age nda
play

Age nda Climbing wall design considerations Review of a climbing - PDF document

E c onomic s of Climbing Wall De sign Age nda Climbing wall design considerations Review of a climbing gym layout Analyze the ROI of the design and options Indoor Climbing Style s No n ro pe d c limbing He ig ht limite d T rave rsing , no


  1. E c onomic s of Climbing Wall De sign Age nda Climbing wall design considerations Review of a climbing gym layout Analyze the ROI of the design and options Indoor Climbing Style s No n ro pe d c limbing He ig ht limite d T rave rsing , no n to p-o ut and to p-o ut style s po ssible Applic able to le ss than ve rtic al, Applic able fo r ve rtic al to ve rtic al and mo de rately o ve rhang ing o ve rhang ing te rrain te rrain No t re c o mme nde d fo r le ss than ve rtic al terrain

  2. Climbing Wall De sign T hings to c onside r • Volume • He ight • L ayout • Pr ogr amming • Climbing L ane ROI Volume Basic c limbing te r r ain c ate gor ie s Mo re vo lume = Mo re vo lume = de c re ase d te rrain inc re ase d te rrain diffic ulty diffic ulty* *T he c o mbinatio n o f c limbing te rrain and ro ute se tting de te rmine the final c limbing diffic ulty Volume Mor e fe atur e s Ab rupt fe ature s add mo re vo lume vs. subtle transitio ns

  3. Volume E stimating c limbing sur fac e with fac tor s *Only c limbing surfac e c alc ulate d in e xample s. F inal c alc ulatio n do e s no t inc lude side re turns. He ight T ypic al wall he ights He ight Rope d walls - Is talle r be tte r ? I de al he ig ht fo r ro pe d c limbing walls falls within 30’ to 40’

  4. He ight Boulde r ing walls • Climbe rs c o ntinue to push the limit o n bo ulde ring he ights • So me indo o r bo ulde ring walls are pushing 18’ • Highe r e xpo sure to risk • Balanc e c o st – flo o ring c o nside ratio ns • Barrie r to e ntry L ayout T r affic flo w • Ho w me mbe rs mo ve thro ugh the spac e • Whe n po ssible , de signate traffic lane s ~4’ - 5’ wide • F all zo ne s and gathe ring spac e s • Ac c e ss to ame nitie s L ayout Se par ating diffic ulty

  5. L ayout Be laye r move me nt Pr ogr amming Staff Hir ing and T r aining • Selec ting the r ight staff • T r aining for membe r r e tention • F ac e o f c limbing wa ll • T ruste d so urc e o f info rmatio n • Re duc e barrie r to e ntry fo r ne w c limbe rs Pr ogr amming Ongoing pr o gr amming o ptions • T ar ge ting spe c ific de mogr aphic s – sur ve y your membe r s • Wor king with loc al sc hools • Pr omoting outdoor c limbing • Bir thday par tie s • Be c r e ative

  6. Climbing L ane R OI Me asur ing Capac ity Programming Wall Capacity = (Linear Feet) / 4 x 2 Climbing L ane R OI Me asur ing Capac ity Top Rope Capacity = (Linear Feet) / 6 x 2 (# climbers) Climbing L ane R OI Me asur ing Capac ity Bouldering Capacity = (Linear Feet) / 8 x 3

  7. Q & A Leslie Rasch Sales Manager Eldorado Climbing Walls 303-447-0512 x109 leslier@eldowalls.com www.eldowalls.com

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend