ALF-CEMI ND Supporting the use of alternative fuels Alternative - - PowerPoint PPT Presentation

alf cemi nd supporting the use of alternative fuels
SMART_READER_LITE
LIVE PREVIEW

ALF-CEMI ND Supporting the use of alternative fuels Alternative - - PowerPoint PPT Presentation

ALF-CEMI ND Supporting the use of alternative fuels Alternative Fuels and Alternative Raw Materials in the cement industry SSA TREN/ 05/ FP6/ EN/ S07.54356/ 020118 WORKSHOP 16 th May 2007, Athens in the Cement I ndustry Workshop on


slide-1
SLIDE 1

Energy and Environment Consultants Energy and Environment Consultants

WORKSHOP 16th May 2007, Athens “Alternative Fuels and Alternative Raw Materials in the Cement I ndustry” 1

ALF-CEMI ND Supporting the use of alternative fuels in the cement industry Contract No: 20118

ALF-CEMI ND Supporting the use of alternative fuels in the cement industry

SSA TREN/ 05/ FP6/ EN/ S07.54356/ 020118

Workshop on Alternative Fuels and Alternative Raw Materials in the Cement I ndustry

Hotel Titania, May 16, 2007 George Georgocostas General Director EXERGI A S.A.

slide-2
SLIDE 2

Energy and Environment Consultants Energy and Environment Consultants

WORKSHOP 16th May 2007, Athens “Alternative Fuels and Alternative Raw Materials in the Cement I ndustry” 2

ALF-CEMI ND Supporting the use of alternative fuels in the cement industry Contract No: 20118

ALF-CEMI ND Project I

  • Title: Supporting the use of alternative fuels in the cement

industry

  • Acronym: ALF-CEMIND
  • Duration: 18 months

̶ Contract was entered into force on May 15, 2006 ̶ Effective starting date July 05, 2006 ̶ Duration 18 months from the effective starting date

  • Aim: to assist the take-off of use of alternative fuels in the

cement industry leading to energy, environmental, social and economic benefits

  • Targeted countries: Greece, Bulgaria, Romania, Cyprus,

Turkey, Poland

slide-3
SLIDE 3

Energy and Environment Consultants Energy and Environment Consultants

WORKSHOP 16th May 2007, Athens “Alternative Fuels and Alternative Raw Materials in the Cement I ndustry” 3

ALF-CEMI ND Supporting the use of alternative fuels in the cement industry Contract No: 20118

ALF-CEMI ND Project I I

Objectives

  • To increase knowledge about the use of alternative fuels and

alternative raw materials in the cement industry of the participating countries;

  • To transfer technical expertise and practical experience from

application, from countries advanced in the field and technology developers;

  • To prove applicability of technologies to a various

implementation environments and understand the limitations/ barriers;

  • To produce and disseminate information on technical and

economic feasibility of the use of alternative fuels in the cement industry.

slide-4
SLIDE 4

Energy and Environment Consultants Energy and Environment Consultants

WORKSHOP 16th May 2007, Athens “Alternative Fuels and Alternative Raw Materials in the Cement I ndustry” 4

ALF-CEMI ND Supporting the use of alternative fuels in the cement industry Contract No: 20118

ALF-CEMI ND Project I I I

Partners

  • EXERGI A S.A., Energy & Environment Consultants
  • SEC, Sofia Energy Centre
  • TRAPEC, Tractebel Project Managers, Engineers & Consultants
  • Van Heekeren & Frima Management Consultants
  • C.I .E., Cyprus Institute of Energy
  • MERKAT, Energy-Environment-Industry Manufacturing,

Marketing, Consulting and Representation Inc.

slide-5
SLIDE 5

Energy and Environment Consultants Energy and Environment Consultants

WORKSHOP 16th May 2007, Athens “Alternative Fuels and Alternative Raw Materials in the Cement I ndustry” 5

ALF-CEMI ND Supporting the use of alternative fuels in the cement industry Contract No: 20118

Workshop’s objectives

  • To present the current situation in the Greek Cement Industry

concerning the use of Alternative Fuels (AF) and Alternative Raw Materials (ARM) (preliminary study results)

  • To analyze the potential barriers

– Legislative/Regulatory framework – Licensing procedures – Waste market conditions/Availability of AF/ARM – Handling of AF/ARM

  • To exchange views on the abovementioned issues
slide-6
SLIDE 6

Energy and Environment Consultants Energy and Environment Consultants

WORKSHOP 16th May 2007, Athens “Alternative Fuels and Alternative Raw Materials in the Cement I ndustry” 6

ALF-CEMI ND Supporting the use of alternative fuels in the cement industry Contract No: 20118

Workshop’s agenda

  • Presentation of the project “Supporting the use of alternative fuels in

the cement industry”, Mr. George Georgocostas – EXERGIA S.A.

