SLIDE 2 A project in Seattle with a 30,000 square feet total site area is planning to earn the credit under Site Development for on-site
- restoration. What is the minimum amount
- f native/adapted vegetation the site
should have in-place to promote biodiversity?
Answer
A. 4,500 B. 5,000 C. 6,000 D. 7,000
SLIDE 3
The total site area for a retail project is 45,000 sq.ft. How much should be the minimum financial contribution to earn SS credit 1- site development?
Answer
A. $200 B. $225 C. $450 D. $500
SLIDE 4
A School project is planning to earn SS credit - rainwater management. What is the maximum number of point that the school can earn under this credit?
Answer
A. 1 B. 2 C. 3
SLIDE 5
What is the maximum number of point that a retail project can earn under the credit joint use of facilities?
Answer
A. 1 B. 2 C. 3 D. None
SLIDE 6
Within how many days of inspection should the maintenance, repairs and stabilization be done under SS Credit - Rainwater management?
Answer
A. 30 B. 60 C. 90 D. 120
SLIDE 7
A project located in downtown Atlanta has total site area of 45,000 sq.ft. The site has 5,000 sq.ft. of impervious area. How much water has to be captured and treated using GI and LID practices in order to earn exemplary performance under SS credit - rainwater management?
Answer
A. 1500 B. 2000 C. 2500 D. 4000
SLIDE 8
How often should the high-reflectance roof surface be cleaned for Option 2. roof under Heat Island Reduction credit?
Answer
A. Every year B. Once every 2 years C. Once every 3 years D. Once every 5 years
SLIDE 9
The illumination level measured with the lights on must not be more than _____% above the level measured with lights off for light pollution reduction credit.
Answer
A. 10% B. 20% C. 30% D. 35%
SLIDE 10
The project is planning to earn light pollution reduction credit using perimeter measurement option. How many measurements are required and with how much spacing between them.
Answer
A. 8 measurements and 100 feet spacing B. 10 measurements and 100 feet spacing C. 5 measurements and 100 feet spacing D. 2 measurements and 100 feet spacing
SLIDE 11
What are the topics that site improvement plan should include in order to attain SS credit site improvement plan credit?(Choose 3)
Answer
A. Hydrology B. Vegetation C. Soils D. Energy E. Water F. Indoor Air Quality