EUROPEAN PLASMA RESEARCH ACCELERATOR WITH EXCELLENCE IN APPLICATIONS
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 653782.
Calendar Management towards APPLICATIONS CDR Completion Maria - - PowerPoint PPT Presentation
EUROPEAN PLASMA RESEARCH ACCELERATOR WITH EXCELLENCE IN Calendar Management towards APPLICATIONS CDR Completion Maria Weikum 10 th Steering Committee Meeting 11.06.2018 This project has received funding from the European Unions Horizon
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 653782.
Horizon 2020
2
4.7.2018 9:00 – 5.7.2018 18:00 3rd Collaboration Week (+ Special Steering Meeting) Liverpool, UK fix tbc 6.7.2018 LIVERPOOL Symposium Liverpool, UK fix 13.9.2018 9:00 – 12:00 11th Steering Meeting DESY/remote tbc 19.11.2018 14:00 – 22.11.2018 18:00 3rd Annual Meeting 3rd Collaboration Board Meeting SAC 4th Collaboration Week INFN Frascati, Italy fix 14.12.2018 9:00 – 12:00 12th Steering Meeting DESY/remote tbd
Horizon 2020
3
25.2.2019 14:00 - 1.3.2019 14:00 5th Collaboration Week German Alps fix 25.2.2019 13:30-15:30 13th Steering Meeting DESY/remote tbc 19.6.2019 9:00 – 12:00 14th Steering Meeting DESY/remote tbc 2.9.2019 12:00 – 6.9.2019 14:00 6th Collaboration Week 4th Annual Meeting 4th Collaboration Board Meeting DESY, Germany tbd 2.9.2019 9:00-12:00 15th Steering Meeting DESY/remote tbc 29.10.2019 9:00 - 31.10.2019 16:00 Final meeting DESY, Germany tbd
Horizon 2020
4
M 1.2 Report: Outline CDR & Contributions Defined 30.06.2018 ESFRI Roadmap Application – first draft 31.12.2018 Input to pre-construction R&D activities received 31.12.2018 Input to site studies received 31.01.2019 CDR contributions – first draft Jan 2019 5th Collaboration Week (Retreat in the Alps) 25.02. – 01.03.2019 M 1.3 Report: Draft Contributions for the CDR Received 30.04.2019 First revision of CDR draft version mid-May to mid-July 2019 Second revision of CDR draft version mid-July to end-August 2019 Final CDR draft 30.09.2019 D 1.7 Report: Final Design Report 30.10.2019
Horizon 2020
5
M 1.2 Report: Outline CDR & Contributions Defined 30.06.2018 ESFRI Roadmap Application – first draft 31.12.2018 Input to pre-construction R&D activities received 31.12.2018 Input to site studies received 31.01.2019 CDR contributions – first draft Jan 2019 5th Collaboration Week (Retreat in the Alps) 25.02. – 01.03.2019 M 1.3 Report: Draft Contributions for the CDR Received 30.04.2019 First revision of CDR draft version mid-May to mid-July 2019 Second revision of CDR draft version mid-July to end-August 2019 Final CDR draft 30.09.2019 D 1.7 Report: Final Design Report 30.10.2019
Horizon 2020
6
M 1.2 Report: Outline CDR & Contributions Defined 30.06.2018 ESFRI Roadmap Application – first draft 31.12.2018 Input to pre-construction R&D activities received 31.12.2018 Input to site studies received 31.01.2019 CDR contributions – first draft Jan 2019 5th Collaboration Week (Retreat in the Alps) 25.02. – 01.03.2019 M 1.3 Report: Draft Contributions for the CDR Received 30.04.2019 First revision of CDR draft version mid-May to mid-July 2019 Second revision of CDR draft version mid-July to end-August 2019 Final CDR draft 30.09.2019 D 1.7 Report: Final Design Report 30.10.2019
Horizon 2020
7
M 1.2 Report: Outline CDR & Contributions Defined 30.06.2018 ESFRI Roadmap Application – first draft 31.12.2018 Input to pre-construction R&D activities received 31.12.2018 Input to site studies received 31.01.2019 CDR contributions – first draft Jan 2019 5th Collaboration Week (Retreat in the Alps) 25.02. – 01.03.2019 M 1.3 Report: Draft Contributions for the CDR Received 30.04.2019 First revision of CDR draft version mid-May to mid-July 2019 Second revision of CDR draft version mid-July to end-August 2019 Final CDR draft 30.09.2019 D 1.7 Report: Final Design Report 30.10.2019
Horizon 2020
8
M 1.2 Report: Outline CDR & Contributions Defined 30.06.2018 ESFRI Roadmap Application – first draft 31.12.2018 Input to pre-construction R&D activities received 31.12.2018 Input to site studies received 31.01.2019 CDR contributions – first draft Jan 2019 5th Collaboration Week (Retreat in the Alps) 25.02. – 01.03.2019 M 1.3 Report: Draft Contributions for the CDR Received 30.04.2019 First revision of CDR draft version mid-May to mid-July 2019 Second revision of CDR draft version mid-July to end-August 2019 Final CDR draft 30.09.2019 D 1.7 Report: Final Design Report 30.10.2019
Horizon 2020
9
CDR Chapter Titles Editorial Team Responsible for Chapter Output Main WPs Involved
