articulation along 23 rd for pedestrian scale
play

Articulation along 23 rd for pedestrian scale +92 15 Gateway at 23 - PowerPoint PPT Presentation

Articulation along 23 rd for pedestrian scale +92 15 Gateway at 23 rd Street +92 16 Conceptual Site Plan 17 Courtyard access between proposed UCSF Research Building & Bldg 5 (current hospital) 18 Proposed Parking Solution 19


  1. Articulation along 23 rd for pedestrian scale +92’ 15

  2. Gateway at 23 rd Street +92’ 16

  3. Conceptual Site Plan 17

  4. Courtyard access between proposed UCSF Research Building & Bldg 5 (current hospital) 18

  5. Proposed Parking Solution 19

  6. Parking • SF Dept. of Public Health and the SF Municipal Transportation Agency (MTA) have determined that the only feasible approach to parking is an addition to the 23 rd street garage – The addition would extend the original garage design – Would be constructed on the surface parking lot adjacent to the existing garage – It will NOT add height to the existing structure – The addition would provide parking over and above the amount displaced by the new research building – UCSF and MTA are analyzing existing and future parking demand, supply, and transportation impacts 20

  7. Interim Seismic Measures 21

  8. SFGH: Seismic Ratings by UC Regents 22

  9. Interim Seismic Measures at SFGH • Temporary measures to protect the safety of workers, patients and visitors in existing “Very Poor” buildings (Bldgs. 10 – 40 & 100) • Canopies over building exits (not attached to buildings) • Landscaping or low fences at 10’ perimeter of buildings where needed • Localized re-anchoring some roof tile on Building 30 • Strengthening of parapet elements at Building 100 • Timeline: 2013/2014 23

  10. OTHER SFGH CAMPUS IMPROVEMENTS 24

  11. Other SFGH Campus Improvements • Proposed 2015 Bond Measure – Repurposing Building 5 – Other Improvements off campus 25

  12. NEXT STEPS: SCHEDULE MILESTONES 26

  13. Schedule Milestones UC Actions Negotiate B/C Lot site control with City 2013 Implement interim measures 2013/2014 Amend LRDP & Complete LRDP EIR 2014 Complete Project Level EIR 2014 Approve B/C lot building budget/design 2014 Begin construction on B/C lot 2016 – 2018 City Actions Negotiate B/C Lot site control with UCSF 2013 Update 10-Year Capital Plan and Institutional Master Plan 2013 City Agency B/C Lot Bldg Approvals 2014-2015 Garage Addition Design & Construction 2014-2016 (schedule contingent on funding and City approvals) 27

  14. Proposed UCSF SFGH Research Building – Conceptual Study Community Meeting #2 June 17, 2013

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend