Accommodation Review Meeting
Public Meeting Owen Sound Area Group of Schools
Thursday, December 3, 2015 OSCVI
AR 2015.16-02
Accommodation Review Meeting Public Meeting Owen Sound Area Group - - PowerPoint PPT Presentation
Accommodation Review Meeting Public Meeting Owen Sound Area Group of Schools Thursday, December 3, 2015 OSCVI AR 2015.16-02 Agenda Welcome and Introductions 1. Facilitator & Chair 2. Student Accommodation Review Process 3. a. Board
AR 2015.16-02
1.
2.
3.
a. Board Policy 3101-D – Accommodation Review b. Initial Staff Report AR 2015.16-02 c. School Information Profiles
Records of meetings will be kept Minutes & documentation posted to board’s website Public may make written submission to board staff Delegations – advise board staff of intent to present
Presentations are limited to 5 minutes See the board website for more information
That Bluewater District School Board commence an accommodation review on the Owen Sound Area Group of Schools (Alexandra Community School, Bayview Public School, Derby Public School, Dufferin Elementary School, Hillcrest Elementary School, Keppel-Sarawak Elementary School, Owen Sound Collegiate and Vocational Institute, Sydenham Community School, and West Hill Secondary School) in accordance with BP3101-D.
That the grade 7 and 8 program in the Owen
That Bayview Public School, Derby Public School
Average utilization was 70.8% in 2014-15 1470 excess student spaces 2013-14 deficit for school operations ~ $66,000 $49M renewal work needed over next 5 years Board receives $8.2M annually for all 53 schools
*Source – Ministry of Education
Enrolment is expected to decline from 270 students to 226 (60%
to 50%) over the next 10 years
Accommodating grade 7 and 8 students in the secondary schools
would further reduce utilization to 40%
5 year facility renewal costs are $4.8M with a Ministry Facility
Condition Index (FCI) of 51.2%
Operation costs exceeded revenue by 4% in 2013-14 Majority of the students would be accommodated at Sydenham
Community School and Alexandra Community School, with some attending Hillcrest Elementary School
Close Bayview - closure would result in potential savings of $4.8M
in school renewal costs, approximately $230K per year in school
Enrolment is expected to decline from 199 students to 175
(71% to 63%) over the next 10 years
Accommodating grade 7 and 8 students in the secondary
schools would drive utilization to 50%
5 year facility renewal costs are $4.6M with a FCI of 71.7% Operation costs exceeded revenue by 23% in 2013-14 Students would be accommodated at a combination of Hillcrest
Elementary School, Arran-Tara Elementary School or Hepworth Central Public School
Close Derby - closure would result in potential savings of
$4.6M in school renewal costs, approximately $190K per year in school operation costs and reduce surplus space by 279
Enrolment is expected to decline from 225 students to 188 (87%
to 73%) over the next 10 years
Lowest capacity in the Owen Sound Area Group of Schools at 259
spaces
Close to larger underutilized schools Hillcrest Elementary School
and Keppel-Sarawak Elementary School
5 year facility renewal costs are $2.3M with a FCI of 37.5% Operation costs exceeded revenue by 5% in 2013-14 Site is challenging for drop off and pick ups Students would be accommodated at Hillcrest Elementary School Close Dufferin - closure would result in potential savings of $2.3M
in school renewal costs, approximately $170K per year in school
Enrolment is expected to decline from 529 students to 457 (81%
to 70%) over the next 10 years
It is recommended the grade 7-8 program be moved to West Hill
Secondary School
Receiving school for a portion of enrolment from the Bayview,
Derby and Dufferin closures (total approximately 331 students) resulting in a 88% projected utilization
Hillcrest is a larger, older school with a capacity of 657, an FCI of
72.5% and significant renewal needs of $9.3M. It is recommended that the board consider submitting a business case to the Ministry
OWEN SOUND GROUP OF SCHOOLS
2016-17 PRE-ARC CAPACITY PROJECTED UTILIZATION PROJECTED 2016-17 ADE 2
3 TO
ALEX TO HIL TO KEP TO SYD TO HEP TO TARA TO WHSS ELEM TO OSCVI ELEM
TOTAL IN POST ARC ADE POST ARC CAPACITY POST ARC UTILIZATIO N ELIMINATE D SPACES
ALEXANDRA 271 82% 221
31 200 271 74% BAYVIEW 452 55% 247
0% 452 DERBY 279 65% 182
0% 279 DUFFERIN 259 82% 212
0% 259 HILLCREST 657 77% 506
331 580 657 88% KEPPEL-SARAW 377 85% 319 319 377 85% SYDENHAM 590 82% 483
109 505 576 88% 14 OSCVI ELEM 0% 138 138 184 75% OSCVI 957 49% 471 471 789 60%
WHSS ELEM 0% 340 340 299 114% WHSS 1194 64% 761 761 921 83%
OSA TOTAL 5036 68% 3402 31 331 109 88 340 138 949 3314 4074 81.3% 962 HEPWORTH 568 52% 297 297 568 52% ARRAN TARA 389 61% 236 88 324 389 83% TOTAL 5993 66% 3935 1037 3935 5031 78% 962
1 ADE is Average Daily Enrolment 2 Projected 3 ALEX=ALEXANDRA; HIL=HILLCREST; KEP=KEPPEL-SARAWAK; SYD=SYDENHAM; TARA=ARRAN-TARA
Expected School Operations Results based on Recommendations 2014-15 2015-16* 2016-17* Total Revenue 3,499,312 $ 3,498,127 $ 3,148,485 $ Total Expense 3,682,788 $ 3,800,551 $ 3,108,207 $ Operating Surplus/(Deficit) (183,476) $ (302,424) $ 40,278 $
* based on projections
Improve utilization to 81.3% in 2016-17 Eliminate 962 (14%) surplus spaces Save estimate of $220,000 in annual school
Eliminate $11.7 M in school renewal costs at the
Opportunity to improve Bluewater District School
Review Alexandra Community School Bayview Public School Derby Public School Dufferin Elementary School Hillcrest Elementary School Keppel-Sarawak Elementary School Sydenham Community School Owen Sound Collegiate and
West Hill Secondary School
Attended by upper and lower tier municipal representatives
Reviewed consultation and involvement to date Discussion and comments New or additional planning data requested – some discussion
New or additional partnership opportunities were requested
Groups were asked to provided comment prior to the end of