F ORT W ORTH D ISTRICT City of Fort Worth Community Meeting Southeast Connector Photo by Liam Frederick I-20, I-820 & US 287 September 15, 2018 Age genda da 1 Southeast Connector Study Area 2 Project History, Issues, and Constraints
Southeast Connector Study Area Project History, Issues, and Constraints Study Goals & Objectives Recommended Alternative Public / Agency Outreach & Involvement July 19, 2018 Public Meeting – Stats & Feedback Project Schedule
1 2 3 4 5 6 7
Age genda da
Project Contact Information Questions
8 9
1
– From Forest Hill Drive To Park Springs Boulevard – From I-20 To Brentwood Stair Road – From Bishop Street To Sublett Road
I-820 820 US 287 87 I-20 20
Southea east st Co Connect ctor Stud tudy A Are rea
2
Began May 2000 April 19, 2001 Public Meeting #1 December 11, 2003 Public Meeting #2 March 2005 Draft Environmental Assessment December 2005 Design included Reversible Managed lanes Funding and Environmental Constraints
April 2016 to Present Day
- Update Previous Study
- Evaluate Alternatives
- Analyze Future Traffic
- Integrate with Mobility 2045
- Produce Preliminary Design
- Produce Environmental Assessment
Environmental Constraints Air Quality Conformity Metropolitan Transportation Plan (MTP) Consistency Funding Constraints Contract Issues
Pr Project ct His History
May 2001 Value Engineering Report / Draft Preliminary Design
3
* Congestion Index is based on a percent increase in travel time.
Source: MTP1 Draft Mobility 2045, NCTCOG
Year 2 204 045
No No-Buil ild S Scenar ario io
Year 2 204 045
MT MTP1 Build ld S Sce cenario
St Study Ar Area
Con
- nge
gestion stion L Levels s / De Dela lay
1 Metropolitan Transportation Plan (MTP)
Year 2 2018
Curren rent C Conges gestion
Congestion Index*
No Congestion Light Congestion Moderate Congestion Severe Congestion
4
Traffic Pr c Project ctions ns
251,500 191,200 140,950 182,250 102,900 94,200 348,800 259,900 194,600 255,600 146,500 134,200 394,400 292,300 220,400 289,700 167,300 153,400
50,000 100,000 150,000 200,000 250,000 300,000 350,000 400,000 450,000 I-20 (I-820 to US 287) I-20 (US 287 to Park Springs) I-820 N (Brentwood Stair to US 287) I-820 S (US 287 to I-20) US 287 N (Bishop to I-820) US 287 S (I-20 to Sublett)
2010 2030 2040 *2045 Traffic
Projections are currently being developed
* Years 2 2010 t 0 to 2040 040
Vehi hicles P Per r Day
Sour urce: e: T TxDOT T TP& P&P P Division,
- n, 2009
2009
56% 56% Increase
5
- 5,460 Crashes
- 47 Fatalities
- A main goal of the
project is to improve safety
From 20 2010 0 to 20 2016
Cr Crash Hi History & & Co Conce ncent ntration
6
St Stud udy A y Area Con
- nstr
strain ints ts Map Map
7
- Improve Safety
- Improve Mobility
- Improve Operations
- Provide Transportation Options
- Develop Safe Transportation Solutions
- Update and Modernize a Design from the early 1960s
St Stud udy y Goals ls & Obj & Object ctiv ives
8
Reco comme mmend nded A Alt lterna native
- Reconstruct existing interchanges
- Add general purpose lanes
- Construct collector-distributor road systems
Along ng I I-20 between I I-820 820 an and US 28 d US 287 Along ng I I-820 820 between I I-20 20 an and US 28 d US 287
- Reconstruct and add general purpose lanes
Through ghout th the P e Project S Stu tudy L y Limits
- Reconstruct interchanges
- Widen or Reconstruct general purpose lanes
- Modify ramp locations
- Eliminate left-hand exits
- Reconstruct frontage roads with shared use lanes
- Add sidewalks
9
Reco comme mmend nded A Alt lterna native
IMPROVE MOBILITY IMPROVE OPERATIONS IMPROVE SAFETY PROVIDE TRANSPORTATION OPTIONS DEVELOP SAFE TRANSPORTATION SOLUTIONS
CAR
MASS TRANSITADA
PED. & BIKEThe recommended alternative DO DOES NO NOT include tolled managed or express lanes.
