approval and gazettal of psps and icps process and
play

Approval and Gazettal of PSPs and ICPs- Process and Timeframes Alix - PowerPoint PPT Presentation

Approval and Gazettal of PSPs and ICPs- Process and Timeframes Alix Rhodes- Executive Director-Outer Melbourne Victorian Planning Authority 14 May 2018 Your partner in planning great places for a growing Victoria


  1. Approval and Gazettal of PSPs and ICPs- Process and Timeframes Alix Rhodes- Executive Director-Outer Melbourne Victorian Planning Authority 14 May 2018 Your partner in planning great places for a growing Victoria

  2. ��������������������� For PSPs that are approved, and PSPs for which approval is imminent, interim supplementary levies are to be approved under section 20(4) of the Planning and Environment Act 1987 .

  3. ��������������������� The interim arrangements will: Allow approved ICPs to be replaced to use the new land contribution model Allow development to progress while the final ICP is developed Allow collecting agencies to collect infrastructure contributions

  4. ������������������� The Final Supplementary ICPs will undergo a normal planning scheme amendment process and will replace the transitional arrangements.

  5. ���������������������� ��������������������������������� �� ��������������� �������������������� • Precinct Infrastructure Plan in the PSP establishes provides strategic justification for items to be funded through the ICP • The Precinct Infrastructure Plan in the PSP is PSP exhibition & Panel Process challenged and tested • Directly following the approval of the PSP, the ICP to be approved by the Minister for Planning PSP approval under S20 (a) of the P&E Act & ICP approval (under 20(a) of the P& E Act

  6. ��������������������� � !��"��������������������������� ������������#������ Interim ICP • Supplementary ICP Levy approved under S20(4) of the P&E Act approved 2 • At approval of interim ICP, planning permits can be approved and July 2018 ICP liabilities triggered Exhibition Amended • A 20(a) amendment will be required to update the estimates of July/ Aug Interim ICP land value, after land owners have contested and referred to 2018 Valuer General if needed. Sep 2018 • A normal planning scheme amendment will be Final ICP required to approve the final ICP June 2019 • The version exhibited will be same as interim ICP *indicative timeframes

  7. ��������������������� � $���#%���������&��������� ������������#������ Interim ICP • Supplementary ICP Levy approved under S20(4) of the P&E Act approved 2 • At approval of interim ICP, planning permits can be approved and July 2018 ICP liabilities triggered Exhibition Amended • A 20(a) amendment will be required to update the estimates of Jul/ Aug Interim ICP land value, after land owners have contested and referred to 2018 Valuer General if needed. Sep 2018 • A normal planning scheme amendment will be Final ICP required to approve the final ICP June 2019 • The version exhibited will be same as interim ICP *indicative timeframes

  8. ��������������������� � �������������'��������������������#� ����� Interim ICP • Supplementary ICP Levy approved under S20(4) of the P&E Act approved 2 • At approval of interim ICP, planning permits can be approved and July 2018 ICP liabilities triggered Amended • A 20(a) amendment will be required to update the estimates of Exhibition Interim ICP land value, after land owners have contested and referred to May 2018 Valuer General if needed. Jul/Aug 2018 • A normal planning scheme amendment will be Final ICP required to approve the final ICP January 2019 • The version exhibited will be same as interim ICP *indicative timeframes

  9. ��������������������� � (�)���������������������������#������ Interim ICP • Supplementary ICP Levy approved under S20(4) of the P&E Act approved 2 • At approval of interim ICP, planning permits can be approved and July 2018 ICP liabilities triggered Amended • A 20(a) amendment will be required to update the estimates of Exhibition Interim ICP land value, after land owners have contested and referred to July 2018 Valuer General if needed. Sep 2018 • A normal planning scheme amendment will be Final ICP required to approve the final ICP Jul 2019 • The version exhibited will be same as interim ICP *indicative timeframes

  10. ��������������������� � ���%��#�������*������+�����,���� ������������#������ Interim ICP • Supplementary ICP Levy approved under S20(4) of the P&E Act approved • At approval of interim ICP, planning permits can be approved and August 2018 ICP liabilities triggered Exhibition Amended • A 20(a) amendment will be required to update the estimates of August Interim ICP land value, after land owners have contested and referred to 2018 Valuer General if needed. Oct 2018 • A normal planning scheme amendment will be Final ICP required to approve the final ICP August 2019 • The version exhibited will be same as interim ICP *indicative timeframes

  11. ��������������������� � !���� �����������������#������ Interim ICP • Supplementary ICP Levy approved under S20(4) of the P&E Act approved • At approval of interim ICP, planning permits can be approved and November ICP liabilities triggered 2018 Amended Exhibition • A 20(a) amendment will be required to update the estimates of Interim ICP November land value, after land owners have contested and referred to November 2018 Valuer General if needed. 2018 • A normal planning scheme amendment will be Final ICP required to approve the final ICP July 2019 • The version exhibited will be interim ICP *indicative timeframes

  12. ����������������������������#������ In future, the intent is for PSPs and supplementary ICPs to be exhibited concurrently

  13. ������������������� The interim arrangements will allow the permit application and approval process to progress once they are approved The collecting agency and the developer may enter into agreement to reconcile (over or under payments) contributions once the final ICP is gazetted.

  14. ����������+������)����� An independent valuer must be engaged to undertake site specific valuations for the parcels where there is a higher than average contribution of land (section 46GN of the Act) The VPA must then notify affected landowners and council in writing of the results of the valuers reports (section 46GO and 46GP of the Act) The affected landowners then are able to make a submission about the valuers report. (section 46GQ of the Act) The intent is for the land to be re-valued annually as there is no existing index appropriate for changing land values.

  15. ��+������������������� The VPA will utilise a set of standardised ‘benchmark costs’ to estimate costs for infrastructure items For ‘non standard’ construction items, a design and costing will be undertaken The benchmark costs will be consulted on Costs will be provided as part of the exhibition process for supplementary levies only.

  16. -��������

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend