1 Ameren Illinois Smart Grid Test Ameren Illinois Smart Grid Test Bed Summary Rod Hilburn Rod Hilburn Managing Supervisor, Technology Applications Center Managing Supervisor, Technology Applications Center Managing Supervisor, Technology


  1. 1 Ameren Illinois Smart Grid Test Ameren Illinois Smart Grid Test Bed Summary Rod Hilburn Rod Hilburn Managing Supervisor, Technology Applications Center Managing Supervisor, Technology Applications Center Managing Supervisor, Technology Applications Center Managing Supervisor, Technology Applications Center Ameren Illinois September 26, 2012

  2. Technology Applications Center – (TAC) gy pp ( ) (SG Test Bed) background O O On October 26, 2011, the Illinois Legislature enacted Senate Bill 1652 which included a b 26 2011 h Illi i L i l d S Bill 1652 hi h i l d d component requiring Ameren Illinois to construct or designate a Smart Grid Testing facility. Technology Applications Center Services Ameren Illinois will provide testing infrastructure, resources, and services from which • companies will be allowed to test programs, technologies, business models and other Smart Grid ‐ related activities while connected to a live utility grid. Requirements from SB 1652 for Technology Applications Center f f h l l Provide companies with open unbiased opportunities for testing programs, • technologies, business models, and other Smart Grid ‐ related activities while connected to the grid. h id Provide companies with opportunities to test and showcase Smart Grid technologies • and services, especially those likely to support the economic development goals of the St t State of Illinois. f Illi i Facility will include a live MISO (Midwest Independent System Operator) signal to • provide testing capabilities of new utility scale applications associated with distributed wind and solar resources wind and solar resources. 2

  3. Technology Applications Center ‐ (SG Test Bed) T h l A li ti C t (SG T t B d) Technology Applications Center Capabilities Energize equipment/sensors at voltage levels up to and including 69 000 volts Energize equipment/sensors at voltage levels up to and including 69,000 volts • • (Champaign) 12,000 volts (Decatur) Verify the proper operation of system control, system optimization ‐ sensory • equipment equipment Perform energized testing of AIC identified equipment for acceptability prior to • wide scale adoption. C Communications infrastructure necessary to receive live MISO signals. i ti i f t t t i li MISO i l • Future capability to analyze communications of Test Bed ‐ located Home Area • Network appliances utilizing AMI network. Future capability to analyze communications with live customers via AMI network. • Collaboration with UIUC on testing & validation procedures, as well as test plan • development 3

  4. T Technology Applications Center Planned Locations h l A li ti C t Pl d L ti 4

  5. Champaign Technology Applications Center SW C SW Corner of UIUC Campus f UIUC C 5

  6. Decatur Technology Applications Center Location 6

  7. Technology Applications Center (SG Test Bed) Fact Sheet Champaign Technology Applications Center (TAC) Champaign Technology Applications Center (TAC) 69/12KV, 5.25 MVA transformer • (2) Two 12KV distribution circuits. Include G&W Viper reclosers with Schweitzer relays. • One circuit feeds approximately 180 live customers, other circuit feeds TAC Overhead One circuit feeds approximately 180 live customers other circuit feeds TAC Overhead – and Underground infrastructure. Building incorporates communications and control infrastructure, 125 V DC battery, Smart • Appliances for Home Area Network testing capabilities. pp g p Communications includes live MISO signal that incorporates ramp rate information, critical • peak price and market based power dispatch signals. Gas transmission/distribution facilities exist on this site. • Additional space is available to expand footprint of Test Bed site (see slide 5) • Decatur Technology Applications Center (TAC) Access to four (4) 12KV distribution circuits for connecting applicant equipment. ( ) g pp q p • Energize equipment/sensors at voltage levels up to and including 12,000 volts. • Future capability to communicate to customers identified for and have agree to possible • Home Area Network testing. Timelines – Champaign TAC available 2Q 2013, Decatur TAC available 4Q 2012 7

  8. Preliminary Layout of Champaign TAC Control y y p g Building 8

  9. TAC Benefits Application Process Security TAC Benefits, Application Process, Security Test Bed Benefits Test Bed Benefits Fulfill the Act’s intent to facilitate the development of new Smart Grid technologies • for promotion of new products. P Provides Ameren Illinois with infrastructure and resources to test, document and id A Illi i ith i f t t d t t t d t d • analyze new distribution equipment and services prior to wide scale adoption of these devices. Establishes opportunity for Ameren & UIUC to jointly research Smart Grid ‐ related E t bli h t it f A & UIUC t j i tl h S t G id l t d • technologies through respective test beds. Receiving, Reviewing, and Qualifying Applicant Proposals Initial Application, Supplemental Information Request Form • Data Security Criteria Required for Grid Connection of Applicant Equipment, Customer Data C it i R i d f G id C ti f A li t E i t C t D t • Privacy policy 9

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.