  • “The Dutch example”, Mr. Victor Van Heekeren - Van Heekeren & Frima
  • Technology options for the cement industry with the use of alternative

fuels, Mr. Andreas Hand – KHD Humboldt Wedag

  • Coffee Break
  • Waste Co-Processing in Cement Plants - The European Experience, Dr.

Jean-Marie Chandelle - CEMBUREAU

  • Presentation of Cement Companies

– Heracles General Cement Company (member of Lafarge Group) – TITAN Cement Company S.A. – Halyps Building Materials S.A. (part of Italcementi Group)

  • Discussion
  • Working lunch
  • End of the workshop
slide-7
SLIDE 7

Energy and Environment Consultants Energy and Environment Consultants

WORKSHOP 16th May 2007, Athens “Alternative Fuels and Alternative Raw Materials in the Cement I ndustry” 7

ALF-CEMI ND Supporting the use of alternative fuels in the cement industry Contract No: 20118

The Greek Cement I ndustry

  • HERACLES General Cement Company

– member of Lafarge Group – 3 cement plants in Greece – annual production capacity: ~ 9.3 million tons

  • TI TAN Cement Company S.A.

– Greek owned company – 4 cement plants in Greece – annual production capacity: ~ 7.5 million tons

  • HALYPS Building Materials S.A.

– part of Italcementi Group – 1 cement plant in Greece – annual production capacity: ~ 1 million tons

slide-8
SLIDE 8

Energy and Environment Consultants Energy and Environment Consultants

WORKSHOP 16th May 2007, Athens “Alternative Fuels and Alternative Raw Materials in the Cement I ndustry” 8

ALF-CEMI ND Supporting the use of alternative fuels in the cement industry Contract No: 20118

Cement production and consumption in Greece I

slide-9
SLIDE 9

Energy and Environment Consultants Energy and Environment Consultants

WORKSHOP 16th May 2007, Athens “Alternative Fuels and Alternative Raw Materials in the Cement I ndustry” 9

ALF-CEMI ND Supporting the use of alternative fuels in the cement industry Contract No: 20118

Cement production and consumption in Greece I I I

CEMENT SALES (in thousand tonnes)

6794 7322 7731 8223 8575 8943 9394 10486 10981 10431 7629 7317 6925 6385 5678 6275 5869 3944 4482 4896

2.000 4.000 6.000 8.000 10.000 12.000 14.000 16.000 18.000

1995 1996 1997 1998 1999 2000 2001 2002 2003 2004

exports domestic deliv eries

slide-10
SLIDE 10

Energy and Environment Consultants Energy and Environment Consultants

WORKSHOP 16th May 2007, Athens “Alternative Fuels and Alternative Raw Materials in the Cement I ndustry” 10

ALF-CEMI ND Supporting the use of alternative fuels in the cement industry Contract No: 20118

The use of alternative fuels and alternative raw materials in Greece

  • Substitution of conventional fuels < 1%

(2001 data, Cembureau)

  • Significant potential for AF and ARM utilisation
  • Why this low level of substitution?

– Legislative framework, Regulatory issues? – Financial and/or other incentives? – Technology? – Other barriers?

  • Potential types of AF and ARM in Greece are as below:

AF ARM Used tires Fly ash Sludge from refineries Blast furnace and other types of slag Sewage Sludge (Psittalia) Other (Iron mill scale, Waste bauxite, RDF Pyrite ashes, Chemical gypsum) Biomass Impregnated sawdust

slide-11
SLIDE 11

Energy and Environment Consultants Energy and Environment Consultants

WORKSHOP 16th May 2007, Athens “Alternative Fuels and Alternative Raw Materials in the Cement I ndustry” 11

ALF-CEMI ND Supporting the use of alternative fuels in the cement industry Contract No: 20118

  • AF & ARM producers in Greece

Steel industry, Coal power plants, Landfills, Sewage treatment plants, Food industry, Used tires, Other industrial premises, Hospitals

  • Service providers

– Companies set-up to collect and pre-process wastes up to certain level – Storage, handling and transportation companies

  • Market prospects

Expected increase of market volume as a result of: – legislative reforms – the need for fuel cost reduction by the cement industry – The urgent need for solutions to waste management problems (e.g. environmental pollution, municipal solid waste disposal, sewage sludge management, etc.)

