ADDRESS sertco@yahoo.com , www.sertoil.com Basrah Site Camp and - - PowerPoint PPT Presentation

S E RT T COM OMPA PANY NY LT LTD. D. FO FOR OI OIL L SER SERVI VICES CES 1- Background SERT CO. LTD. For Oil services is a private entity established in Iraq with headquarters in Baghdad and its subsidiaries in UAE Dubai and in


slide-1
SLIDE 1

SERT

T COM OMPA PANY NY LT LTD.

  • D. FO

FOR OI OIL L SER SERVI VICES CES

slide-2
SLIDE 2
  • SERT CO. LTD. For Oil services is a private entity established in Iraq

with headquarters in Baghdad and its subsidiaries in UAE –Dubai and in Istanbul – Turkey

  • SERT was established with a vision of serving E&P operators as an

EPCC contractor

  • SERT Delivers a wide range of services, including:
  • EPC
  • Project Managements Consultancy
  • Site surveys
  • Procurement
  • Installation, Erection and Construction
  • Pre-commissioning, testing & commissioning
  • HAZOP Studies
  • Material Selection report for New Project

1- Background

slide-3
SLIDE 3
  • Baghdad Head office

AL Watheq Sq. P.O.Box: 3055 AL-Elweya-Baghdad-Iraq Phone: +964 7830877779 sertco@yahoo.com , www.sertoil.com

  • Basrah Site Camp and Workshops

North Rumaila- Basrah-Iraq Phone: +964 7830877779

  • Missan Site Camp

Halfaya Oil Filed-AL-Kahla- Missan- Iraq Phone: +964 7830877779

  • Missan Site Camp

BUZURGAN Oil Filed-Missan- Iraq Phone: +964 7830877779

ADDRESS

slide-4
SLIDE 4

Certification

SERT has the following Certification

  • ISO 9001 :2015(Quality Managements System), QMS is ISOs Standard set for organization management System
  • ISO 14001: 2015 ( Environmental Management System), EMS, among other things, enables us to identify and control the

environmental impact of our activates.

  • OHSAS 18001:2007 (Occupational Health & Safety Managements System) to control occupational health and Safety risks
  • ISO/ TS 29001:2010, SOC EPCC for Energy , Natural Gas and Petroleum Facility

2- Details

slide-5
SLIDE 5

3-References SERT works as EPCC contractor with Following companies SERT works with the following main vendors

slide-6
SLIDE 6
  • Source water treatment Plant

Complementary basic design and full detail design of SWP in Halfya oil filed (Total Capacity 23,500 M3/d) consist to the following

  • Water Intake System
  • Source Water Treated System
  • Clean Water Transport System
  • Fire Fighting System
  • Utility System
  • Power Distribution System
  • Instrumentation & Control System,
  • OCC SCADA System.
  • Telecommunication System

4- Completed Sample Projects by SERT

slide-7
SLIDE 7
slide-8
SLIDE 8
slide-9
SLIDE 9
slide-10
SLIDE 10
slide-11
SLIDE 11
  • Central Process Facility Expansion CPF

Complementary basic design and full detail designs of CPF1 Expansion in Halfya oil filed consist to the following

  • Expansion the main Production header
  • Installation new 2 multi flow valve selector
  • Installation SDV System
  • Installation & commissioning Scada and DCS system
slide-12
SLIDE 12
slide-13
SLIDE 13
  • Manufacturing and Erection of Crude oil Tanks

Complementary basic design of 4X5000 m3 and 4x10000 m3 crude oil Tanks in Basra consist to the following

  • Manufacturing and Erection
  • Installation of gas boot System
  • Installation of foam pump
  • Installation of spray and foam units
  • Installation of LP fuel gas scrubber
  • Installation of water draw-off pump
slide-14
SLIDE 14
slide-15
SLIDE 15
  • POWER SUPPLY TO WELL PADS FOR FCP SUSTAINED PROJECT

Complementary detail design of OHTL in Halfya oil filed consist to the following:

  • Pre-fabricated outdoor substation (POS)
  • Auxiliary facilities
  • 33 kV OHTL
  • T-off of power line to pad/wellheads
  • Power distribution system
  • MV/LV Cable system
  • Lighting system
slide-16
SLIDE 16
slide-17
SLIDE 17
  • OIL AND GAS TRUNK LINES

Complementary full detail design of 130 KM (24”, 20”, 18” & 12” ) Trunk lines

  • Installation launcher & receiver
  • Installation Cathodic protection System
  • Installation FOC and connecting with RTU
  • Nitrogen Injection
  • Pigging & Cleaning
slide-18
SLIDE 18
slide-19
SLIDE 19
slide-20
SLIDE 20

SERT STRATEGY AND GOAL

  • CONCENTRATE ON THE COMPLETION TARGET DATE
  • FOLLOW COMPANY INSTRUCTIONS
  • TAKING OFFICE WORK PARALLEL TO PHYSICAL ACTIVITIES
  • DEPENDING ON THE WORK INTENSITY, SERT HAS FLEXIBILITY TO INCREASE THE NUMBER OF STAFF

AND EQUIPMENTS AS NECESSARY

  • SERT IS PLANING AND IMPLEMENTING ACCORDINGLY
  • METEOROLOGICAL CONDITION (HEAVY RAIN STORMS), CUSTOM CLEARANCE PROBLEMS, VISA

PROBLEMS OF EXPAT WORKERS IS NOT OF ANY CONCERN FOR SERT. ALL THESE PROBLEMS INCLUDED IN THE SERT PLANS