Articulation along 23 rd for pedestrian scale +92 15 Gateway at 23 rd Street +92 16 Conceptual Site Plan 17 Courtyard access between proposed UCSF Research Building & Bldg 5 (current hospital) 18 Proposed Parking Solution 19


slide-1
SLIDE 1

15 +92’

Articulation along 23rd for pedestrian scale

slide-2
SLIDE 2

16 +92’

Gateway at 23rd Street

slide-3
SLIDE 3

Conceptual Site Plan

17

slide-4
SLIDE 4

Courtyard access between proposed UCSF Research Building & Bldg 5 (current hospital)

18

slide-5
SLIDE 5

Proposed Parking Solution

19

slide-6
SLIDE 6

Parking

  • SF Dept. of Public Health and the SF Municipal

Transportation Agency (MTA) have determined that the only feasible approach to parking is an addition to the 23rd street garage

– The addition would extend the original garage design – Would be constructed on the surface parking lot adjacent to the existing garage – It will NOT add height to the existing structure – The addition would provide parking over and above the amount displaced by the new research building – UCSF and MTA are analyzing existing and future parking demand, supply, and transportation impacts

20

slide-7
SLIDE 7

Interim Seismic Measures

21

slide-8
SLIDE 8

22

SFGH: Seismic Ratings by UC Regents

slide-9
SLIDE 9

Interim Seismic Measures at SFGH

  • Temporary measures to protect the safety of workers,

patients and visitors in existing “Very Poor” buildings (Bldgs. 10 – 40 & 100)

  • Canopies over building exits (not attached to

buildings)

  • Landscaping or low fences at 10’ perimeter of

buildings where needed

  • Localized re-anchoring some roof tile on Building 30
  • Strengthening of parapet elements at Building 100
  • Timeline: 2013/2014

23

slide-10
SLIDE 10

24

OTHER SFGH CAMPUS IMPROVEMENTS

slide-11
SLIDE 11

Other SFGH Campus Improvements

  • Proposed 2015 Bond Measure

– Repurposing Building 5 – Other Improvements off campus

25

slide-12
SLIDE 12

NEXT STEPS: SCHEDULE MILESTONES

26

slide-13
SLIDE 13

Schedule Milestones

27

UC Actions Negotiate B/C Lot site control with City 2013 Implement interim measures 2013/2014 Amend LRDP & Complete LRDP EIR 2014 Complete Project Level EIR 2014 Approve B/C lot building budget/design 2014 Begin construction on B/C lot 2016 – 2018 City Actions Negotiate B/C Lot site control with UCSF 2013 Update 10-Year Capital Plan and Institutional Master Plan 2013 City Agency B/C Lot Bldg Approvals 2014-2015 Garage Addition Design & Construction 2014-2016

(schedule contingent on funding and City approvals)

slide-14
SLIDE 14

Proposed UCSF SFGH Research Building – Conceptual Study

Community Meeting #2 June 17, 2013