Accelerates Energy Efficiency at Chevron Oronite Sivarajan - - PowerPoint PPT Presentation

accelerates energy efficiency at
SMART_READER_LITE
LIVE PREVIEW

Accelerates Energy Efficiency at Chevron Oronite Sivarajan - - PowerPoint PPT Presentation

Digital Transformation Accelerates Energy Efficiency at Chevron Oronite Sivarajan Sankaran, IoT & Projects Lead, Chevron Oronite, Singapore Jonas Berge, Senior Director Applied Technology, Emerson Automation Solutions, Singapore Chevron


slide-1
SLIDE 1

Digital Transformation Accelerates Energy Efficiency at Chevron Oronite

Sivarajan Sankaran, IoT & Projects Lead, Chevron Oronite, Singapore Jonas Berge, Senior Director Applied Technology, Emerson Automation Solutions, Singapore

slide-2
SLIDE 2

Chevron Oronite Singapore

  • Fuel and lubricant additives
  • Commissioned in 1999
  • Located on the Jurong Island

chemical hub

slide-3
SLIDE 3

Energy Efficiency: Steam Trap Monitoring

  • Challenge
  • Failure cause steam losses
  • Inefficient heat transfer, requiring more steam,

may lead to process upsets

  • Water hammer damage piping and flanges
  • Yearly steam trap surveys are too infrequent
  • Solution
  • On-premises steam trap monitoring sensors

and analytics

  • Result:
  • Reduced steam losses
slide-4
SLIDE 4

Energy Efficiency: Energy Management Analytics

  • Challenge
  • Lack of Energy Monitoring Dashboard

may lead to inefficiency and high energy costs

  • Solution
  • Steam consumption monitoring at

unit level

  • Analytics from historian
  • Result
  • Ability to pinpoint overconsumption

to troubleshoot effectively

slide-5
SLIDE 5

Safety: Access Control and Rescue Locating

  • Challenge
  • Manual paper-based sign-in / sign-out is disruptive

to operators

  • Physical fencing would hinder evacuation
  • People may stray outside assigned areas
  • Locating man-down requires large search party
  • Hard to manage contractors during high risk

activities such as start-up and shut-down

  • Solution
  • Real Time Locating System (RTLS)
  • Result
  • Faster locating of missing persons
  • Smaller search party
  • Effective geofencing
  • Good control of plant access
  • Increased contractor productivity
slide-6
SLIDE 6

Reliability: Pump and Compressor Monitoring

  • Challenge:
  • Critical equipment vibration causes

production downtime

  • Manual vibration data is time

consuming

  • Solution
  • Vibration sensors
  • Vibration analytics software
  • Result
  • Ability to predict failures
  • Increased reliability
  • Reduced maintenance cost
slide-7
SLIDE 7

Integrity: Corrosion Monitoring

  • Challenge:
  • Corrosion may lead to loss of

containment

  • Solution:
  • Corrosion sensors
  • Predictive analytics
  • Result:
  • Scheduling of pipe section

replacement

  • Help avoid loss of containment
slide-8
SLIDE 8

Productivity: Worker Mobility

  • Challenge
  • Incomplete and sometimes inaccurate

data capture using paper-based

  • perations surveillance
  • Access to procedures, P&IDs, and

maintenance request (SAP ERP) is only available in the control room

  • Most process and equipment data only in

the DCS (control room)

  • Solution
  • Tablets using Wi-Fi infrastructure to

access work orders, documents, and more

  • Result
  • Increased productivity
slide-9
SLIDE 9

Summary

  • Improved energy efficiency
  • Plant is a safer place to work
  • Increased reliability
  • Greater integrity
  • Improved productivity