AGENDA REVIEW PROJECT BACKGROUND & PURPOSE REVIEW PROJECT FINDINGS REVIEW THE 4 OPTIONS DEVELOPED OPTION COMPARISONS REVIEW PROJECT SCHEDULE COMMUNITY COMMENTS / QUESTIONS TEAM Becker Morgan Group, Inc. (architectural
AGENDA
- REVIEW PROJECT BACKGROUND & PURPOSE
- REVIEW PROJECT FINDINGS
- REVIEW THE 4 OPTIONS DEVELOPED
- OPTION COMPARISONS
- REVIEW PROJECT SCHEDULE
- COMMUNITY COMMENTS / QUESTIONS
TEAM
Becker Morgan Group, Inc.
(architectural and site systems)
Gipe Associates, Inc.
(mech./elec./plumbing systems)
Morabito Associates, Inc.
(structural systems)
Wicomico County Board of Education Mardela Middle & High School Staff Citizens of Wicomico County
PROJECT BACKGROU OUND ND & & P PURPOS OSE
- MMHS identified in WCPS Facilities
Masterplan as next major project
- First step in the process was to
undertake Feasibility Study
- Understand building is functioning
now, looking for systemic & programmatic items that need to be addressed
- Develop Options for addressing
needs and completing the Feasibility Study
FEASIBILITY REPORT REQUIREMENTS
- MD School Construction Program Section 203
- Applies to all new construction and major renovation projects
- STATE REQUIRES A MINIMUM OF TWO OPTIONS BE
EXPLORED AND ASSIGNED COSTS
- Forty-year life cycle cost comparison of each option considered
- CONTENTS
- Executive Summary
- Summary Educational Specifications
- Proposed Budget
- Proposed Project Schedule
- Existing Facility Inventory Data
- Existing Condition of Site & Building Components
- Other Planning & Design Considerations
- Major and Minor Educational Program Advantages for all Options
- Local Board of Education Action
FLOOR PLAN: BUILDING TRANSFORMATION
SITE PLAN – AERIAL
EXISTING SITE
SUR URVEY F FINDINGS
SYSTEMS:
- Building envelope does not meet current energy code.
- Limited athletic event parking.
- Inadequate grading around building/portables.
- No major structural concerns.
- Mechanical systems at end of useful
service life.
- No fire suppression system.
- Outdated fire alarm and life safety systems.
- Inefficient/high consumption plumbing
fixtures.
- Electric gear beyond useful service life.
- Inadequate ceiling systems and lighting
levels.
SUR URVEY F FINDINGS
PROGRAM:
- No secure entrance vestibule (Planned for construction in 2019).
- Poor campus security.
- No separation of buses and vehicles.
- Nine portables support current instruction.
- Difficult to separate Middle and High School populations.
- Inadequate space to accommodate instruction and support
services.
- Gym Lobby used to support P.E.
program activities.
FLOOR PLAN – FACILITY FUNCTIONS
SPACE COMPARISONS
Space Description Administration Guidance Health Suite Instructional Programs Instructional Support Family and Consumer Science Art Education Computer & Business Education Technology Education Music Education Physical Education Media Center Student Spaces Foodservice Building Services Total NSF: Circulation & Wall NSF Total GSF: Existing 3,484 971 442 23,806 2,564 1,807 1,674 2,435 3,433 5,786 16,480 2,622
- 6,408
4,862 76,774 20,195 96,969 Proposed 3,700 1,300 960 24,100 9,750 1,700 1,600 2,000 2,900 7,140 22,650 5,200 2,200 6,800 6,190 98,190 41,976 140,166
Total existing NSF includes 9,330 SF in portable classrooms
OPTION 1 SITE UPGRADES
- REVISED PARKING LAYOUT – SEPARATE BUS/VEHICLE TRAFFIC
BUILDING UPGRADES
- HAZARDOUS MATERIAL ABATEMENT
- COMPLETE MECHANICAL SYSTEM UPGRADE
Air-Cooled Variable refrigerant Volume (VRV) System
- COMPLETE ELECTRICAL AND LIGHTING UPGRADES
- COMPLETE FIRE PROTECTION SYSTEM UPGRADES
- SELECT BUILDING ENVELOPE IMPROVEMENTS
- SELECT ADA UPGRADES
- ADD WALLS TO ENCLOSE 2 OPEN CLASSROOMS
OPTION 1 SITE
OPTION 1 FLOOR PLAN
SPACE COMPARISONS
Space Description Administration Guidance Health Suite Instructional Programs Instructional Support Family and Consumer Science Art Education Computer & Business Education Technology Education Music Education Physical Education Media Center Student Spaces Foodservice Building Services Total NSF: Circulation & Wall NSF Total GSF: Existing 3,484 971 442 23,806 2,564 1,807 1,674 2,435 3,433 5,786 16,480 2,622
- 6,408
4,862 76,774 20,195 96,969 Proposed 3,700 1,300 960 24,100 9,750 1,700 1,600 2,000 2,900 7,140 22,650 5,200 2,200 6,800 6,190 98,190 41,976 140,166 Option 1 3,484 971 442 23,806 2,564 1,807 1,674 2,435 3,433 5,786 16,480 2,622
- 6,408
4,862 76,774 20,195 96,969
OPTION 2 SITE UPGRADES
- REVISED PARKING LAYOUT – SEPARATE BUS/VEHICLE TRAFFIC
BUILDING UPGRADES
- ALL OPTION 1 SCOPE UPGRADES
- CONSTRUCT ADDITIONS AT MUSIC, GYM, AND ADMIN. AREAS
- RENOVATE SPACE FOR RELOCATION OF SOME BUILDING
FUNCTIONS
OPTION 2 SITE
OPTION 2 FLOOR PLAN
SPACE COMPARISONS
Space Description Administration Guidance Health Suite Instructional Programs Instructional Support Family and Consumer Science Art Education Computer & Business Education Technology Education Music Education Physical Education Media Center Student Spaces Foodservice Building Services Total NSF: Circulation & Wall NSF Total GSF: Existing 3,484 971 442 23,806 2,564 1,807 1,674 2,435 3,433 5,786 16,480 2,622
- 6,408
4,862 76,774 20,195 96,969 Proposed 3,700 1,300 960 24,100 9,750 1,700 1,600 2,000 2,900 7,140 22,650 5,200 2,200 6,800 6,190 98,190 41,976 140,166 Option 1 3,484 971 442 23,806 2,564 1,807 1,674 2,435 3,433 5,786 16,480 2,622
- 6,408
4,862 76,774 20,195 96,969 Option 2 3,414 1,390 1,060 24,694 3,592 1,807 1,674 2,056 3,433 6,132 21,673 2,622
- 6,408
5,162 85,117 21,656 106,773
OPTION 3 SITE UPGRADES
- REVISED PARKING LAYOUT – SEPARATE BUS/VEHICLE TRAFFIC
BUILDING UPGRADES
- ALL OPTION 1 & 2 SCOPE
- DEMOLISH MEDIA CENTER AND CLASSROOM WINGS
- CONSTRUCT A 2-STORY ADDITION FOR MEDIA CENTER,
CLASSROOMS & SUPPORT SPACES
- FULL ADA UPGRADES THROUGHOUT
OPTION 3 SITE
OPTION 3 FLOOR PLAN
SPACE COMPARISONS
Space Description Administration Guidance Health Suite Instructional Programs Instructional Support Family and Consumer Science Art Education Computer & Business Education Technology Education Music Education Physical Education Media Center Student Spaces Foodservice Building Services Total NSF: Circulation & Wall NSF Total GSF: Existing 3,484 971 442 23,806 2,564 1,807 1,674 2,435 3,433 5,786 16,480 2,622
- 6,408
4,862 76,774 20,195 96,969 Proposed 3,700 1,300 960 24,100 9,750 1,700 1,600 2,000 2,900 7,140 22,650 5,200 2,200 6,800 6,190 98,190 41,976 140,166 Option 1 3,484 971 442 23,806 2,564 1,807 1,674 2,435 3,433 5,786 16,480 2,622
- 6,408
4,862 76,774 20,195 96,969 Option 2 3,414 1,390 1,060 24,694 3,592 1,807 1,674 2,056 3,433 6,132 21,673 2,622
- 6,408
5,162 85,117 21,656 106,773 Option 3 3,575 1,390 1,060 26,264 10,290 1,807 1,674 2,056 3,433 6,132 21,673 5,200 2,600 6,408 7,700 101,332 41,761 143,093
OPTION 4 NEW SCHOOL
- NEW SITE REQUIRED
- LOCATION TBD / SITE UTILITY IMPACTS UNKNOWN
FLOOR PLAN
- CONCEPTUAL LAYOUT ONLY
- 140,166 GROSS SQUARE FEET PER IAC STATE REQUIREMENTS
- GEOTHERMAL HEATING & COOLING MECHANICAL SYSTEM
OPTION 4 FLOOR PLAN
SPACE COMPARISONS
Space Description Administration Guidance Health Suite Instructional Programs Instructional Support Family and Consumer Science Art Education Computer & Business Education Technology Education Music Education Physical Education Media Center Student Spaces Foodservice Building Services Total NSF: Circulation & Wall NSF Total GSF: Existing 3,484 971 442 23,806 2,564 1,807 1,674 2,435 3,433 5,786 16,480 2,622
- 6,408
4,862 76,774 20,195 96,969 Proposed 3,700 1,300 960 24,100 9,750 1,700 1,600 2,000 2,900 7,140 22,650 5,200 2,200 6,800 6,190 98,190 41,976 140,166 Option 1 3,484 971 442 23,806 2,564 1,807 1,674 2,435 3,433 5,786 16,480 2,622
- 6,408
4,862 76,774 20,195 96,969 Option 2 3,414 1,390 1,060 24,694 3,592 1,807 1,674 2,056 3,433 6,132 21,673 2,622
- 6,408
5,162 85,117 21,656 106,773 Option 3 3,575 1,390 1,060 26,264 10,290 1,807 1,674 2,056 3,433 6,132 21,673 5,200 2,600 6,408 7,700 101,332 41,761 143,093 Option 4 3,700 1,300 960 24,100 9,750 1,700 1,600 2,000 2,900 7,140 22,650 5,200 2,200 6,800 6,190 98,190 41,976 140,166
BUDGET / SCHEDULE COMPARISONS
Estimated Total Project Cost: Estimated Escalation (3% @ 4 yrs Option 1&2 / 3% @ 5 yrs Option 3&4): Estimated Total Project Cost with Escalation: Potential Project Start Date: Potential Project Duration: Estimated Gross Square Feet: OPTION 1 $23,105,000 $2,899,881 $26,004,881 2022 18 – 21 months 96,969 OPTION 2 $31,358,000 $3,935,705 $35,293,705 2022 30 – 33 months 104,909 OPTION 3 $61,948,000 $9,866,710 $71,814,710 2023 33 – 36 months 143,093 OPTION 4 $75,206,000 $11,978,366 +$87,184,366* 2023 21 – 24 months 140,166
* Site acquisition and utility upgrades excluded
Option 1: Limited Renovation
$26.0 M 96,969 SF
Option 2: Renovations / Minor Additions
$35.5 M 104,909 SF
Option 3: Renovations / Major Additions
$71.8 M 143,093 SF
Option 4: New Construction / Replacement
$87.2 M + Site/Util. 140,166 SF
OPTION COMPARISONS
Program
- Accommodates space types,
quantities & sizes
- Accommodates all program spaces
under one roof
- Accommodates preferred function
adjacencies
Facility Environment
- Existing structure constraints
- Site Circulation
- Building circulation efficiency
- Location
Construction Logistics
- Phased construction impacts to costs/
Swing space required during construction
- Project start date / Duration of
construction
- Site costs
- Overall project costs
PROJECT SCHEDULE
COMMUNITY INPUT
WAYS TO PROVIDE INPUT
- MAKE COMMENT TONIGHT
- EMAIL SUGGESTIONS TO:
comments@wcboe.org
- VOICEMAIL MESSAGE ON THE