Cherokee Regional Trail
Current Trail Configuration
- Remove existing parking lot
- Replace with on-road parallel
parking
- Install traffic calming measures in
conjunction with trail crossing
- Bid Alternate to provide internal
trail connection to restrooms/drinking fountain
- Bid Alternate to provide trail
connection along Annapolis Street
- Future overlook connection to
Pickerel Lake
- Future trail enhancement to
develop entrance gateway/signage at Annapolis and Cherokee Boulevard
Trail Segment along Cherokee Boulevard
Annapolis Street Chippewa Avenue
(2007) (2007)
9 8 1 982 983 981
SCALE IN FEET NORTH 15' 30' 60'
Parks and Recreation 400 City Hall Annex 25 West 4th Street Saint Paul, MN 55102
PLAY AREA RESTROOM FACILITY
C H E R O K E E R E G I O N A L T R A I L
PROPOSED TRAIL ALIGNMENT
BASKETBALL COURT SERVICE ROUTE
SIDEWALK
SWING SET PICNIC SHELTER PICNIC SHELTER SWINGING BENCH
P R O P O S E D T R A I L A L I G N M E N T
PICNICKING AREA MATURE OAK TREES
PROPOSED BENCH PROPOSED BENCH
Tentative Schedule: Design Spring 2020 Bidding Summer 2020 Construction Fall 2020 (pending bids) Project Manager: Brett Hussong brett.hussong@ci.stpaul.mn.us Website: www.stpaul.gov/CherokeeTrailConnections Scope of Work: Construct an internal trail network to facilitate better connections between the regional trail and park features. Trail Features: Asphalt trail 8'-0" wide ADA accessible Site Furnishings Funding: Parks and Trail Legacy Funding $315,000 Design and Construction
OHIO STREET - TRAIL LIGHTING
PROJECT PLAN
FEBRUARY 2020 LEGEND PROPOSED LIGHT LOCATION TYPICAL TRAIL LIGHT
*
PROJECT LOCATION