Waste market conditions

slide-12
SLIDE 12

Energy and Environment Consultants Energy and Environment Consultants

WORKSHOP 16th May 2007, Athens “Alternative Fuels and Alternative Raw Materials in the Cement I ndustry” 12

ALF-CEMI ND Supporting the use of alternative fuels in the cement industry Contract No: 20118

Key barriers I

  • Time-consuming licensing procedures
  • Not fully implemented national waste management plan
  • No financial and/or other incentives. (For instance, in other EU

countries Cement Industry is being paid to incorporate AF and/or ARM from other industrial companies in contrast with the current status in Greece)

  • Immature market. There are not waste management companies

for all types of waste that can be utilized by the Cement Industry

slide-13
SLIDE 13

Energy and Environment Consultants Energy and Environment Consultants

WORKSHOP 16th May 2007, Athens “Alternative Fuels and Alternative Raw Materials in the Cement I ndustry” 13

ALF-CEMI ND Supporting the use of alternative fuels in the cement industry Contract No: 20118

Key barriers I I

  • Not adequate infrastructure - waste collection systems
  • No environmental costs of waste disposal - Illegal landfilling
  • National environmental targets vs. Local community concerns
  • Small number of cement plants (limited demand) – Uncertainty

to the waste supply side

  • The relevant investments, even economically attractive, are very

demanding in terms of capital and labour.

slide-14
SLIDE 14

Energy and Environment Consultants Energy and Environment Consultants

WORKSHOP 16th May 2007, Athens “Alternative Fuels and Alternative Raw Materials in the Cement I ndustry” 14

ALF-CEMI ND Supporting the use of alternative fuels in the cement industry Contract No: 20118

Legislative-Regulatory Framework I

  • Use of AF and ARM in the Greek cement industry is treated

within the Waste Management legislation

  • A number of Laws and Decisions have been adopted, regarding

Waste Management

  • Greek Legislation follows the EU Directives
  • AF and ARM are treated within this legislation*
  • Nevertheless, the current use of AF and ARM in Greece is

negligible due to poor enforcement mechanisms and specific policies

* JMD 22912/1117/2005 “requirements for incineration and co-incineration of waste”

slide-15
SLIDE 15

Energy and Environment Consultants Energy and Environment Consultants

WORKSHOP 16th May 2007, Athens “Alternative Fuels and Alternative Raw Materials in the Cement I ndustry” 15

ALF-CEMI ND Supporting the use of alternative fuels in the cement industry Contract No: 20118

  • The use of AF and/or ARM in existing plants requires

amendment of environmental licenses* Environmental I mpact Assessment (EI A)

  • A new EIA study is required outlining all the measures taken so

as to ensure:

– Conformity with JMD 22912/1117 – Heat Recovery Maximization – Flue gas handling conformity with the Law – Minimization of hazardous impacts of residues

* According to JMD 22912/1117 of 6-6-2005, cement kilns are classified as co- incineration units.

Legislative-Regulatory Framework I I

slide-16
SLIDE 16

Energy and Environment Consultants Energy and Environment Consultants

WORKSHOP 16th May 2007, Athens “Alternative Fuels and Alternative Raw Materials in the Cement I ndustry” 16

ALF-CEMI ND Supporting the use of alternative fuels in the cement industry Contract No: 20118

Waste Disposal Permit* Specifies:

  • Types and quantities of waste streams
  • Includes detailed engineering design/operation modes
  • Measuring systems
  • Reclamation measures

* Disposal Permit is issued by the competent Prefecture, according to JMD 50910/2003.

Legislative-Regulatory Framework I I I

slide-17
SLIDE 17

Energy and Environment Consultants Energy and Environment Consultants

WORKSHOP 16th May 2007, Athens “Alternative Fuels and Alternative Raw Materials in the Cement I ndustry” 17

ALF-CEMI ND Supporting the use of alternative fuels in the cement industry Contract No: 20118

Legislative-Regulatory Framework I V

Handling The operator of the co-incineration unit is obliged to:

  • Take care of all protective steps during delivery and reception of

wastes so as to minimize the risk of any negative impact

  • Determine the quantities of each waste category according to

the European Wastes List

  • Carefully check their characteristics, so as to ensure compliance
  • f the unit with the requirements of the environmental licenses

Handling procedures to be observed

Checking the documents according to the applicable legislation and the European Regulation 259/1993 as currently applicable. Samples prior to delivery