A project in Seattle with a 30,000 square feet total site area is planning to earn the A. 4,500 credit under Site Development for on-site B. 5,000 restoration. What is the minimum amount C. 6,000 of native/adapted vegetation the site D.


slide-1
SLIDE 1
slide-2
SLIDE 2

A project in Seattle with a 30,000 square feet total site area is planning to earn the credit under Site Development for on-site

  • restoration. What is the minimum amount
  • f native/adapted vegetation the site

should have in-place to promote biodiversity?

Answer

A. 4,500 B. 5,000 C. 6,000 D. 7,000

slide-3
SLIDE 3

The total site area for a retail project is 45,000 sq.ft. How much should be the minimum financial contribution to earn SS credit 1- site development?

Answer

A. $200 B. $225 C. $450 D. $500

slide-4
SLIDE 4

A School project is planning to earn SS credit - rainwater management. What is the maximum number of point that the school can earn under this credit?

Answer

A. 1 B. 2 C. 3

slide-5
SLIDE 5

What is the maximum number of point that a retail project can earn under the credit joint use of facilities?

Answer

A. 1 B. 2 C. 3 D. None

slide-6
SLIDE 6

Within how many days of inspection should the maintenance, repairs and stabilization be done under SS Credit - Rainwater management?

Answer

A. 30 B. 60 C. 90 D. 120

slide-7
SLIDE 7

A project located in downtown Atlanta has total site area of 45,000 sq.ft. The site has 5,000 sq.ft. of impervious area. How much water has to be captured and treated using GI and LID practices in order to earn exemplary performance under SS credit - rainwater management?

Answer

A. 1500 B. 2000 C. 2500 D. 4000

slide-8
SLIDE 8

How often should the high-reflectance roof surface be cleaned for Option 2. roof under Heat Island Reduction credit?

Answer

A. Every year B. Once every 2 years C. Once every 3 years D. Once every 5 years

slide-9
SLIDE 9

The illumination level measured with the lights on must not be more than _____% above the level measured with lights off for light pollution reduction credit.

Answer

A. 10% B. 20% C. 30% D. 35%

slide-10
SLIDE 10

The project is planning to earn light pollution reduction credit using perimeter measurement option. How many measurements are required and with how much spacing between them.

Answer

A. 8 measurements and 100 feet spacing B. 10 measurements and 100 feet spacing C. 5 measurements and 100 feet spacing D. 2 measurements and 100 feet spacing

slide-11
SLIDE 11

What are the topics that site improvement plan should include in order to attain SS credit site improvement plan credit?(Choose 3)

Answer

A. Hydrology B. Vegetation C. Soils D. Energy E. Water F. Indoor Air Quality