf Foundations & s & Superst structure Exterior C Closu sure a and Roofing Interior C Const struction a and Finishes Selective D Demo a and Site Ali lignment with O Option 2 2 PDP 2/ 2/2/ 2/17 17 PSR 6/ 6/1/ 1/17 17 $334, $334,33 335,971 971 $352, $352,55 559,455 455 $126, $126,41 417,978 978 $143, $143,23 232,657 657 23. 23.5 of 43.24 acres 590. 590.3k gsf new construction 4-Story (58’)
m Adjustme ments
Investigations
Soils ls I Investigations
l Investigations
Study
Model
Investigations
Species Investigations +18, +18,787 787 s sf Foundations & s & Superst structure Roofing Stairs s & Interior F Finishes MEP/F /FP Site PD PDP 2/ 2/2/ 2/17 17 PSR 6/ 6/1/ 1/17 17 $332, $332,45 458,871 871 $339, $339,15 152,182 182 $148, $148,34 341,142 142 $152, $152,16 160,821 821 23. 23.5 of 43.24 acres 590. 590.8k gsf new construction 5-Story (68’)
m Adjustme ments
Investigations
Soils ls I Investigations
Investigations
Study
Model
Investigations
Species Investigations N/A /A PSR 6/ 6/1/ 1/17 17 $336, $336,13 138,724 724 $149, $149,43 439,672 672
OPTIONS COST SUMMARY
FUL ULL R RENOV OVATION ON ADD/RENO OP O OPTION ON 2 ADD/RENO OP O OPTION ON 3
3 (EX
EXP) NEW EW 4-STO STORY A AT T CAWLEY NEW EW 5-STO STORY A AT T CAWLEY
Feb. 2017 June 2017 March 2018
Aug. 2016
6.4 .4 of 6.6 acres 650. 650.1k gsf (614.3k reno +35.8k add) New 3 3 Story at 48’(63’ Existing) 725 725 per Survey (629 of Ayotte’s 1200) On Street + Use of City Transit Existing Down-Town Site(s) + Proxi
Frequency of
Buses + Proximity T To Ci City/Social S Services + Adjacent Pk Pkg Garages (C (Cove vered) ±Exi xisting S Service A Access R Remains ―Li Limited A Acce ccess T To Gr Green Space ce ―Busing g Req’d for S Some A Athle letics Meets Objectives Except as Noted: ―Fr Freshman Academy I Is Remot
±Public/Activity A Areas Spr pread & & Spl plit + F.A.
Teams + s + STEM EM/Hum. C Clust sters + Meets N New Standards ( (Cou
Extent of Exist. Ext. Wall Upgrades -TBD ―Orientation I Is Proble lematic ―Windowless C ss Classr ssrooms/ s/Labs s Ex Exist st ―Hi Higher Ope Operating Costs (M (Multi-Bldgs gs) 5 Year (+ summer) Phased Project + Kitchen/Boiler B Built i in First st P Phase se ―Temporary G Gym F Facilities R Required ―Extensive M Modular Cla Classrooms $ 3 343, 3,585, 585,338 338 Total P Project B Budget $ 130, 0,022, 022,882 C 882 City Share
Basement 2nd floor Attic
3rd floor
GEORGE AYOTTE GARAGE LORD BLDG. 1922 BLDG. FRESHMAN ACADEMY FIELD HOUSE TEMP. GYM
SITE FENCE
GEORGE AYOTTE GARAGE LORD BLDG. 1922 BLDG. FRESHMAN ACADEMY FIELD HOUSE 12 MODULAR CLASSROOMS 20 MODULAR CLASSROOMS LOCATION (TBD)
CONSTRUCTION FENCE HALLWAYS OPEN AT 2ND FLOOR
