BURTON STATION STRATEGIC GROWTH AREA PLAN UPDATE CITY COUNCIL BRIEFING MAY 01, 2018
1
Ma rk E . She a , Compre he nsive Pla nning Coordina tor
BURTON STATION STRATEGIC GROWTH AREA PLAN UPDATE CITY COUNCIL - - PowerPoint PPT Presentation
BURTON STATION STRATEGIC GROWTH AREA PLAN UPDATE CITY COUNCIL BRIEFING MAY 01, 2018 Ma rk E . She a , Compre he nsive Pla nning Coordina tor 1 ORDER OF PRESENTATION Burto n Sta tio n Stra te g ic Gro wth Are a Pla n (SGA) a c tio ns to
1
Ma rk E . She a , Compre he nsive Pla nning Coordina tor
2
da te
nitia l b rie fing s he ld with City Co unc il o n No v. 28, 2017 a nd Pla nning Co mmissio n Ja n. 10, 2018.
irst pub lic me e ting wa s he ld Ja n. 25, 2018. F
future la nd use fo r Burto n Sta tio n Villa g e .
a nd J Ga rde ns Civic L e a g ue o n F e b . 22, 2018.
(HRACRE ) o n Ma rc h 7, 2018.
irst ste e ring c o mmitte e me e ting o n April 16, 2018.
hird pub lic me e ting he ld o n April, 19, 2018.
3
4
3 Alte rna tive s Pre se nte d fo r Burto n Sta tio n Villa g e :
Optio n 3 – Pre do mina te ly Hig h De nsity Co mme rc ia l Optio n 1 – Pre do mina te ly L
De nsity Re side ntia l Optio n 2 - Pre do mina te ly Hig h De nsity Re side ntia l
5
Sta ke ho lde rs Cho se Optio n 1: L
Re side ntia l
31 e xisting ho me s 38 ne w sing le fa mily
ho me s
Co rne r sho p Se nio r L
iving F a c ility
Co mmunity Ce nte r Me mo ria l Pa rk Re lo c a te Go lf Co urse T
runc a te Burto n Sta tio n Rd, a dd lo o p ro a d
6
hing s ha ve c ha ng e d – T ime fo r Pla n Upda te
De ve lo pe d
c ha ng e d (We sle ya n
Outle t Blvd, Burto n Sta tio n Rd will no w ne e d to re ma in o pe n to Mille r Sto re Rd)
Pro je c t Appro ve d
zo ne d the ir pro pe rty to I
7
8
8
9
Burton Sta tion Roa d
No rtha mpto n Blvd to T im Rd
T
300‘ we st o f Burto n Sta tio n Ro a d to RR
$15 millio n
a wa rde d Ja nua ry 2018
April 2018
c o mple tio n Summe r 2019
10
11
BS L a ke Outfa ll Improve me nts
S c o pe : Piping a nd
c o nc re te flume fro m la ke to Dia mo nd Spring s Ro a d
Co st Partic ipatio n Agre e me nt: City
de sig n a nd a c q uire pro pe rty; De ve lo pe r to Co nstruc t
$1.5 millio n
Sub sta ntia lly Co mple te
Summe r 2018
Co mple tio n e a rly 2019
12
pro je c te d de ve lo pme nt
Sa nita ry Se we r Pump Sta tion
13
14
T
Proje c t Sc he dule / Cost
De sig n: Ma y 2017 – Jun 2018 Co nstruc tio n: Ja n. 2019 – April 2020 T
P F unding $7,810,000
Proje c t Summa ry
e e t
ng ine Co mpa ny
a dde r Co mpa ny
e c hnic a l Re sc ue Ca pa b ilitie s
MS Adva nc e d L ife Suppo rt Unit
nc ide nt Suppo rt Unit
T
xte nsion
E xte nsio n o f T
Air Ra il Ave nue a nd I mpro ve me nts a lo ng Air Ra il Ave nue to T hursto n Ave nue
g utte r, side wa lks, se we r, wa te r, sto rm wa te r, L E D stre e t lig hts a nd re lo c a te s a n e xisting pump sta tio n
15
Burton Sta tion E xte nsion
xte nds Burto n Sta tio n Ro a d impro ve me nts fro m T im Ro a d to Mille r Sto re Ro a d
16
17
8 18
19
20
Proposed Plan is for Mixed Use Existing Plan is for Single Family
21
l height to be three to five stories insula Town Center development) Building Heights to be 3-5 stories (Peninsula Town Center)
Multi-Use De ve lo pme nt (Ho rizo nta l) in Yo rk Co unty
22
ne two rks a nd c e ntra l g a the ring pla c e s. A ke y de sig n fe a ture is to e nsure tha t the e ntire de ve lo pme nt is wa lka b le
23
A g re e nwa y/ pa rk syste m sho uld b e de ve lo pe d to re pla c e the fo rme r e xisting a nd pla nne d g o lf c o urse . T his syste m will se rve to pro vide b uffe rs, c o nne c tio ns b e twe e n la nd use s, a nd a e sthe tic e nha nc e me nt
OPE N SPACE DE VE L OPME NT ST RAT E GIE S:
nc o rpo ra te c e ntra lize d o pe n spa c e with mixe d-use de ve lo pme nt
ma na g e me nt fa c ilitie s with pa rks a nd re c re a tio n c o mpo ne nt
fo r re c re a tio n a nd pe de stria n a nd b ike wa y c o nne c tivity thro ug ho ut site a nd to o the r de stina tio ns
24
T OWN GRE E N:
g a the ring spa c e in a mixe d-use c e nte r o r villa g e
25
URBAN PL AZA:
mixe d-use se tting
26
E CO- GARDE N AND L AKE T RAIL S:
ma na g e me nt
27
T RAIL NE T WORK:
re c re a tio n, c re a te s c o nne c tio ns, a nd e sta b lishe s a g re e nwa y fra me wo rk thro ug ho ut the a re a
28
Co nne c t ne w g re e nwa y to L a ke Wrig ht T ra il
xisting c ro sswa lk
29
Ne a re st City pa rk with b ro a d ra ng e o f a me nitie s
ra ils
ishing
30
c ha ng e s o n Ma y 1, 2018
me e ting to b e sc he dule d in Ma y, 2018
Do c ume nt a nd b rie f Pla nning Co mmissio n o n Ma y 9, 2018
He a ring o n June 13, 2018
e nta tive City Co unc il Pub lic He a ring July 10, 2018
31
32
2018 SGA Pla n Pe nding re zoning a pplic ation sc he dule d for Ma y Pla nning Commission
33