Capabilities Overview Location: Date: November , 2016 CADS Version - - PowerPoint PPT Presentation

capabilities overview
SMART_READER_LITE
LIVE PREVIEW

Capabilities Overview Location: Date: November , 2016 CADS Version - - PowerPoint PPT Presentation

Capabilities Overview Location: Date: November , 2016 CADS Version 1.0 Overview Opened in early 2014 by Sulphur native, David Stutes Work within the Upstream, Midstream, and Downstream markets An element of our vision is to


slide-1
SLIDE 1

Capabilities Overview

Location: –Date: November , 2016

slide-2
SLIDE 2
slide-3
SLIDE 3

CADS Version 1.0

slide-4
SLIDE 4

Overview

  • Opened in early 2014 by Sulphur native, David Stutes
  • Work within the Upstream, Midstream, and Downstream markets
  • An element of our vision is to sustain a ‘best-in-class’ work

environment were our employees can count on a safe work place and fulfilling source of income.

  • We consciously support our community through engagement with
  • ur local leadership and our employees
  • The foundation of our culture is based on sound principles of

‘keeping our people safe’ and ethical consideration in all we do.

  • Before we start a project, we identify risk, create a fit-for-purpose

strategy, and identify those that will to be held accountable.

  • We execute our strategy in a manner that best represents our

client’s interest.

slide-5
SLIDE 5

Services Provided

  • Shop Fabrication
  • ‘R’ and ‘U’ Stamps
  • Site Construction Services
  • Craft Supervision and Craft Labor
  • Procurement Support
  • Coatings
  • Professional Services
  • Pipeline
  • Roustabout
  • Inspection services
  • ILI
slide-6
SLIDE 6

CADS Version 1.0

LABOR OFFERED

 CODE WELDERS  FITTERS  OPERATORS  LABORS  HELPERS  CONCRETE  PIPELINE WELDERS  STRUCTURAL WELDERS  TRUCK DRIVERS  CONSTRUCTION MANAGERS  PROJECT MANAGERS  SCHEDULERS  DRAFTSMEN  OFFICE PERSONEL  INSPECTORS  510  570  653  CWI  COATING NACE  ILI  PIPELINE AND FACILITIES.

slide-7
SLIDE 7

Notes

  • 2015 Effort Hours:

35,000

  • 2016 Effort Hours:

45,000

  • 2017 Proj. Effort Hours:

90,000

  • 140 Request and fulfilled 120
  • Safety Information:
  • EMR – 1.0
  • Effective - .8 or <
  • Health Management Alignment:
  • Business Health Partners

6810 West Yellowstone Rd. Mills, Wyoming 82604 307.267.7975 609 Landry Ln Sulphur, Louisiana 70663 337.888.4804

Office Locations:

slide-8
SLIDE 8

Shop Fabrication

Shop Characteristics:

  • 180’ x 152’
  • 20,000 SF fabrication area
  • 360 Ton loadout capability (cranes, dollies, sliders)
  • 12 automatic welders

Shop Scope:

  • Structural Steel
  • Piping (Alloy & CS)
  • Coded Vessels
  • Skid fabrication and assembly

Production (combination CS/Alloy):

  • Avg of 6” pipe spools
  • 5-10’s; 200 spools / week
  • 7-24’s; 500 spools / week
  • 3 – 6” pipe spools per welder / Station
  • 12 production stations (Min.)
  • NOTE: Quantity will fluctuate based on the

diameter of the pipe Coatings:

  • Ample space to accommodate sandblasting and

painting

  • NACE Level III oversight
slide-9
SLIDE 9

Certified Pressure Vessel Fabrication

CADS Construction has acquired the following certifications:

  • “R” Stamp - Field modification(s) of existing coded equipment - NBR
  • “U” Stamp -

New coded vessel fabrication - ASME

slide-10
SLIDE 10

Site Construction Services

  • Capital Construction Execution and Support
  • Maintenance and T/A Execution and Support
  • Disciplines:
  • Civil
  • Structural
  • Equipment Setting
  • Mechanical
  • Insulation
  • Painting

Estimating Process Pre Project Analysis *Risk Register Included P.E.P. *Responsibility Metric Project Closeout

Functional support provided by H.O., Procurement, Payroll, Safety, Quality, and Project Controls

slide-11
SLIDE 11

Supporting Role

Craft Supervision and Craft Labor:

  • We provide highly qualified craft supervision

and labor to assist clients in managing and executing critical activities to support project

  • bjectives
  • We believe that our network in many markets

(industry and geographic) provides us with a competitive advantage during the stressful periods where Supply of qualified resources is less than the Demand of qualified resources. Generally, productivity is the most critical component of project success and we can help minimize the labor risk on your projects. Where CADS can help Procurement Support:

  • Job site supplies and materials
  • Logistical Support (local, state, national)

Currently approved to supply SASOL LCCP with welders

5 10 15 20 25 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Supply vs Demand Curve

Demand Supply

slide-12
SLIDE 12

Roustabout and Pipeline

Roustabout

  • Equipment Setting
  • Equipment Refurbish
  • Well site Fabrication
  • Well site installation

Pipeline

  • Right of way preparation
  • Excavation / Boring
  • Prefabrication
  • Pipe String / Installation
  • Testing
  • Site restoration
slide-13
SLIDE 13

Our Mission

Our mission is to sustain a best-in-class workplace where all stakeholders share in the benefits of our Safety, Quality*, and cost-effective approach. CADS shall incorporate ethical decision making in all aspects of our organization to sustain trust within the communities in which we work.

* Quality covers CADS workflows and process in Governance, Administrative, and Technical.

slide-14
SLIDE 14

Why CADS?

CADS Construction maintains a healthy ratio of seasoned journeyman supervision, craft people and inspection staff within our labor pool. Therefore, we can minimize the risk to safety, quality, cost, and schedule on project and shop activities.

5 10 15 20 25 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Supply vs Demand Curve

Demand Supply