GEORGE AYOTTE GARAGE LORD BLDG. 1922 BLDG. FRESHMAN ACADEMY FIELD HOUSE
CONSTRUCTION FENCE 12 MODULAR CLASSROOMS 20 MODULAR CLASSROOMS LOCATION (TBD)
GEORGE AYOTTE GARAGE LORD BLDG. 1922 BLDG. FRESHMAN ACADEMY FIELD HOUSE
CONSTRUCTION FENCE NEW TWO-STORY BRIDGE 12 MODULAR CLASSROOMS 20 MODULAR CLASSROOMS LOCATION (TBD)
GEORGE AYOTTE GARAGE LORD BLDG. 1922 BLDG. FRESHMAN ACADEMY FIELD HOUSE
CONSTRUCTION FENCE 12 MODULAR CLASSROOMS 20 MODULAR CLASSROOMS LOCATION (TBD)
GEORGE AYOTTE GARAGE LORD BLDG. 1922 BLDG. FRESHMAN ACADEMY FIELD HOUSE
6.0 .0 of 6.6 acres 636. 636.7k gsf (445.5k reno+191.2k add) New 2-3-5-Story at 48-68’(63’ Existing) 725 725 per Survey (629 of Ayotte’s 1200) On Street + Use of City Transit Existing Down-Town Site + Proxi
Frequency of
Buses + Proximity T To Ci City/Social S Services + Adjacent Pk Pkg Garages (C (Cove vered) ±Exi xisting S Service A Access R Remains ―Li Limited A Acce ccess T To Gr Green Space ce ―Busing g Req’d for S Some A Athle letics Meets Objectives Except as Noted: + Fr Freshman Academy C Con
±Public/Activity A Areas Spr pread & & Spl plit + F.A.
Teams + s + STEM EM/Hum. C Clust sters + Meets N New Standards ( (Cou
+ More Ef Efficient/Ef Effective F Field H House se Extent of Exist. Ext. Wall Upgrades -TBD ±Ex Existing I Is P Problematic/New FA FA Ideal ―Windowless C ss Classr ssrooms/ s/Labs s Ex Exist st ―Hi Higher Ope Operating Costs (M (Multi-Bldgs gs) 4 Year (+ summer) Phased Project + Kitchen/Boiler B Built i in First st P Phase se ―Temporary G Gym F Facilities R Required $ 343, 3,948, 948,823 T 823 Total P Project ct B Budget $135, 5,320, 320,524 C 524 City S Share
Basement 3nd floor 4th floor 5th floor 2nd floor
GEORGE AYOTTE GARAGE LORD BLDG. 1922 BLDG. FIELD HOUSE FRESHMAN ACADEMY
CONSTRUCTION FENCE TEMP. GYM
GEORGE AYOTTE GARAGE LORD BLDG. 1922 BLDG. FIELD HOUSE FRESHMAN ACADEMY
CONSTRUCTION FENCE HALLWAYS OPEN AT 2ND FLOOR
GEORGE AYOTTE GARAGE LORD BLDG. FIELD HOUSE 1922 BLDG. FRESHMAN ACADEMY
CONSTRUCTION FENCE
GEORGE AYOTTE GARAGE LORD BLDG. FIELD HOUSE 1922 BLDG. FRESHMAN ACADEMY
7.4 .4 = 6.0 of 6.6 acres +1.4 exp. lot 632. 632.1k gsf (440.1k reno +192k add) New 2-3-5-Story at 48-68’(63’ Existing) 725 725 per Survey (629 of Ayotte’s 1200) On Street + Use of City Transit Existing Down-Town Site + Adjacent Lot + Proxi
Frequency of
Buses + Proximity T To Ci City/Social S Services + Adjacent Pk Pkg Garages (C (Cove vered) + Improved S Service ce/A /Acce ccess ±Mod
Green Space C Created ―Busing g Req’d for S Some A Athle letics Meets Objectives Except as Noted: + Fr Freshman Academy C Con
±Public/Activity A Areas Spr pread & & Spl plit + F.A.
Teams + s + STEM EM/Hum. C Clust sters + Meets N New Standards ( (Cou
+ More Ef Efficient/Ef Effective F Field H House se Extent of Exist. Ext. Wall Upgrades -TBD ±Ex Existing I Is P Problematic/New FA FA Ideal + Light W Wells ls = = No Windowle wless L Labs ―Hi Higher Ope Operating Costs (M (Multi-Bldgs gs) 4.5 Year (+ summer) Phased Project + Kitchen/Boiler B Built i in First st P Phase se + No Modular ars or Tempo porary G Gym ±Only 3 3 Ye Years of 4 4.5 On S School Site ―Land A Acquisition/Emine inent nt D Domain in $ 352, 2,599, 599,455 T 455 Total P Project ct C Cost $ 143, 3,232, 232,657 C 657 City S Share
Basement 3nd floor 4th floor 5th floor
2nd floor
GEORGE AYOTTE GARAGE LORD BLDG. FIELD HOUSE 1922 BLDG. CONSTRUCTION FENCE
GEORGE AYOTTE GARAGE LORD BLDG. FIELD HOUSE 1922 BLDG. FRESHMEN ACADEMY
FRESHMAN ACADEMY CONSTRUCTION FENCE
GEORGE AYOTTE GARAGE LORD BLDG. FIELD HOUSE 1922 BLDG. FRESHMAN ACADEMY
CONSTRUCTION FENCE HALLWAYS OPEN AT 2ND FLOOR
GEORGE AYOTTE GARAGE LORD BLDG. FIELD HOUSE 1922 BLDG. FRESHMAN ACADEMY
CONSTRUCTION FENCE
GEORGE AYOTTE GARAGE LORD BLDG. FIELD HOUSE 1922 BLDG. FRESHMAN ACADEMY
23.5 .5 of 43.24 acres 590. 590.3k gsf new construction New 4-Story at 58’ 750 750 of 850 Estimated Need On-Site 46+ 46+ Car Queue/46 Buses Dbl-Stack Cawley Stadium Site ―Proxi
Frequency T To
Buses ―Proximity T To Ci City/Social S Services ―100 S 100 Space ces E Estimated O Off-Si Site + Fu Full S Service/Perimeter A Access + Ample A Access t to
Space ―Busing g Req’d for A Arrival/Depa parture Meets Objectives Except as Noted: + Fr Freshman Academy C Con
+ Public/Activity Ar Areas C s Clust stered + F.A.
Teams + s + STEM EM/Hum. C Clust sters + Meets N New Standards ( (Cou
+ More Ef Efficient/Ef Effective F Field H House se New Construction and Exterior Shell ±Good f for Most A All T ll Teaching Spaces + No Windowle wless C CRs + + Ideal D l Dayli light + Lowe wer O Operating Co Costs 3 Year Project + No School/ l/Services D Disruption ±Article le 9 97=Field ld R Replication O Off-Si Site (Fr+JV Practice F.Ball+S.Ball Infield) $ 339, 9,152, 152,182 T 182 Total P Project ct B Budget $ 152, 2,160, 160,821 C 821 City S Share
2nd floor 3nd floor 4th floor
23.5 .5 of 43.24 acres 590. 590.8k gsf new construction New 5-Story at 68’ 850 850 Estimated Need Fits On-Site 38+ 38+ Car Queue/46 Buses Dbl-Stack Cawley Stadium Site ―Proxi
Frequency T To
Buses ―Proximity T To Ci City/Social S Services + All P Parking Provi vided On On-Site + Fu Full S Service/Perimeter A Access + Ample A Access t to
Space ―Busing g Req’d for A Arrival/Depa parture Meets Objectives Except as Noted: + Fr Freshman Academy C Con
+ Public/Activity Ar Areas C s Clust stered + F.A.
Teams + s + STEM EM/Hum. C Clust sters + Meets N New Standards ( (Cou
+ More Ef Efficient/Ef Effective F Field H House se New Construction and Exterior Shell ±Good f for Most A All T ll Teaching Spaces + No Windowle wless C CRs + + Ideal D l Dayli light + Lowe wer O Operating Co Costs 3 Year Project + No School/ l/Services D Disruption ±Article le 9 97=Field ld R Replication O Off-Si Site (Fr+JV Practice F.Ball+S.Ball Infield) $ 336, 6,138, 138,724 T 724 Total P Project ct B Budget $ 149, 9,439, 439,672 C 672 City S Share
2nd floor 3nd floor 4th floor 5th floor
6. 6.4 of 6.6 acres 650. 650.1k gsf (614.3k reno +35.8k add) New 3 3 Story at 48’(63’ Existing) 725 725 per Survey (629 of Ayotte’s 1200) On Street + Use of City Transit Existing Down-Town Site(s) + Proxi ximity/F /Frequency o
City Buses + Proxi ximity T To City/S /Social S l Services + Adjacent nt Pk Pkg Garages ( (Cov
± Exi xisting S Service A Access Remains ― Limited Access T To Green S Space ― Busing ng Req’d ’d for S Some A Athletics s Meets Objectives Except as Noted: ― Fr Freshman A Academy I Is Re s Remote ± Publi lic/Activity A Areas S Spread & Split + F.A. T Teams + + STEM/Hum. Clusters + Meets N New Standards ( (Count/S /Size) Extent of Exist. Ext. Wall Upgrades -TBD ― Orientation I Is Proble lematic ― Windowless ss Classr srooms/ s/Labs E Exist ― Higher O Operating C Cost sts ( s (Multi-Bl Bldgs) 5 Year (+ summer) Phased Project + Kitchen/Boiler B Built lt i in First Phase ― Tempor
Gym Facilities R Required ― Ext xtensive M Modular C Cla lassrooms $343, $343,58 585,338 338 $130, $130,02 022,882 882 Building/S /Site
Location
Educ-Program
Sustainability
Const struction PSR P
Cost
6. 6.0 of 6.6 acres 636. 636.7k gsf (445.5k reno+191.2k add) New 2-3-5-Story at 48-68’(63’ Existing) 725 725 per Survey (629 of Ayotte’s 1200) On Street + Use of City Transit Existing Down-Town Site + Proxi ximity/F /Frequency o
City Buses + Proxi ximity T To City/S /Social S l Services + Adjacent nt Pk Pkg Garages ( (Cov
± Exi xisting S Service A Access Remains ― Limited Access T To Green S Space ― Busing ng Req’d ’d for S Some A Athletics s Meets Objectives Except as Noted: + Freshman A n Academy C Conne nnected ± Publi lic/Activity A Areas S Spread & Split + F.A. T Teams + + STEM/Hum. Clusters + Meets N New Standards ( (Count/S /Size) + More E Efficient/Effective F Field H House se Extent of Exist. Ext. Wall Upgrades -TBD ± Exi xisting I Is Problematic/New F FA Ideal ― Windowless ss Classr srooms/ s/Labs E Exist ― Higher O Operating C Cost sts ( s (Multi-Bl Bldgs) 4 Year (+ summer) Phased Project + Kitchen/Boiler B Built lt i in First Phase ― Tempor
Gym Facilities R Required $343, $343,94 948,823 823 $135, $135,32 320,524 524 23. 23.5 of 43.24 acres 590. 590.3k gsf new construction New 4-Story at 58’ 750 750 of 850 Estimated Need On-Site 46+ 46+ Car Queue/46 Buses Dbl-Stack Cawley Stadium Site ― Proxi ximity/F /Frequency T To C City B Buses ― Proxi ximity T To City/S /Social S l Services ― 100 100 Spaces E Estimated Of Off-Site + Full Service/Perimeter A Access ss + Ample A Access t to G Green Space ― Busing ng Req’d ’d for A Arrival/Departure Meets Objectives Except as Noted: + Freshman A n Academy C Conne nnected + Publi lic/Activity A Areas C Clu lustered + F.A. T Teams + + STEM/Hum. Clusters + Meets N New Standards ( (Count/S /Size) + More E Efficient/Effective F Field H House se New Construction and Exterior Shell ± Good f for Most A All T Teaching S Spaces + No W Windowless C ss CRs + s + Ideal Daylight + Lower O Operating Cost sts s 3 Year Project + No S School/S l/Services D Disruption ± Article le 9 97=Field ld R Replication O Off-Si Site (Fr+JV Practice F.Ball+S.Ball Infield) $339, 339,15 152,182 182 $152, $152,16 160,821 821 23. 23.5 of 43.24 acres 590. 590.8k gsf new construction New 5-Story at 68’ 850 850 Estimated Need Fits On-Site 38+ 38+ Car Queue/46 Buses Dbl-Stack Cawley Stadium Site ― Proxi ximity/F /Frequency T To C City B Buses ― Proxi ximity T To City/S /Social S l Services + All P ll Parking Provided O On-Si Site + Full Service/Perimeter A Access ss + Ample A Access t to G Green Space ― Busing ng Req’d ’d for A Arrival/Departure Meets Objectives Except as Noted: + Freshman A n Academy C Conne nnected + Publi lic/Activity A Areas C Clu lustered + F.A. T Teams + + STEM/Hum. Clusters + Meets N New Standards ( (Count/S /Size) + More E Efficient/Effective F Field H House se New Construction and Exterior Shell ± Good f for Most A All T Teaching S Spaces + No W Windowless C ss CRs + s + Ideal Daylight + Lower O Operating Cost sts s 3 Year Project + No S School/S l/Services D Disruption ± Article le 9 97=Field ld R Replication O Off-Si Site (Fr+JV Practice F.Ball+S.Ball Infield) $336, $336,13 138,724 724 $149, $149,43 439,672 672
OPTIONS SUMMARY
7. 7.4 = 6.0 of 6.6 acres +1.4 exp. lot 632. 632.1k gsf (440.1k reno +192k add) New 2-3-5-Story at 48-68’(63’ Existing) 725 725 per Survey (629 of Ayotte’s 1200) On Street + Use of City Transit Existing Down-Town Site + Adjacent Lot + Proxi ximity/F /Frequency o
City Buses + Proxi ximity T To City/S /Social S l Services + Adjacent nt Pk Pkg Garages ( (Cov
+ Improved S Service ce/Acce ccess ± Modest G Green S Space Created ― Busing ng Req’d ’d for S Some A Athletics s Meets Objectives Except as Noted: + Freshman A n Academy C Conne nnected ± Publi lic/Activity A Areas S Spread & Split + F.A. T Teams + + STEM/Hum. Clusters + Meets N New Standards ( (Count/S /Size) + More E Efficient/Effective F Field H House se Extent of Exist. Ext. Wall Upgrades -TBD ± Exi xisting I Is Problematic/New F FA Ideal + Light W Wells = = No W Windowless L Labs ― Higher O Operating C Cost sts ( s (Multi-Bl Bldgs) 4.5 Year (+ summer) Phased Project + Kitchen/Boiler B Built lt i in First Phase + No Modulars or T Temporary G y Gym ± Only ly 3 3 Years of 4. 4.5 On 5 On School S Site ― Land A Acquisition/Emine nent nt D Domain in $352, 352,55 559,455 455 $143, $143,23 232,657 657
FUL ULL R RENOV OVATION ON ADD/RENO OP O OPTION ON 2 ADD/RENO OP O OPTION ON 3
3 (EX
EXP) NEW EW 4-STO STORY A AT T CAWLEY NEW EW 5-STO STORY A AT T CAWLEY