august 23 t 23 2018 2018 meeti ting
play

August 23, t 23, 2018 2018 Meeti ting 8/23/18 Meeting Agenda - PowerPoint PPT Presentation

Friends of Roberts Field August 23, t 23, 2018 2018 Meeti ting 8/23/18 Meeting Agenda New Playground Project Update and Discussion Environmental Bond Bill 4835 Update New Store Update DPW Update Natural Play Area


  1. Friends of Roberts Field August 23, t 23, 2018 2018 Meeti ting 8/23/18

  2. Meeting Agenda • New Playground Project Update and Discussion • Environmental Bond Bill 4835 Update • New Store Update • DPW Update • “Natural Play Area” Design Update • Engraved Brick Inventory Update • Fundraising Update & Discussion • Treasurer’s Report • Vote To Release Funds To Town • Next Meeting • Adjourn 2

  3. FY19 State Budget – Environmental Bond Bill • Potential State funding of $500k for Roberts Field • From the Town Manager • The Governor signed the State budget last Thursday. He is expected to sign the environmental bond bill. The bond bill is an authorization piece of legislation. The Governor then decides over time which of the projects to fund within the State’s limited debt capacity. Therefore, the lobbying needs to take place at a later time. • I will let you know when would be a beneficial time to seek the Governor’s release of the funds. 3

  4. New Store Update • Contacted by Laura Lindberg, new owner of Rosie’s Corner Store • My 2 sisters and I have purchased the shop, we close on August 31 and have hired an architect and contractor to renovate as soon as we close, with the hopes of being open by early to mid October . • We are excited to offer high-quality, fair trade coffee, locally made baked goods, premade sandwiches and salads as well as snacks, candy and beverages for commuters, playground and ball field visitors. 4

  5. Playground Project Updates • Updates From Steve Jahnle, DPW • The fence is delayed at this point because we cannot free up a crew to do the remaining prep work. I’m hoping in the next couple of weeks we can get back up there and do some grading and clear up behind the zip line for the fence install. • Tables and benches are here. Tables I’m going to wait until the shade structure is up. Benches, I have 4 and tell me where you want them or we can place them. • Shade structure is on site. • Matts are also here and will try and install next week. • Costs….the sand diggers were $2068. Brick walk was $7800 plus $3159.90 (blank bricks, setting sand, edging and polymer sand). • I’ll follow up on moving the porta potty. I thought that request went in already. • The PIP is about $20-$22 a SF for 3-1/2 inch thick material. We would have to confirm square footage, price and see about install. • Walkway from the parking lot to the entry will be off season work, late fall or early spring. • Bike racks would need to moved from the current location anyway and we have one more here of the same style. • I will try and do the replacement bricks at some point next week (wk of 9/13). • The Friendship swing has been modified to eliminate the clunk noise in the hinges. Also, some protective rubber was placed in the tower from the recommendation of Landscape structures. We’ll see how it works. There is a modification coming for the bucket seats as well to keep the harness up when entering or exiting. 5

  6. Natural Play Area Design • Wall and Path Work Starts Week of 10/2 • Town provided 1/3 payment • Earthscape and Lawn to coordinate with Town to close areas when working. • Committee to provide design Draft placement and selection of Climbing Design Rocks • Granite Benches Ordered • Kinetic Sculpture Being Built • Animal Tracks To Be Ordered • Gazing Ball(s) To Be Ordered 6

  7. 7

  8. Bench Update • Six granite sitting stones ordered • All sponsored • All with recessed area for sponsor plaques • One with recessed area for scavenger hunt plaque • Four metal benches to be installed • One sponsored • One refurbished bench to be installed (sponsored) • One more pending sponsorship 8

  9. Fundraising Update & Discussion Friendship Park Fundraising Recap 8/19/2018 • Fundraising will continue through April 2019 Campaign Amount Buy A Brick $ 49,200.00 ($19,635 proceeds) • Town’s Fiscal Year 2019 ends in June Sponsorships • “Other Fundraising” allocated to Equipment $ 17,330.00 General Fund Premier $ 27,500.00 Other Fundraising • Available for FoRF use in support of Go Fund Me $ 126.00 Friendship Park and Roberts Field Restaurants $ 128.98 Merchandise $ 284.40 2018 Country Fair $ 137.32 Flower Arranging $ 50.00 General Fund $ 839.45 Grants $ 2,979.20 Pre-Existing* $ 8,042.00 In Kind Donations $ 10,200.00 Total Fundraising Value $ 116,817.35 *$2500 KDK Silver Sponsorship in Premier Sponsorship amount 9 *$2000 Chelmsford PAL in Equipment Sponsorship

  10. Donation Sponsorship Company In-Kind Equipment Covered Bridge Entryway Heritage Construction In-Kind Equipment Sign Kiosk Heritage Construction Our 34 Sponsors In-Kind Equipment Climbing Rocks Earthscapes and Lawn In-Kind Equipment Consultation Weston Nurseries Equipment TBD The Brown Family Equipment Belt Bridge Aces Aquatics Equipment TBD Barry and Sue Jefferson Equipment TBD + 501c3 Filing Fee Enterprise Bank Equipment Double Swish Slide Kurt Kelly Memorial Foundation Equipment T Shirt and Sculpture Christopher's Towing Equipment TBD Chelmsford PAL Equipment T Shirt Cuthbertson & Stavis Family Equipment Granite Bench + $100 Chelmsford Youth Baseball Equipment Metal Bench Shirley & Dick Lindsey Equipment Refurbished Bench The Lanzillo Family Equipment TBD Circle Health Equipment Gazing Balls Paul and Jeanne Bartel Equipment Granite Benches Chelmsford Lions Club Equipment Granite Bench Olenchak Family Equipment Playground Signage Ostman Family Equipment Granite Bench Gurukul Learning Center Equipment TBD Daniel and Maria Hart Equipment Granite Bench The Manzelli Family Premier Silver DrumHill Pediatrics Premier Silver The Beary Family Premier Bronze The Singam Family Premier Gold The Gilchrist Family Premier Silver Kurt Kelly Memorial Foundation Premier Platinum The Askenburg Family Premier Bronze Ready Real Estate Premier Bronze Chelmsford Mother's Club Premier Bronze The Chase Bobrow Family Premier Bronze Northern Bank Premier Silver Trinity Emergency Medical Services Grant Matching Donation Keurig & Jennifer Bailey 10 Grant 3M

  11. Engraved Brick Inventory Update • Brick Inventory Conducted • 4 missing 4x8 bricks • 3 replacements pending install • 1 more confirmed missing to be ordered • 5 installation damaged and 1 customer reorder • pending install by the DPW • 1 missing brick in 1995 pathway to be ordered • 765 (+/- 1%) horizontal full size blank bricks • Brick Pathway Video - youtu.be/b3_RS3SuZE8 11

  12. Buy A Brick Fundraiser Recap • 740 Bricks Sold $49,200 • Less engraving and yard signs $18,310 • Less PayPal fees $294 • Less Installation $10,960 • Total Proceeds $19,635 • 80% of transactions through PayPal • 67% sold were 4 x 8 bricks • One reorder due to customer error • Ten reorders due to installation errors 12

  13. Another Brick Campaign? • Another Brick Campaign • Swap blanks for engraved bricks (765 horizontal blanks) • Installation Spring 2019 – in kind donation (est $1.5k - $2.5k) Friends of Roberts Field Second Buy A Brick Campaign Proceeds Schedule Proceeds $25K Proceeds $18k Proceeds $10k Sold Out 700 Brick Cost* Price Proceeds Proceeds Bricks Sold Raised Bricks Sold Raised Bricks Sold Raised Bricks Sold 4 x 8 $ 20.05 $ 50 $ 29.95 $ 25,000 835 $ 18,000 601 $ 10,000 334 $ 20,965.00 700 $ 20.05 $ 75 $ 54.95 $ 25,000 455 $ 18,000 328 $ 10,000 182 $ 38,465.00 700 $ 20.05 $ 100 $ 79.95 $ 25,000 313 $ 18,000 225 $ 10,000 125 $ 55,965.00 700 $ 20.05 $ 125 $ 104.95 $ 25,000 238 $ 18,000 172 $ 10,000 95 $ 73,465.00 700 $ 20.05 $ 150 $ 129.95 $ 25,000 192 $ 18,000 139 $ 10,000 77 $ 90,965.00 700 *engraving cost ($18.30) plus $1.75 for paypal and cc fees Estimated Installation Cost: labor cost donated with approximately $200 in materials (sand). 1995 4x8 bricks sold for $60 2018 4x8 bricks sold for $50 13

  14. Webstore Sales - Spreadshirt • Total proceeds from sales - $284.40 • 38 sales (May 15 – present) • 34 T shirts, hoodies, kids clothes • 4 Mugs • 21 items with Friendship Park Logo 14

  15. 2018 Country Fair Recap and Fall Fest News • Hosted Booth July 3 rd – 4 th • Sold face painting, t shirts, cotton candy and water • Collected donations COUNTRY FAIR BOOTH Revenue $230.00 Machine Rental & Supplies -$92.68 CASH ON HAND $137.32 Booth Fee -$85.00 Net Profit $52.32 • Fall Fair Booth • 9/22, 10am-3pm • Free booth with free face painting • Accepting donations, sales? 15

  16. Other Fundraisers To Discuss • Continue selling sponsorships • Revamp GoFundMe • Playground Photography Mini Sessions • Fall18 and Spring19 • American Academy of Dermatology Shade Grant • 2019 grant cycle opens early October • More shade for the 2-5 Area, Field side 12+ area, sandbox, swings • New Tree Planting Plan • More benches and tables 16

  17. Shade Structure Rough Costs • Single post shades with removable canvas • $6,180 each delivered and installed ($3,780/$2,400 install) • 12’ x 12’ canvas life expectancy • Taken inside seasonally: decades • Left outside: 10-15 years • Can be placed inside sand box area (ASTM) • Est. $1k canvas replacement cost • Sail Structures • RI sample structure $40k (35’ x 18’) • Estimated $20k equip/$20k install • ASTM guideline – 84” above structure • Require HUGE footings • 8’ x 4’ footing in some cases 17

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend