Building (No SF Available)
by Architect to Reflect Functional and Code Requirements
Page 8 of 24
Requirements
Page 9 of 24
– 8,559 SF Increase – Includes Ticket Booth Area – Medical/Emergency Response Space – Storage Capacity Increased to Meet Program Needs
Page 10 of 24
– 6,782 SF Increase – Increased Seating (1,140 Vs 15323) – Storage Capacity Increased to Meet Program Needs – Show Ring Increased to Accommodate Program Needs
Page 11 of 24
Page 12 of 24
Page 13 of 24
Page 14 of 24
Page 15 of 24
The gopher frog is a species of frog in the Ranidae family, endemic to the Southeastern United States. It primarily inhabits the threatened sandhill communities, flatwoods, and scrub in the Atlantic coastal plain, where it is usually found near ponds.
Page 16 of 24
Description Amount General Design and Permitting ‐ A & E Services $ 1,137,900.00 Authorized Reimbursables ‐ A & E Services $ 42,457.00 Additional Reimbursables ‐ A & E Services $ 30,000.00 Pre‐Construction Services ‐ Construction Management at Risk $ 204,161.00 Construction Services ‐ Construction Management at Risk $ 1,250,000.00 Public Works Project Management (Gas Tax) $ 75,000.00 Contingency $ 1,000,000.00 Permits (MMTM, Fire Impact Fee, Building Permit, SJRWWD) $ 227,888.00 Land Acquisition (Reimbursement to Solid Waste) $ 253,094.00 Sub‐Total: $ 4,220,500.00
Page 17 of 24
Description Amount Construction Estimates (Base) Sitework (Includes all typical sitework cost(clearing/utilities/fill/paving, etc) plus the LID allowance, Site Lighting, Midway Power loop, Landscaping, Pole Barns, Animal Washdown shelter) $16,936,648.00 Auditorium/Offices $15,245,364.00 Beynon Preliminary Estimates – Portable Raised Banked Track $ 2,100,000.00 Folding Partitions (Add partitions in Auditorium to separate 1/3 of space into individual space and divide that 1/3 space in half) $ 902,545.00 Arena (Open Air with Enclosed Maintenance) $ 2,039,732.00 Off‐Site Improvements (NE 69th Avenue, Chip Seal NE 57th Street, Connection to Waldo Road) $ 775,000.00 Gopher Tortoises Relocation (60 EA) $ 120,000.00 Additional N ‐ S Roadway (Wetlands Extension) $ 50,000.00 Gopher Frog Crossings (2) $ 150,000.00 Sub‐Total: $38,319,289.00
Page 18 of 24
Description Amount Total Estimated Cost: $ 42,539,789.00 Budget: $ 25,000,000.00 Deficit: $(17,539,789.00)
Page 19 of 24
Description Amount 1 Complete Hardening of Auditorium (Tilt Walls) (Includes a reduction in Construction Duration of one month) $ 3,166,349.00 2 Hardening of Lower Portion of Auditorium (Approx. 5,000 SF) (Includes a reduction in Construction Duration of one month) $ 1,626,980.00 3 Change Open Air Arena to a fully enclosed, air conditioned Arena, with Bleachers and adding the Front Lobby $ 3,877,767.00 4 Add Asphalt Drive Aisles to the North Parking Lot and Adjacent Parking Lot $ 1,636,253.00 5 Change concrete plaza to Pavers $ 1,082,693.00 6 Skyfold Partitions (Add partitions in Auditorium to separate 1/3 of space into individual space and divide that 1/3 space in half) $ 1,545,550.00 7 Curtain Partitions (Add partitions in Auditorium to separate 1/3 of space into individual space and divide that 1/3 space in half) $ (737,648.00) 8 Single Building Option (Delete Arena completely and add 3,000 SF to Storage Room 154 for Maintenance Space Previously Accounted for in Arena) $ (1,478,224.00) 9 Mondo Preliminary Estimates – Portable Banked Track $ (200,000.00) 10 Beynon Preliminary Estimates – Portable Banked Track $ (400,000.00)
Page 20 of 24
Description Amount Available Funds in Fairground Fund (342) Budget $ 1,762,436.00 Transferred to Fairground Budget (342) at Mid‐Year fr General Fund (001) fr Excess Fund Balance $ 500,000.00 TDT Funds (002 & 168) Pledge of 3 Cents but Using 2 Cents to Repay for 30 Years Which is $1.7 Million/Yr $26,704,922.00 Sales Tax Pledge for 30 Years Which Will Reduce GF Revenue by Approximately $900,000 /Yr $13,572,431.00 Total: $42,539,789.00
Page 21 of 24
Executive Director Gainesville Sports Commission
Page 22 of 24
Page 23 of 24
Assistant County Manager Community and Administrative Services Alachua County Board of County Commissioners (352) 538‐8265 gpeebles@alachuacounty.us
Public Works Director Alachua County Public Works (352) 548‐1214 Cell: (863) 381‐6875 rgavarrete@alachuacounty.us