ARROWHEAD FORWARD
New Elementary School at Arrowhead
April 21st, 2020 Board Update
ARROWHEAD FORWARD New Elementary School at Arrowhead April 21st, - - PowerPoint PPT Presentation
ARROWHEAD FORWARD New Elementary School at Arrowhead April 21st, 2020 Board Update TONIGHTS AGENDA PROPOSED ARROWHEAD 1. Land Development Recap 2. Review of site improvements 3. Review of building improvements 4. Project Schedule Land
New Elementary School at Arrowhead
April 21st, 2020 Board Update
PROPOSED ARROWHEAD
TONIGHT’S AGENDA
improvements
Schedule
2
LAND DEVELOPMENT RECAP
2020)
3
50’ SETBACK
4
EXISTING SITE & SETBACKS
5
TREE LINE WATER VAULT NEIGHBORS NEIGHBORS
EXISTING SITE & SETBACKS
6
REMOVE EXISTING MODULARS
EXISTING SITE & SETBACKS
7
FULL SIZE FIELD
MAIN ENTRY SERVICE ACCESS
EQUIP. FIRE LANE PLAY
LEARNING
PROPOSED SITE PLAN
PROPOSED ARROWHEAD ELEMENTARY
K-4 ELEMENTARY 5 CLASSROOMS PER GRADE TOTAL CAPACITY: 625 FIRST FLOOR: 57,987 SF SECOND FLOOR: 27,309 SF TOTAL: 85,296 SF ACADEMIC: 15 CLASSROOMS, 900 SF, NO TOILETS 10 CLASSROOMS, 835 SF, SINGLE-USE TOILET IN CLASSROOM 8 SPECIAL EDUCATION, 660-900 SF COLLABORATION: LIBRARY, 2000 SF + STEM 1200 SF 5 SMALL GROUP INSTRUCTION ROOMS, 350 SF 2 INNOVATION SPACES, 850 SF COMMUNITY: CAFETERIA, 2400 SF GYM, 5800 SF STAGE, 950 SF
8
ARROWHEAD ELEMENTARY
PROPOSED ARROWHEAD ELEMENTARY
FIRST FLOOR PLAN
FIRST FLOOR 57,987 SF SECOND FLOOR 27,309 SF TOTAL 85,296 SF
GYM KITCHEN CAFETERIA
MUSIC ROOM INSTRUM. ROOM
ADMIN. NURSE LIBRARY STEM OT/PT SGI SGI INNOVATION SPACE LEARNING SUPPORT EMOTIONAL SUPPORT KINDERGARTEN SPEECH ELL KINDERGARTEN 1st GRADE 1st GRADE LOBBY
10 OFFICE
FACULTY
STAGE
ACADEMIC COMMUNITY
FIRE SEPERATION
PROPOSED ARROWHEAD ELEMENTARY
SECOND FLOOR PLAN
ART SGI INNOVATION SPACE 3rd GRADE 3rd GRADE 4th GRADE LOBBY 2nd GRADE 2nd GRADE SGI LIBRARY
(BELOW)
4th GRADE GIFTED READ. TV
11
SGI
FIRST FLOOR 57,987 SF SECOND FLOOR 27,309 SF TOTAL 85,296 SF
ACADEMIC
PARKING & PLAY
13
FRONT ENTRY
14
FRONT ANIMATION
15
ADMINISTRATION + LOBBY
RECEPTION SECURE VESTIBULE WORK ROOM CONFERENCE PRINCIPAL SCHOOL PSYCOLOGIST NURSE’S SUITE SCHOOL COUNSELOR
1
16
RECEPTION
17
RECEPTION ANIMATION
18
MAIN LOBBY
GYMNASIUM
19
50X74 COURT
8’ RUN OFF 4’ SIDELINES
RETRACTABLE BLEACHERS
42’ LONG 80 SEATS
OFFICE
GYM OFFICE STORAGE
STAGE ACCESS
RAMP SOUND ROOM
1,200 SF INCREASE
ACCOMODATING LARGER COURT + BLEACHERS
192 SEATS
16 TABLES
SINGLE SERVE LINE
CAFETERIA
192 SEATING CAPACITY
REUSE OF EXISTING TABLES
LOADING ZONE
RECEIVING/RECEIVING OFFICE
SINGLE-SERVICE LINE KITCHEN CONSULTANT
ALL EXISTING NEEDS + ACCOMODATIONS FOR THE POPULATION INCREASE
20
21
LOBBY ANIMATION
STEM WORKSPACE
LIBRARY + STEM
LIBRARY OFFICE COPY ROOM
+1000 LINEAR INCHES OF SHELVING CLASSROOM SPACE
22
1
23
LIBRARY ENTRY
24
LIBRARY ANIMATION
25
LIBRARY
26
LIBRARY
27
STEM CLASSROOM
28
