1 1
Basin Plan Amendment Basin Plan Amendment for for Onsite - - PowerPoint PPT Presentation
Basin Plan Amendment Basin Plan Amendment for for Onsite - - PowerPoint PPT Presentation
Basin Plan Amendment Basin Plan Amendment for for Onsite Implementation Program Onsite Implementation Program (plan for regulating onsite systems) (plan for regulating onsite systems) May 5, 2011 May 5, 2011 Sorrel Marks Sorrel Marks
2 2
Groundwater
Leachfield Septic Tank
Proper Septic System Function
3 3
Water Code Requirements Water Code Requirements
- Water Code requires authorization for discharge
Water Code requires authorization for discharge
- Onsite system => discharge waste
Onsite system => discharge waste
- Authorization in WDR or Waiver of WDR
Authorization in WDR or Waiver of WDR
- Waiver implemented since 1983
Waiver implemented since 1983
- Waivers expired in 2004
Waivers expired in 2004
- Individual WDR cumbersome & expensive
Individual WDR cumbersome & expensive
- Does not comply with Water Code requirements
Does not comply with Water Code requirements
4 4
Basin Plan Onsite Criteria Basin Plan Onsite Criteria
- Adopted in 1983
Adopted in 1983
- Siting
Siting, design, construction, maintenance & mgmt. , design, construction, maintenance & mgmt.
- Low maintenance & low tech systems
Low maintenance & low tech systems
- Effective low cost treatment
Effective low cost treatment
- Long
Long-
- term water quality protection
term water quality protection
- Applied in local permitting
Applied in local permitting
5 5
2008 Criteria Update 2008 Criteria Update
- Update 25
Update 25-
- year old Basin Plan criteria
year old Basin Plan criteria
- Added and clarified definitions
Added and clarified definitions
- Onsite management plans required & described
Onsite management plans required & described
- Additional treatment for very fast percolating soils
Additional treatment for very fast percolating soils
- Certified professional design on slopes >20%
Certified professional design on slopes >20%
- Prohibited discharge in 25
Prohibited discharge in 25-
- year flood plain
year flood plain
- Fill to be designed as disposal area
Fill to be designed as disposal area
- Brine disposal must be consistent with management plan
Brine disposal must be consistent with management plan
- Retrofit of properly
Retrofit of properly-
- functioning systems not required
functioning systems not required
- Board adopted criteria, legal issues with waiver
Board adopted criteria, legal issues with waiver
6 6
2009 Implementation Update 2009 Implementation Update
- Renew waiver that expired in 2004
Renew waiver that expired in 2004
- Incorporate waiver into Basin Plan
Incorporate waiver into Basin Plan
- Consistent Basin Plan compliance
Consistent Basin Plan compliance
- Guidance for Onsite Management Plans
Guidance for Onsite Management Plans
- Local agencies oversight most effective
Local agencies oversight most effective
- address community
address community-
- specific conditions
specific conditions
- most already implementing oversight
most already implementing oversight
- Permit streamlining benefits stakeholders
Permit streamlining benefits stakeholders
- Efficient compliance with state law
Efficient compliance with state law
- Minimize time and cost to applicant
Minimize time and cost to applicant
- Proactive and long
Proactive and long-
- term water quality protection
term water quality protection
7 7
2011 Revisions (this action) 2011 Revisions (this action)
- Purpose
Purpose – – update Basin Plan criteria and waiver update Basin Plan criteria and waiver
- Waiver for existing onsite systems
Waiver for existing onsite systems
- Waiver for new systems that meet Basin Plan criteria or OMP
Waiver for new systems that meet Basin Plan criteria or OMP
- Revisions described in Staff Report (pages 4
Revisions described in Staff Report (pages 4-
- 6)
6)
- Definitions expanded & background added
Definitions expanded & background added
- Onsite Management Plan detail added
Onsite Management Plan detail added
- Requirements consolidated from various sections
Requirements consolidated from various sections
- Board approval of Onsite Management Plans
Board approval of Onsite Management Plans
- Reorganized
Reorganized – – implementation brought forward implementation brought forward
- Clarify conditions of waiver
Clarify conditions of waiver
- Consistent terminology
Consistent terminology
- Consistent with State Board staff recommendations
Consistent with State Board staff recommendations
8 8
Issues of Public Concern Issues of Public Concern
- Cost to local agency of onsite mgmt plan
Cost to local agency of onsite mgmt plan
- Activities already implemented by local agencies
Activities already implemented by local agencies
- Utilize available information
Utilize available information
- Prevents cost of correcting problems
Prevents cost of correcting problems
- OMP condition of waiver
OMP condition of waiver
- Limits secondary units on less than two acres
