city council presentation
play

City Council Presentation Lowell High School ON 2 ON 3 3 (EX FUL - PowerPoint PPT Presentation

L O W E L L H I G H S C H O O L P R O J E C T J U N E 6 T H 2 0 17 City Council Presentation Lowell High School ON 2 ON 3 3 (EX FUL ULL R RENOV OVATION ON ADD/RENO OP O OPTION ADD/RENO OP O OPTION EXP) EW 4 -STO EW 5 -STO NEW STORY


  1. L O W E L L H I G H S C H O O L P R O J E C T J U N E 6 T H 2 0 17 City Council Presentation Lowell High School

  2. ON 2 ON 3 3 (EX FUL ULL R RENOV OVATION ON ADD/RENO OP O OPTION ADD/RENO OP O OPTION EXP) EW 4 -STO EW 5 -STO NEW STORY A AT T CAWLEY NEW STORY A AT T CAWLEY Building/S /Site • Acreage 6. 6.4 of 6.6 acres 6.0 of 6.6 acres 6. 7.4 = 6.0 of 6.6 acres +1.4 exp. lot 7. 23. 23.5 of 43.24 acres 23.5 of 43.24 acres 23. • Gross Size 650.1k gsf (614.3k reno +35.8k add) 650. 636.7k gsf (445.5k reno+191.2k add) 636. 632. 632.1k gsf (440.1k reno +192k add) 590. 590.3k gsf new construction 590.8k gsf new construction 590. • Stories/Ht Existing (63’), 1-3 Story (44’) Addtn’s Existing (63’), 1-5 Story (68’) Addtn’s 4-Story (58’) 5-Story (68’) Existing (63’), 1-5 Story (68’) Addtn’s Program A m Adjustme ments Program A m Adjustme ments Program A m Adjustme ments Program A m Adjustme ments Program A m Adjustme ments • • • • • New w Geotechnical I Investigations Geotechnical I Investigations Geotechnical I Investigations Geotechnical I Investigations Geotechnical I Investigations • • • • • Information Civil S Soils ls I Investigations Civil S Soils ls I Investigations Civil S Soils ls I Investigations Civil S Soils ls I Investigations Civil S Soils ls I Investigations • • • • • During T This Structural Investigations Structural I Investigations Geo-environmental I l Investigations Geo-environ onmental Structural Investigations • • • • • PSR Ph PS Phas ase Build lding Hazmat Investigations Build lding Hazmat Investigations Building H Hazmat I Investigations Traffic S Study Investigations • • • • Geo-environ onmental Investigations Geo-environmental I l Investigations Energy M Model Geo-environ onmental Investigations Traffic S Study • • • • • Traffic Study Traffic Study Traffic S Study Historic I Investigations Energy M Model • • • • • Energy Model Energy Model Energy M Model Endangered S Species Historic I Investigations • • • • • Hist Hi storic Investigations Historic I Investigations Investigations Endangered S Species Hist Hi storic Investigations • • • • Endangered Species Endangered Species Endangered S Species Investigations • • • Investigations Investigations Investigations Differences + + 8, 8,435 s 435 sf +12,602 +12, 602 s sf -6, 6,615 s 15 sf +18, +18,787 787 s sf N/A /A From PD PDP P to Foundations & s & Superst structure Foundations & s & Superst structure Foundations & s & Superst structure Foundations & s & Superst structure PS PSR MEP/F /FP MEP/F /FP Exterior C Closu sure a and Roofing Roofing Site Interior C Const struction a and Finishes Stairs s & Interior F Finishes Site Selective D Demo a and Site MEP/F /FP Ali lignment with O Option 2 2 Site PDP 2/ 2/2/ 2/17 17 PSR 6/ 6/1/ 1/17 17 PDP 2/ 2/2/ 2/17 17 PSR 6/ 6/1/ 1/17 17 PDP 2/ 2/2/ 2/17 17 PSR 6/ 6/1/ 1/17 17 PDP 2/ PD 2/2/ 2/17 17 PSR 6/ 6/1/ 1/17 17 PSR 6/ 6/1/ 1/17 17 Total P Project $331, $331,36 360,298 298 $343, $343,58 585,338 338 $344, $344,08 087,262 262 $343, $343,94 948,823 823 $334,33 $334, 335,971 971 $352, $352,55 559,455 455 $332,45 $332, 458,871 871 $339, $339,15 152,182 182 $336, $336,13 138,724 724 Budget City S Share $116, $116,47 472,533 533 $130, $130,02 022,882 882 $135,61 $135, 614,525 525 $135, $135,32 320,524 524 $126,41 $126, 417,978 978 $143, $143,23 232,657 657 $148, $148,34 341,142 142 $152, $152,16 160,821 821 $149, $149,43 439,672 672 OPTIONS COST SUMMARY Lowell High School

  3. Overview / Process The current phase of work within the MSBA program occurs in 3 major submission over a 18 month period Aug. Feb. June March 2016 2017 2017 2018 Current Timeline & Decisions Lowell High School

  4. Feasibility Study Schedule Lowell High School

  5. Organizational Planning Diagram Lowell High School

  6. 6.4 .4 of 6.6 acres 650. 650.1k gsf (614.3k reno +35.8k add) New 3 3 Story at 48’(63’ Existing) 725 725 per Survey (629 of Ayotte’s 1200) On Street + Use of City Transit Existing Down-Town Site(s) + Proxi oximity/Fr Frequency of of City Bu Buses + Proximity T To Ci City/Social S Services + Adjacent Pk Pkg Garages (C (Cove vered) ±Exi xisting S Service A Access R Remains ― Li Limited A Acce ccess T To Gr Green Space ce ― Busing g Req’d for S Some A Athle letics Meets Objectives Except as Noted: ― Fr Freshman Academy I Is Remot ote ±Public/Activity A Areas Spr pread & & Spl plit + F.A. A. T Teams + s + STEM EM/Hum. C Clust sters + Meets N New Standards ( (Cou ount/Size) Extent of Exist. Ext. Wall Upgrades -TBD ― Orientation I Is Proble lematic ― Windowless C ss Classr ssrooms/ s/Labs s Ex Exist st ― Hi Higher Ope Operating Costs (M (Multi-Bldgs gs) 5 Year (+ summer) Phased Project + Kitchen/Boiler B Built i in First st P Phase se ― Temporary G Gym F Facilities R Required ― Extensive M Modular Cla Classrooms $ 3 343, 3,585, 585,338 338 Total P Project B Budget $ 130, 0,022, 022,882 C 882 City Share Full Renovation Option Lowell High School

  7. Attic 3 rd floor 2 nd floor Basement Full Renovation Option – 1 st Floor Lowell High School

  8. CONSTRUCTION CONCEPT PHASE I 1yr (+3mo overlap) TEMP. GYM GEORGE AYOTTE GARAGE SITE FENCE FIELD HOUSE LORD BLDG. 1922 BLDG. FRESHMAN ACADEMY Full Renovation Option Lowell High School

  9. CONSTRUCTION CONCEPT PHASE II 1yr (+3mo overlap) 12 MODULAR CLASSROOMS GEORGE AYOTTE GARAGE CONSTRUCTION FENCE FIELD HOUSE LORD BLDG. 1922 BLDG. 20 MODULAR CLASSROOMS HALLWAYS OPEN AT 2 ND FLOOR FRESHMAN ACADEMY LOCATION (TBD) Full Renovation Option Lowell High School

  10. CONSTRUCTION CONCEPT PHASE III 1yr (+3mo overlap) 12 MODULAR CLASSROOMS GEORGE AYOTTE GARAGE CONSTRUCTION FENCE FIELD HOUSE LORD BLDG. 1922 BLDG. 20 MODULAR CLASSROOMS FRESHMAN ACADEMY LOCATION (TBD) Full Renovation Option Lowell High School