STEM ANIMATION
INNOVATION SPACE
(25-50 STUDENTS) FLEXIBLE FURNITURE
SMALL GROUP INSTRUCTION + INNOVATION SPACE
TEACHING WALL
SGI SGI
29
SMALL GROUP INSTRUCTION
TEACHING WALL TEACHING WALL TEACHING WALL BASE CABINETS (LOCKABLE) BASE CABINETS (LOCKABLE)
30
31
INNOVATION COMMONS
32
9 5 1 INNOVATION COMMONS
CLASSROOM ENTRY
33
TACK SURFACE FOR CLASSROOM IDENTITY BUILT-IN BENCH FOR SEATING LOCKERS FOR EASY ACCESS GROUPED ENTRY FOR SUPERVISION
TYPICAL CLASSROOM (K-1)
TEACHING WALLS
34
TYPICAL CLASSROOM (K-1) CASEWORK - BASEBID
35
TYPICAL CLASSROOM (K-1) CASEWORK – ALTERNATE 1
36
TYPICAL CLASSROOM (K-1) CASEWORK – ALTERNATE 2
37
TYPICAL CLASSROOM (2-4)
TEACHING WALLS
38
TYPICAL CLASSROOM (2-4) CASEWORK – BASE BID
39
TYPICAL CLASSROOM (2-4) CASEWORK – ALTERNATE 1
40
TYPICAL CLASSROOM (2-4) CASEWORK – ALTERNATE 2
41
EXPANDED CLASSROOM
660 CLASSROOM EXPANSION FOR 900 SF CLASSROOM
42
43
SECOND FLOOR ANIMATION
LIBRARY BELOW TV STUDIO
ART + COLLABORATION
ART CLASSROOM
44
COPY ROOM SGI
45
SMALL GROUP INSTRUCTION
46
Proposed New Construction (84,000sf @ $270/sf) $22,680,000 Site work required for new construction (18%) $4,082,400 Demo of existing school building (52,534sf @ $8/sf) $420,272 Design/Bidding Contingency - 3% $815,480 TOTAL CONSTRUCTION COST $27,998,152 Construction Contingency - 5% $1,399,908 Soft Costs - 13% (Fees, Permits, etc.) $3,639,760 Budget: FF&E Allowance ($1200/student) $750,000 TOTAL PROJECT COST $33,787,820
47
January 2020 (Schematic Design Estimate)
Proposed New Construction (84,000sf @ $270/sf) $22,680,000 Site work required for new construction (18%) $4,082,400 Demo of existing school building (52,534sf @ $8/sf) $420,272 Design/Bidding Contingency - 3% $815,480 TOTAL CONSTRUCTION COST $27,998,152 Construction Contingency - 5% $1,399,908 Soft Costs - 13% (Fees, Permits, etc.) $3,639,760 Budget: FF&E Allowance ($1200/student) $750,000 TOTAL PROJECT COST $33,787,820
48
January 2020 (Schematic Design Estimate) Changes that reflect cost:
+1200sf
+480sf 1680sf increase of educational space Only 1296sf building increase
Proposed New Construction (85,296sf* @ $270/sf) $23,029,920 Site work required for new construction (18%) $4,145,386 Demo of existing school building (52,534sf @ $8/sf) $420,272 Design/Bidding Contingency - 3% $827,867 TOTAL CONSTRUCTION COST $28,423,445 Construction Contingency - 5% $1,421,172 Soft Costs - 13% (Fees, Permits, etc.) $3,695,048 Budget: FF&E Allowance ($1200/student) $750,000 TOTAL PROJECT COST $34,289,665**
49
March 2020 (50% Design Development Estimate) *Includes 1680sf net educational space increase with only 1296sf total building increase **Original estimate presented to board 8/20/2019 was $34,347,783
SCHOOL BOARD MAY 19TH WILL INCLUDE THIRD PARTY COST ESTIMATE
50
CONSTRUCTION DOCUMENTATION
CONSTRUCTION BIDS NOV. ‘20
51
52