10
- TWG M
G Meeting ngs
- Representatives from Agencies,
Local Governments, Chambers
- f Commerce, Schools:
- TxDOT
- FHWA
- NTTA
- Trinity Metro
- NCTCOG
- FWISD, AISD, KISD
- Tarrant County
- Cities (Arlington, Forest Hill
Fort Worth, Kennedale, and Mansfield)
- Southeast Tarrant
Transportation Coalition
- Others
- Publi
lic Me Meeting – Open House Format; Recommended Alternative and Alternatives Considered
- Publi
lic H Heari ring – Formal Presentation describing the Preferred Alternative and Environmental Studies
- Advertisements
- Legal N
l Notices
- Pre
ress R Releases
- Public I
c Input
- Pu
Public ic Co Comment
- Project Website through
www.txdo xdot.gov Keyword Search: So Southeast st Co Connector
- Newsletters
- Mailing List
- Postcards
- On-call Presentations /
Briefings
- Meetings with Affected
Property Owners (MAPOs)
- Workshops
Techn hnical W l Work Group (T (TWG) G) Pub ublic M ic Meetin ing & & Hearing ing Othe her O r Outre reach
Publi Public c / A / Agency Out ncy Outreach & & In Involv lveme ment nt
11
- 273 Attended
- 203 General Public
- 14 Elected Officials
- 56 Project Representatives
- 174 Written Comments
- 33 Received at Meeting
- 115 E-mailed
- 26 Mailed
Jul July y 19, 20 9, 2018 Publ Public c Meeting ng – Quick Quick St Stats
12
Futu ture P Public H Hea earing On-Ca Call P Present ntatio ions
Publi Public c In Input ut Co Cont ntinue ues
Town wn H Hall Me Meetings Me Meeting wi with P h Prope
- perty O
Own wners Wor
- rkshop
shops
13
– 88 Comments
Co Comments in in St Study Area
– 49 Comments – 25 Comments – 51 Comments
NB B Entran ance R Ram amp f from M m Meado adowbrook SB E SB Entran ance R Ram amp f from Br m Brentwood St Stair air Noise se W Wal all St Study dy Cr Crai aig St Street Br Bridg idge A Access ss / / Ped d Br Bridg idge
14
Northbou
- und E
Ent ntranc nce R Ramp f from
- m M
Meadowbrook
- ok
North
Proposed Removal of Northbound I-820 Entrance Ramp from Meadowbrook Dr.
Meadowbrook Dr. I-30 15
Northbou
- und E
Ent ntranc nce R Ramp f from
- m M
Meadowbrook
- ok
WHY? Y? – Con
- ngesti
tion a and Sa Safety – Conflicts with Exit to Brentwood Stair and I-30 Direct Connections causing heavily congested weaving movements and accidents – Distance between ramps near minimum spacing lengths described in roadway design guidelines
16
Northbou
- und E
Ent ntranc nce R Ramp f from
- m M
Meadowbrook
- ok
PR PROPO POSED ED A ALTER TERNATE R TE ROUTES ES A. Head south toward Lancaster Ave, use the improved U-turn lane, and take northbound I-820 entrance ramp
North
Meadowbrook Dr. I-30
- E. Lancaster Ave.
Craig St. UP Railroad
A
17
Northbou
- und E
Ent ntranc nce R Ramp f from
- m M
Meadowbrook
- ok
North
Craig St. 18
Texas U-Turn No Signal
PR PROPO POSED ED A ALTER TERNATE TE RO ROUTE A
Entrance Ramp
Northbou
- und E
Ent ntranc nce R Ramp f from
- m M
Meadowbrook
- ok
PR PROPO POSED ED A ALTER TERNATE R TE ROUTES ES
- B. Head north through Brentwood Stair Rd intersection to go north on I-820 or
east on I-30
North
Meadowbrook Dr. I-30
- E. Lancaster Ave.
Craig St. UP Railroad
B
19
Northbou
- und E
Ent ntranc nce R Ramp f from
- m M
Meadowbrook
- ok
PR PROPO POSED ED A ALTER TERNATE R TE ROUTES ES
- C. Head toward Brentwood Stair Rd and Bridgewood Dr to go west on I-30
North
Meadowbrook Dr. I-30
- E. Lancaster Ave.
Craig St. UP Railroad
C
20
Northbou
- und E
Ent ntranc nce R Ramp f from
- m M
Meadowbrook
- ok
PROPOSED ED A ADDITIO IONA NAL ALTERNA RNATIVES ES T TO B BE EVALUATED ED – No-Build (Do Nothing) – Adding entrance ramp from Meadowbrook Dr and exit ramp to Brentwood Stair Rd as they currently exist – Adding entrance ramp from Meadowbrook Dr and removing the exit ramp to Brentwood Stair Rd – Removing the exit ramp to Brentwood Stair Rd but adding a northbound bypass front ntage r road l d lane for Brentwood Stair Rd under Meadowbrook Dr bridge – Adding braid ided r ramps ps (ramps that are bridged, one over the other) for entrance from Meadowbrook Dr and exit to Brentwood Stair Rd Evaluate all alternatives for right-of-way impacts*, mobility, and traffic operations for safety. *Most of these alternatives would require additional right-of-way.
21
Example o le of “Byp ypass F Front ntage R Road L d Lane”
- Nor
- rthb
hbound US 75 75 at L Legacy cy Dr r in Pl Plano
Image from Google.com street view
Frontage Road
22
Exampl ple o e of “Braid ided ed R Ramps ps”
- Eastbou
- und I
I-30 e 30 exit it to N
- Nola
- lan R
Ryan Expwy/ wy/Baird F Farm rm Rd Rd/ A / AT&T W T&T Way in Arli Arlington
Image from Google.com street view
Exit Ramp Entrance Ramp Bridge
23
Proposed Removal of Southbound I-820 Entrance Ramp from Brentwood Stair Rd.
North
WHY? Y? – Con
- ngesti
tion a and Sa Safety – Conflicts with I-30 Direct Connections and Exit Ramp to Meadowbrook Dr causing heavily congested weaving movements – Distance between ramps near minimum spacing lengths described in roadway design guidelines
Sout
- uthbou
- und E
Ent ntrance R Ramp f from Brent ntwoo
- od Stair
Meadowbrook Dr. Craig St. 24
PR PROPO POSED ED A ALTER TERNATE R TE ROUTE – Head south through Meadowbrook Dr. and take improved entrance ramp to southbound I-820
North
Meadowbrook Dr.
- E. Lancaster Ave.
Craig St. UP Railroad
Sout
- uthbou
- und E
Ent ntrance R Ramp f from Brent ntwoo
- od Stair
25
PR PROPO POSED ED A ALTER TERNATE TE RO ROUTE
Sout
- uthbou
- und E
Ent ntrance R Ramp f from Brent ntwoo
- od Stair
26
North
Meadowbrook Dr.
Texas U-Turn = Improved Signal Operations
PROPOSED ED A ADDITIO IONA NAL ALTERNA RNATIVES ES T TO B BE EVALUATED ED – Adding entrance ramp from Brentwood Stair Rd with ramps as they currently exist – Adding braid ided r ramps ps (ramps that are bridged, one over the other) for entrance ramp from Brentwood Stair Rd and exit ramp to Meadowbrook Dr – Removing entrance ramp from Brentwood Stair Rd but adding a southbound bypass front ntage r road l d lane under Meadowbrook Dr to access southbound entrance ramp Evaluate all alternatives for right-of-way impacts*, mobility, and traffic operations for safety. *Most of these alternatives would require additional right-of-way.
Sout
- uthbou
- und E
Ent ntrance R Ramp f from Brent ntwoo
- od Stair
27
Existing Pedestrian Bridge to be removed
North
Craig aig Street B Brid idge A Access / / Ped Brid idge
Proposed Craig St. Bridge
Meadowbrook Dr.
- E. Lancaster Ave.
Craig St. 28
– Existing pedestrian bridge to be removed because of vertical clearance/height conflicts – Potential conflicts with overhead/high mast power lines – Potential pedestrian bridge meeting American with Disability Act (ADA) requirements expected to be very long and high over roadway
Craig aig Street B Brid idge A Access / / Ped Brid idge
Image from Google.com street view Looking South on I-820 29 Power lines Pedestrian Bridge
– Existing Craig Street bridge has narrow sidewalks
Craig aig Street B Brid idge A Access / / Ped Brid idge
30 Image from Google.com street view Looking West on Craig Street
– Proposed Craig Street bridge would be wider with shared use lanes (cars and bikes) and wide sidewalks
Craig aig Street B Brid idge A Access / / Ped Brid idge
Proposed Craig St. Bridge: 1 shared use lane in each direction with Wide Sidewalks / Paths (see typical section below)
31
Proposed Craig Street
ADDI DDITIONAL ALTERNATIVE TO B BE E EVALUATED – Plan for pedestrian facilities or bridge meeting ADA requirements
Craig aig Street B Brid idge A Access / / Ped Brid idge
Evaluate alternative for right-of-way impacts*, mobility, and traffic operations for safety. *This alternative would require additional right-of-way.
32
– Noise Analyses would be conducted for entire study limits along I-20, I-820 and US 287 – Noise Abatement would be evaluated for all areas that have noise impacts
Nois ise Analyse ses
33
Example Noise Walls
Pr Project ct Sche Schedule ule
34
Tha Thank nk You u for Attend nding!
Pr Proje
- ject C
t Cont
- ntac
act I t Inf nformat
- rmation
ion
www www.t .txd xdot.gov v Se Search ch f for: “ “So Southeast Co Connector” 817 17-37 370-680 6807 SoutheastCon
- nnector@
- r@txdot.g
.gov Curtis Loftis, P.E. TxDOT Project Manager Southeast Connector TxDOT Fort Worth District 2501 S.W. Loop 820 Fort Worth, TX 76133 Naser Abusaad, P.E., AICP Consultant Project Manager Southeast Connector Civil Associates, Inc. 9330 LBJ Frwy., Ste. 1150 Dallas, TX 75243