  11. CONSTRUCTION CONCEPT PHASE IV 1yr (+3mo overlap) 12 MODULAR CLASSROOMS GEORGE AYOTTE GARAGE NEW TWO-STORY BRIDGE FIELD HOUSE LORD BLDG. 1922 BLDG. 20 MODULAR CLASSROOMS FRESHMAN ACADEMY LOCATION (TBD) CONSTRUCTION FENCE Full Renovation Option Lowell High School

  12. CONSTRUCTION CONCEPT PHASE V 1yr (+3mo overlap) 12 MODULAR CLASSROOMS GEORGE AYOTTE GARAGE FIELD HOUSE LORD CONSTRUCTION FENCE BLDG. 1922 BLDG. 20 MODULAR CLASSROOMS FRESHMAN ACADEMY LOCATION (TBD) Full Renovation Option Lowell High School

  13. CONSTRUCTION CONCEPT COMPLETED TOTAL DURATION: 5 years + 3 months GEORGE AYOTTE GARAGE FIELD HOUSE LORD BLDG. 1922 BLDG. FRESHMAN ACADEMY Full Renovation Option Lowell High School

  14. 6.0 .0 of 6.6 acres 636. 636.7k gsf (445.5k reno+191.2k add) New 2-3-5-Story at 48-68’(63’ Existing) 725 725 per Survey (629 of Ayotte’s 1200) On Street + Use of City Transit Existing Down-Town Site + Proxi oximity/Fr Frequency of of City Bu Buses + Proximity T To Ci City/Social S Services + Adjacent Pk Pkg Garages (C (Cove vered) ±Exi xisting S Service A Access R Remains ― Li Limited A Acce ccess T To Gr Green Space ce ― Busing g Req’d for S Some A Athle letics Meets Objectives Except as Noted: + Fr Freshman Academy C Con onnected ±Public/Activity A Areas Spr pread & & Spl plit + F.A. A. T Teams + s + STEM EM/Hum. C Clust sters + Meets N New Standards ( (Cou ount/Size) + More Ef Efficient/Ef Effective F Field H House se Extent of Exist. Ext. Wall Upgrades -TBD ±Ex Existing I Is P Problematic/New FA FA Ideal ― Windowless C ss Classr ssrooms/ s/Labs s Ex Exist st ― Hi Higher Ope Operating Costs (M (Multi-Bldgs gs) 4 Year (+ summer) Phased Project + Kitchen/Boiler B Built i in First st P Phase se ― Temporary G Gym F Facilities R Required $ 343, 3,948, 948,823 T 823 Total P Project ct B Budget $135, 5,320, 320,524 C 524 City S Share Addition / Renovation Option 2 Lowell High School

  15. 5 th floor 4 th floor 3 nd floor 2 nd floor Basement Add / Reno Option 2 – 1 st Floor Lowell High School

  16. CONSTRUCTION CONCEPT PHASE I 2yrs (+3mo overlap) TEMP. GYM GEORGE AYOTTE GARAGE CONSTRUCTION FENCE FRESHMAN ACADEMY FIELD LORD BLDG. HOUSE 1922 BLDG. Addition / Renovation Option 2 Lowell High School

  17. CONSTRUCTION CONCEPT PHASE II 1yr (+3mo overlap) GEORGE AYOTTE GARAGE CONSTRUCTION FENCE FRESHMAN ACADEMY FIELD LORD BLDG. HOUSE 1922 BLDG. HALLWAYS OPEN AT 2 ND FLOOR Addition / Renovation Option 2 Lowell High School

  18. CONSTRUCTION CONCEPT PHASE III 1yr (+3mo overlap) GEORGE AYOTTE GARAGE FRESHMAN ACADEMY FIELD LORD BLDG. HOUSE 1922 BLDG. CONSTRUCTION FENCE Addition / Renovation Option 2 Lowell High School

  19. CONSTRUCTION CONCEPT COMPLETED TOTAL DURATION: 4 years + 3 months GEORGE AYOTTE GARAGE FRESHMAN ACADEMY FIELD LORD BLDG. HOUSE 1922 BLDG. Addition / Renovation Option 2 Lowell High School

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend