AGENDA TTO follow up Run 11 -12 Goals Efficiency TTO FOLLOW UP P . Krejcik wrote a synopsis of the Twin Bunch TTO project. I started a TTO website (with a link to it from the Performance Program site)


slide-1
SLIDE 1

AGENDA

  • TTO follow up
  • Run 11 -12 Goals
  • Efficiency
slide-2
SLIDE 2

TTO FOLLOW UP

  • P

. Krejcik wrote a synopsis of the Twin Bunch TTO project.

  • I started a TTO website (with a link to it from the

Performance Program site)

https://portal.slac.stanford.edu/sites/lclscore_public/tto/SitePages/Home.aspx

slide-3
SLIDE 3

GOALS FOR NEXT RUN

  • Capability goals
  • Stability goals
  • Still missing Quality, Reproducibility, and Photon
slide-4
SLIDE 4

EFFICIENCY

1/21/16

slide-5
SLIDE 5

CONTROL ROOM REPORT

Efficiency 1.

  • perators doing work outside of daily operation - need to add management

(working on that) mainly using project driven priorities, who are the customers? Hardware: priority is very roughly in order of list 1. Motion control is really painful except undulator 2. Laser cathode profile reproducibility 3. Laser motion control system is unreliable: steering and feedbacks, hysteresis, home is lost, resolution is poor for needs 4. Ability to recover from klystron cycles: feedback go wild, 6x6 is dumb (continued)

slide-6
SLIDE 6

5. Klystron reliability / trip rate 6. Modulator upgrade fallout 7. Weak steering software: LTU feedback and steering, jitter, dispersion correction is lost 8. LLRF is not too bad according to Stanek - failure modes are difficult to detect 9. Timing system is ok: laser timing / phase timing; some new improvement is well liked: Frisch and Justin

  • 10. Dispersion correction is poor. routines don’t converge and don’t cover

many areas of the beamline

  • 11. Lutman setups are too hard
  • 12. Need more one button push stuff
  • 13. Flow charts for special setups would be helpful
  • 14. Changing matrices when changing energies should be automatic: no hooks

for model

  • 15. MPS just trips instead of rate recovery, some project is going but it

taking years

  • 16. Phase error masked by feedback corrections
slide-7
SLIDE 7
  • Assign one LFD person to each item and ask

them to find out what the underlying issue is and what solutions are possible.

WHAT CAN WE DO