Limits secondary units on less than two acres
- 1983 requirement clarified
1983 requirement clarified
- Alternative criteria in onsite management plans
Alternative criteria in onsite management plans
- Work with local agencies to develop program
Work with local agencies to develop program
- Local agency outreach meetings
Local agency outreach meetings
- Scoping workshops & Water Board meetings
Scoping workshops & Water Board meetings
- Website information page
Website information page
- Draft documents circulated for public comment
Draft documents circulated for public comment
9 9
Conditions of Waiver Conditions of Waiver
Without Local Onsite Mgmt Plan Without Local Onsite Mgmt Plan
- Submittal of application
Submittal of application
- $560 fee (set by State Board)
$560 fee (set by State Board)
- Application documents
Application documents consistency with Basin Plan consistency with Basin Plan
- Staff review & enrollment
Staff review & enrollment
- Local permitting procedures
Local permitting procedures With MOU & Onsite Mgmt Plan With MOU & Onsite Mgmt Plan
- Application waived
Application waived
- No application fee
No application fee
- System consistent with local
System consistent with local
- nsite management plan
- nsite management plan
- Local permitting procedures
Local permitting procedures
10 10
Observed Failures in the San Lorenzo Watershed Observed Failures in the San Lorenzo Watershed Reduction after implementing onsite management plan Reduction after implementing onsite management plan
San Lorenzo Watershed
0% 2% 4% 6% 8% 10% 12% 14% 16% 18% 20% 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 Year
Percent of Parcels Failing County Inspections Pumper Reports
11 11
Work Outstanding Work Outstanding
- Submit Basin Plan Amendment to State Water
Submit Basin Plan Amendment to State Water Board and OAL for review and approval Board and OAL for review and approval
- Develop
Develop MOUs MOUs with local permitting agencies with local permitting agencies
- Assist local agencies with onsite mgmt plans
Assist local agencies with onsite mgmt plans
- New onsite systems
New onsite systems -
- c
continue status quo for
- ntinue status quo for
limited time (1 year) while developing limited time (1 year) while developing MOUs MOUs and and
- nsite management plans
- nsite management plans
12 12
Corrections Corrections
p.4 editorial correction p.4 editorial correction p.8 waiver of ROWD p.8 waiver of ROWD and WDR and WDR
“ “For an onsite wastewater system to be eligible for a conditional
For an onsite wastewater system to be eligible for a conditional waiver waiver of
- f
Report of Waste Discharge Report of Waste Discharge and Waste Discharge Requirements and Waste Discharge Requirements, local , local governing jurisdictions must develop and implement programs to e governing jurisdictions must develop and implement programs to ensure nsure conformance with this Basin Plan conformance with this Basin Plan (as found in the following sections) (as found in the following sections) and and local regulations local regulations and enter into memorandum of understanding with the and enter into memorandum of understanding with the Central Coast Water Board Central Coast Water Board. .” ”
p.9 Local management plan recommended (required as p.9 Local management plan recommended (required as condition of waiver) condition of waiver)
“ “5.
5. Onsite Wastewater Management Plans Onsite Wastewater Management Plans should should be prepared and be prepared and implemented for urbanizing and high density areas served by onsi implemented for urbanizing and high density areas served by onsite te wastewater systems. wastewater systems.” ”
13 13
Corrections Corrections
p.10 delete redundant paragraph p.10 delete redundant paragraph
“ “2. Onsite wastewater management plans shall be prepared and
- 2. Onsite wastewater management plans shall be prepared and
implemented for urbanizing and high density areas served by onsi implemented for urbanizing and high density areas served by onsite te wastewater systems. wastewater systems.” ”
p.10 clarify management plan components p.10 clarify management plan components
- Survey and evaluation of
Survey and evaluation of information regarding effectiveness of information regarding effectiveness of existing existing
- nsite systems.
- nsite systems.
- Water quality (groundwater and surface water)
Water quality (groundwater and surface water) evaluation evaluation program. program.
14 14
Amendment Conclusions Amendment Conclusions
- Update needed to clarify 2008 & 2009 Basin
Update needed to clarify 2008 & 2009 Basin Plan Amendments for State Board approval Plan Amendments for State Board approval
- Update expired waiver
Update expired waiver
- Long
Long-
- term protection of surface water,
term protection of surface water, groundwater and public health groundwater and public health
15 15
Action Recommended Action Recommended
Item No. 18 Item No. 18 Adopt Resolution No. R3 Adopt Resolution No. R3-
- 2011
2011-
- 0004