I mage Credit: Suisman U r b an Design
Che rry and Bank Stre e t Co nc e pt De sign City Co unc il May - - PowerPoint PPT Presentation
Che rry and Bank Stre e t Co nc e pt De sign City Co unc il May - - PowerPoint PPT Presentation
I mage Credit: Suisman U r b an Design Che rry and Bank Stre e t Co nc e pt De sign City Co unc il May 21, 2018 Burlingto n, Vermo nt Who ar e we ? K irste n Me rrima n Sha piro L a ura Whe e lo c k (City Pro je c t Manage rs) Gre
Who ar e we ?
K irste n Me rrima n Sha piro L a ura Whe e lo c k
(City Pro je c t Manage rs)
Gre g Go ye tte Gre g E dwa rds
(S tre e t De sign and E ngine e ring)
I ma g e s a nd p ho to s c o nta ine d he re in a re so urc e d fro m Sta nte c o r City o f Burling to n Do wnto wn Stre e t De sig n a nd Co nstruc tio n Sta nd a rd s unle ss o the rwise no te d
Why ar e we he r e ?
- Pre se nte d a b a se de sig n fo r
imp ro ve me nts
Ba se de sig n fro m “City of Burlingto n
Do wnto wn S tre e t De sig n and Co nstruc tio n S tandards”
- Ga the re d fo c use d c o mmunity
fe e db a c k
- Co nside re d pub lic c o mme nts
a nd upda te d c o nc e pt
- No w se e king e ndo rse me nt
- De ve lo p e d we b pa g e a nd c o mme nt func tio n
- E
ma il to lists fo r Gre a t Stre e ts a nd Ma ll Re de ve lo pme nt, F ro nt Po rc h F
- rum, so c ia l
me dia , o utre a c h to p ro pe rty o wne rs a nd b usine sse s, ha ndo uts with b a sic info fo r we b pag e a t mo st NPAs inc luding a ll Wa rds Ste e ring Co mmitte e me e ting , a nd Ne ig hbo rho o d Buzz
Pr e vious Public me e tings:
- Ma y 16, 2018 - Pub lic Wo rks Co mmissio n Pre se nta tio n, a ppro va l & re c o mme nda tio n
- Ma y 16, 2018 - T
ra nspo rta tio n, E ne rg y a nd Utilitie s Co mmitte e , a ppro va l & re c o mme nda tio n to City Co unc il o f c o nc e ptua l de sig n
- Ma y 1, 2018 - T
ra nspo rta tio n, E ne rg y a nd Utilitie s Co mmitte e , pre se nta tio n & pub lic c o mme nts
- April 18, 2018 - Pub lic Wo rks Co mmissio n Pre se nta tio n & pub lic c o mme nts
- April 11, 2018 - Pub lic Me e ting o n Ba nk a nd Che rry Stre e t De sig n Co nc e pts
- April 10, 2018 - Pub lic Me e ting o n Ba nk a nd Che rry Stre e t De sig n Co nc e pts
- Ma rc h 27, 2018 - Intro duc tio n o f the b a se Ba nk a nd Che rry Stre e t de sig n c o nc e pts to
the T ra nspo rta tio n, E ne rg y a nd Utilitie s Co mmitte e
F utur e Public me e tings:
- Ma y 21, 2018 - City Co unc il, pre se nta tio n a nd a p pro va l
How have we e ngage d?
Base De sign
Base de sig n fro m “City o f Burlingto n Do wnto wn S tre e t De sign and Co nstruc tio n S tandards”
Community Input
Gathe r fo c use d c o mmunity fe e d bac k fo r stre e t a me nitie s to b e la ye re d o n to p o f base de sig n
Conc e pt De sign Re fine me nt
City Staff and De sig n Co nsultants will b ala nc e de sig n b a se d the fe e d bac k and City g o als
City Counc il Appr
- val
Ma y 21, 2018
F ina l De sig n, E ngine e r ing a nd Pe rmitting
2019
Constr uc tion
2019/ 2020
What is the pr
- c e ss?
Upc oming Me e ting:
- Ma y 21, 2018 - City Co unc il Pre se nta tio n a nd Appro va l
Ne xt Ste ps:
- June 29th - Co mple te Co nc e ptua l De sig n Pla ns
- 2019 - Co mple te F
ina l E ng ine e ring & Pe rmitting
- 2019/ 2020 - Co nstruc tio n
What has be e n c omple te d to date ?
- Re vie we d Do wnto wn Stre e t De sig n a nd Co nstruc tio n
Sta nda rds
- De ve lo pe d a b a se de sig n
- Be g a n c o o rdina tio n with CityPla c e Burling to n de ve lo pme nt
- E
xisting pa rking inve nto ry
- So lic ite d pub lic input a nd upda te d b a se de sig n
Pho to so urc e : City o f Burling to n Do wnto wn Stre e t De sig n a nd Co nstruc tio n Sta nd a rd s
CPB
Whe r e ar e impr
- ve me nts pr
- pose d?
Ma p so urc e : City o f Burling to n Do wnto wn Stre e t De sig n a nd Co nstruc tio n Sta nd a rd s
L e g e nd
Pro je c t a r e a De sig n a nd c o nstruc tio n o f St. Pa ul a nd Pine Stre e t b e twe e n Ba nk a nd Che rry is b e ing c o mple te d b y CityPla c e Burling to n (CPB)
Ne w Str e e t Se gme nts by CityPlac e Bur lington
T he City ha s be e n c o o rd ina ting with the CityPla c e Burling to n De sig n te a m to e nsure tha t the de sig n o f the se two ne w str e e t se g me nts b e twe e n Ba nk a nd Che rr y Stre e t: Pine a nd St. Pa ul a re b a se d o n the ne wly a do pte d City o f Bur
lingto n Do wnto wn S tre e t De sign and Co nstruc tio n S
- tandards. T
he c urre nt de sig ns be lo w do no t sho w the de sig n a lig nme nt mo d ific a tio ns fo r the Pine & Che r ry Stre e t a nd Ba nk & St. Pa ul Stre e t inte rse c tio ns a s the De ve lo pe r is a wa iting the fina l a ppro va l o f the c o nc e ptua l de sig n fo r Ba nk a nd Che rry Stre e ts b y the City Co unc il.
Che r r y St. Che r r y St. Bank St. Bank St.
Che rry Stre e t Ba nk Stre e t
Stre e t U se rs: Pa rking , De live rie s, Ca r s, T ruc ks, Bike s, Pe d e stria ns
Base De sign
Use s the pe de stria n a nd ro a dwa y zo ne dime nsio ns fro m the Gre a t Stre e t Standa rds
What did we he ar ?
Ge ne ra l the me s:
- E
nc o ura g e slo w spe e ds a nd re info rc e stre e t is fo r pe de stria ns
- Cre a te a b a la nc e o f pe de stria n,
b ic yc le s, parking a nd ve hic le s a s a ll c o mpe te fo r the limite d spa c e
- Pro vide a b ike frie ndly stre e t a nd
c o nside r a de dic ate d bic yc le fac ility
- Optio n # 2 fo r the inte rse c tio n de sig n
- f Ba nk and St. Paul Stre e ts was
unive rsally pre fe rre d
- Dua l use o f lo ading zo ne are a s
- On stre e t pa rking is still impo rta nt to
ma ny o f the b usine sse s and pro pe rty
- wne rs
- DPW Co mmissio n sug g e ste d City
Co unc il c o nside r a n o n stre e t b ike la ne o n Che rry Stre e t fro m Ba tte ry to Pine
What did we r e vise ?
Bank Str e e t to be c ur ble ss
- Stre e t is a t side walk g ra de a nd inc lude s te xture d c ro sswa lks a nd
pa rking a re a pa ve rs
- De fine s sha re d spac e with te xture s, pa ve rs, b o llards, pla nte rs, lig hting ,
planting s, e tc .
What did we r e vise ?
Bank Str e e t to be c ur ble ss
- Re info rc e s pe de stria n prio rity o pe ra tio n
- Pro vide s fle xib ility fo r future
- Allo ws fo r te mpo ra ry stre e t c lo sure s fo r e ve nts
What did we r e vise ?
Impr
- ve e xisting path linkage : Batte r
y to Chur c h
- Pro vide s a n a lte rnative e a st-we st
c o nne c tio n fo r b ic yc le s/ pe de stria ns
- Use s e xisting pa th ne xt to Hilto n –
Ba tte ry to Pine
- Use s lo w spe e d, lo w vo lume Ba nk St.
- Pine to Churc h
Pr e fe r r e d St. Paul & Bank Str e e t Alignme nt
Be ne fits:
- Inte rse c tio n a lig nme nt mo re
pre dic ta ble fo r a ll use rs
- Ac c o mmo da te s b us
mo ve me nts
- E
liminate s drive wa y within inte rse c tio n
- Pro vide s o ppo rtunity fo r
pub lic pla c e making a t no rthwe st c o rne r
- Impro ve d a c c e ss fo r
e me rg e nc y ve hic le s
What did we r e vise ?
Stormwate r T re atme nt on Curble ss Stre e ts
- Bio swa le s in g re e nb e lt c o lle c t a nd filte r runo ff
fro m ro a dwa y a nd side walk
- Pe rme a b le pa ve rs a llo w runo ff fro m ro a d wa y
to so a k into und e rlying so ils
- Pe rme a b le pa ve rs re duc e c o nc e ntra tio n o f
runo ff
- T
r e e s a nd pla nting s a re wa te re d
- Runo ff a nd ra infa ll is filte re d
What did we r e vise ?
Che r r y Str e e t to be slow str e e t
- Pro vide s te xture d and ta ble d inte rse c tio n a t Pine Stre e t a nd mid b lo c k
ra ise d c ro sswa lk ne a r Ho te l Ve rmo nt
- Ma inta ins na rro w la ne s a nd o n-stre e t pa rking to pro vide fric tio n, slo w
ve hic le s a nd se pa ra te pe de stria n spa c e
What did we r e vise ?
Che r r y Str e e t to be slow str e e t
- Pro vide s g e ne ro us pe de stria n/ b uffe r spa c e
What did we r e vise ?
Be tte r de fine d spac e for bic yc le s
- Co nside re d b ut did no t a dd de dic a te d b ike lane s a nd c yc le tra c ks
- Adde d ‘ Supe r Sha rro ws” with da sh line s
- Pro vide s the fe e l o f a bike la ne whe n the re is no t e no ug h spa c e
T his tr e atme nt will be use d on both Ba nk a nd Che r r y Str e e ts
On Str e e t Pa r king Spac e Counts
Str e e t E xisting po st CPB Pr
- pose d
Bank (Pine to Churc h)
Ve hic le Spa c e s* 33 40 Ac c e ssib le Spa c e s** 1 1 Bus Spa c e s
Che rr y (Batte r y to St. Paul)
Ve hic le Spa c e s* 70 66 Ac c e ssib le Spa c e s 4 4 Bus Spa c e s*** 3 2
*Ve hic le spac e c o unts inc lude share d ve hic le / lo a ding zo ne spac e s and hig h-turno ve r spac e s. E xac t numb e r a nd lo c atio n o f pro po se d sha re d and hig h-turno ve r spac e s to b e de te rmine d in la te r stag e s o f de sig n. **Pa rking spac e s o n Ba nk Stre e t will b e a c c e ssib le with c urble ss stre e t. ***Gre e n Mo untain T ransit ha s re q ue ste d two b us spac e s o n Che rry Stre e t.
By the Numbe r s – Car Par king
Trees Removed for street reconstruction
- Cherry S
treet: 25 trees - Parks to relocate 2 small healthy maples to alternate site in city
- Bank S
treet: 19 trees - Parks to relocate 1 small healthy tree to alternate site in city
New Street Trees planted with street reconstruction*
- Cherry S
treet: 34 new trees
- Bank S
treet: 32 new trees
There are specific areas in the plans particularly on the south side of Cherry S treet that are proposing to use planting or planters to add to the greening of the street and where the solar access makes it a better location for these types of amenities versus trees. The intent of the design will be to provide a healthy, mature canopy for the roadway which will help with traffic calming, stormwater treatment, aesthetics, and pedestrian comfort level. These new trees will be planted in a much healthier environment than the current environment for the existing trees by using soil cells and appropriate soil volumes. In addition, species for the new trees have been recommended by the City arborist with careful consideration of cold-hardiness, salt tolerance, and their ability to thrive in an urban environment.
* the number for trees is a goal, but may need to be modified as plans are developed from concept to construction documents
By the Numbe r s - T r e e s
Numbe r
- f bike par
king spa c e s shown in the ame nity/ tr e e be lt zone s
- Cherry S
treet: 47 b ike hitc he s
- Bank S
treet: 23 b ike hitc he s
By the Numbe r s – Bike Par king
There are other potential opportunities to add additional Bike Parking in the future using bike corrals to meet changing needs in terms of locations or volume of need.
* the number and final locations for bike parking is a goal, but may need to be modified as plans are developed from concept to construction documents
Cherry S treet: T
- tal of 2 Un-curated Bulletin Boards
Bank S treet: T
- tal of 2 Un-curated Bulletin Boards
There are other potential opportunities to add curated bulletin boards in the future should the City decide this type of additional information is needed.
* the final locations for un-curated bulletin boards may need to be modified as plans are developed from concept to construction documents
By the Numbe r s – Bulle tin Boar ds
Base De sign
Base de sig n fro m “City o f Burlingto n Do wnto wn S tre e t De sign and Co nstruc tio n S tandards”
Community Input
Gathe r fo c use d c o mmunity fe e d bac k fo r stre e t a me nitie s to b e la ye re d o n to p o f base de sig n
Conc e pt De sign Re fine me nt
City Staff and De sig n Co nsultants will b ala nc e de sig n b a se d the fe e d bac k and City g o als
City Counc il Appr
- val
Ma y 21, 2018
F ina l De sig n, E ngine e r ing a nd Pe rmitting
2019
Constr uc tion
2019/ 2020
What is the pr
- c e ss?
T he c o nc e ptua l de sig ns c a n b e vie we d a t http s:/ / www.b urling to nvt.g o v/ C E DO/ BT V-Ma ll-Re de ve lo p me nt-Pro c e ss/ Ba nk-Che rry-Stre e ts