1 List of Authors & Contributors P.A. Walker, M. Weikum /
2 Executive Summary
/ 3 Introduction
WP1 4 Scientific Case Study_____________________________________________________________________________________________________________________________________________________________
4.1 Flagship Science Goals
WP1 4.2 Need for External Users M.-E. Couprie, A. Specka, P. A. Walker, M. Weikum WP6, WP7, WP1, WP4 4.3 User Access M.-E. Couprie, A. Specka, P. A. Walker, M. Weikum WP6, WP7, WP1 4.4 Added Value for European Research and Technology Landscape
WP1 4.5 Scientific Background
WP1, WP8
5 EuPRAXIA Conceptual Design__________________________________________________________________________________________________________________________________________________
5.1 Performance Goals
WP1 5.2 Overall Facility Layout and Major Parts
WP1 5.3 Laser Technology
WP4 5.4 RF Technology
WP5, WP9 5.5 Electron Injector
WP2, WP3, WP5, WP14 5.6 Electron Accelerator to 1 GeV
WP2, WP3, WP5, WP14 5.7 Electron Accelerator to 5 GeV
WP2, WP3, WP5, WP14 5.8 Beam Transport and Handling Systems for the 1 GeV Beam
WP5 5.9 Beam Transport and Handling Systems for the 5 GeV Beam
WP5 5.10 Beam Diagnostics and Electron-Based Feedbacks
WP5 5.11 Beam Distribution Concept M.-E. Couprie, G. Dattoli, F. Nguyen, A. Specka, P. A. Walker, M. Weikum WP6, WP7 5.12 FEL and Photon Science Facility M.-E. Couprie, G. Dattoli, F. Nguyen, P. A. Walker, M. Weikum WP6, WP11 5.13 HOPA Science Facility
WP7 5.14 EuPRAXIA operational model
WP1 5.15 Environmental impact
WP1 5.16 Safety aspects
WP1, WP4 5.17 Project Risk Assessment
WP1 5.18 Tables of Parameters and Technical Data
/ 5.19 Impact assessment
WP1
Horizon 2020
10
6 EuPRAXIA Pre-Construction R&D and Technical Design Phase_________________________________________________________________________________________________________________
6.1 List of Required R&D and Protoyping
WP12, WP1, WP4 6.2 Use of EuPRAXIA Consortium Facilities
all
7 Project organization and implementation_______________________________________________________________________________________________________________________________________
7.1 Structure and governing model
WP1 7.2 Project schedule
WP1 7.3 User Support
WP1 7.4 Safety organization
WP1 7.5 Quality assurance
WP1 7.6 Proposed financial model
WP1 7.7 Outreach and communication
WP8, WP1
8 Resource plan / Financial plan____________________________________________________________________________________________________________________________________________________
8.1 EuPRAXIA Technical Design and Pre-Construction
WP1 8.2 EuPRAXIA Construction and Operation
WP1
9 Cost-Benefit Analysis
WP1 10 Site studies ___________________________________________________________________________________________________________________________________________________________________________
10.1 Introduction and common assumptions
WP1 10.2 Site A: CILEX (prelim.)
10.3 Site B: CLF (prelim.)
10.4 Site C: DESY (prelim.)
10.5 Site D: ELI-Beamlines (prelim.)
10.6 Site E: SPARCLAB (prelim.)
11 Additional information and statements from reviews _________________________________________________________________________________________________________________________
11.1 Outreach and public response
WP8 11.2 Review 1
WP8, WP1 11.3 Review 2
WP8, WP1
Horizon 2020
11
12 Expressions of Commitment
WP1 13 Expressions of Political Support
WP1 14 References
/ 15 List of Institutes and Principal Investigators
/ 16 Appendix I: Publications & Conference Contributions
WP8 17 Appendix II: Press Articles
WP8 18 Appendix III: Letters of Support from Peers
WP8, WP1 19 Appendix IV: Letters of Support from Industry
WP8, WP1 20 Appendix V: Working Package Results ___________________________________________________________________________________________________________________________________
20.1 Physics and Simulations
WP2 (+WP3-5) 20.2 High Gradient Plasma Accelerator Structure
WP3 20.3 Laser Design and Optimization
WP4 20.4 Electron Beam Design and Optimization
WP5 20.5 FEL Pilot Application M.-E. Couprie, G. Dattoli WP6 20.6 High Energy Physics and Other Pilot Applications
WP7 20.7 Alternative Electron Beam Driven Plasma Accelerator Structure
WP9 20.8 Use of Other Novel technologies
WP10 20.9 FEL Application prototyping
WP11 20.10 Accelerator Prototyping and Experiments at Test Facilities
WP12 20.11 Alternative Radiation Generation
WP13 20.12 Hybrid Laser Electron Beam Driven Acceleration
WP14
Horizon 2020
12
Sign up for Sharepoint with Sandy Welsch, if you have not done so yet
Horizon 2020
13