About London Bay Started in 1990 Local Company, Local Management - - PowerPoint PPT Presentation

about london bay
SMART_READER_LITE
LIVE PREVIEW

About London Bay Started in 1990 Local Company, Local Management - - PowerPoint PPT Presentation

About London Bay Started in 1990 Local Company, Local Management & Local Ownership Excellent Team of 100 Professionals Reputation for: Integrity, Customer Service, Design, Professionalism & Financial Strength


slide-1
SLIDE 1
slide-2
SLIDE 2
slide-3
SLIDE 3
  • Started in 1990
  • Local Company, Local Management & Local Ownership
  • Excellent Team of 100 Professionals
  • Reputation for: Integrity, Customer Service, Design,

Professionalism & Financial Strength

  • “Blue Zone” Designated Company

About London Bay

slide-4
SLIDE 4

Deep expertise in the following areas:

  • Homebuilding & Design
  • Community Development
  • Experienced Development Team
  • Remodeling (LBH Renovation & Design)
  • Romanza Interior Design

About London Bay

slide-5
SLIDE 5
  • Teamwork
  • Respect
  • Integrity
  • Commitment
  • Quality

London Bay’s Core Values

slide-6
SLIDE 6
slide-7
SLIDE 7
slide-8
SLIDE 8
slide-9
SLIDE 9
slide-10
SLIDE 10
slide-11
SLIDE 11

MARINA – CURRENT STATUS

  • Dormant and defunct since 2014
  • Closed to the public
  • Current zoning requires only:
  • 8 public boat slips
  • 10 boat trailer parking spaces
  • One single ramp
  • Does not provide perpetual access
slide-12
SLIDE 12

Historical View of the Marina Property

slide-13
SLIDE 13

Current View of the Marina Property

slide-14
SLIDE 14

Marina Property (Past and Proposed)

slide-15
SLIDE 15
  • Access to the marina and Estero Bay dedicated to the

public forever

  • Boat ramp
  • 10 transient boat slips dedicated to public use
  • 2 slips dedicated to Emergency Services (fire and police)
  • 15 onsite boat trailer spaces with an additional 10 spaces

less than a half-mile away

  • 34 car parking spaces (includes parallel spaces)

Proposed Marina

slide-16
SLIDE 16
  • Ship store selling bait, ice, drinks, and snacks
  • Public restrooms
  • ADA-accessible kayak and paddleboard launch
  • Sunset Point, a public park at the western tip of the property
  • High-end boat club
  • Possible wet slip lease opportunities

Proposed Marina

slide-17
SLIDE 17

Proposed Marina

slide-18
SLIDE 18

Proposed Marina

slide-19
SLIDE 19

Proposed Marina

slide-20
SLIDE 20

Proposed Marina

slide-21
SLIDE 21

Proposed Marina

slide-22
SLIDE 22

Proposed Marina

Parallel Parking

slide-23
SLIDE 23

2011 2012 2013 2014 2015 2016 2017 2018

Public access is eliminated and marina is closed (May 1, 2014) London Bay purchases the property from Sugar Mountain (April 18, 2018)

2019

Sugar Mountain purchases the property from the Weeks family and others for more than $12M

2020 2021 2022 2023 2025

First City Council hearing (April-May 2020) Anticipated City Council approval (July 2020)

2024

Marina reopens to the public (2023/2024). First residents move in.

Project Timeline

NO PUBLIC ACCESS TO THE SITE AND MARINA

Applications submitted to City

  • f Bonita Springs (Oct 2018)
slide-24
SLIDE 24

Design & Overview

slide-25
SLIDE 25

Project Overview

  • 300 independent living (or 300 residential) units
  • 75-bed AL/MC/skilled nursing
  • 1 building, 20 stories of residential over 2 stories of

parking (245' to roof) connected by a shared podium to 1 building consisting of 6 stories of residential over 2 amenity floors over 2 floors of parking (115' to roof)

slide-26
SLIDE 26

Project Overview

  • 4 buildings, 6 stories over parking (75' to roof)
  • 1 building, up to 6 stories over parking (+/- 75' to

roof) for AL/MC/SNF

  • 72 boat slips in the marina
slide-27
SLIDE 27

Our Commitments

  • Will not use Pelican Landing beach amenities for this

project

  • Provide a first-class neighborhood marina with public

access at our sole cost and expense - no funding from the community or City

  • Opportunity to open marina with first phase of

development (2023/2024)

slide-28
SLIDE 28

Moorings Park Disclaimer

While Moorings Park is our operating partner for Moorings Park Grande Lake, we do not have an agreement with an operator for this project. The following video is for illustration purposes of our current project, only.

slide-29
SLIDE 29

Moorings Park Grande Lake Video

slide-30
SLIDE 30
slide-31
SLIDE 31
slide-32
SLIDE 32
slide-33
SLIDE 33
slide-34
SLIDE 34
slide-35
SLIDE 35
slide-36
SLIDE 36
slide-37
SLIDE 37
slide-38
SLIDE 38
slide-39
SLIDE 39

Environmental Improvements

  • Clean water is a critical component of the plan
  • We will meet or exceed all local, state and federal

storm water requirements

  • The site will be designed to retain and treat water

before it leaves the site

  • Removal of existing well and septic systems
slide-40
SLIDE 40

Environmental Improvements

  • Removal of old, dilapidated structures built within the

mangrove preserve and restore these areas to natural state

  • More than 3.6 acres of wetlands and mangrove

preserve will be conserved forever

  • We are working toward qualifying the marina under

FDEP’s Clean Marina Program

slide-41
SLIDE 41

Economic Highlights

  • The project has been endorsed by the South Lee EDC
  • London Bay will pay for all public accessible facilities,

the boat ramp, and parking area

  • Total estimated financial impacts of more than $550M

during construction

  • Estimated to add approximately 4,800 jobs during

construction

slide-42
SLIDE 42

Economic Highlights

  • Continued ongoing operations of the Life Plan

Community are estimated at $28M per year by 2028

  • Continued ongoing full-time employment of a Life Plan

Community will offer 139 new jobs

  • Over $3M in potential annual tax revenue
  • Approximately $4.5M in impact and permit fees
slide-43
SLIDE 43

Traffic

308 141 89 50 100 150 200 250 300 350

CURRENT ZONING (COMMERCIAL USE) RESIDENTIAL (300 UNITS) SENIOR LIVING/CCRC (300 ILF UNITS + 75 MC/AL/SNF BEDS)

TRAFFIC COMPARISON CHART

PM PEAK HOUR TRIPS USING LATEST ITE TRIP GENERATION REPORT

54% Reduction in Traffic 71% Reduction in Traffic

slide-44
SLIDE 44

FAQ #1 (Project Specifics) Q: Who has jurisdiction over the zoning for this project? A: City of Bonita Springs

slide-45
SLIDE 45

FAQ #2 (Project Specifics)

Q: What is the status of your current applications? A: The applications for both a Comprehensive Plan Amendment and Planned Development rezone were filed with the City in October 2018. Following more than a year of detailed review by City staff, as well as Village of Estero staff and Lee County, the applications are through the staff completeness review process. We anticipate starting the public hearing process in April with final approvals possible in June/July of this year.

slide-46
SLIDE 46

FAQ #3 (Project Specifics)

Q: What is a Life Plan Community? A: A senior living community consisting of multiple levels

  • f care.

Q: Does a Life Plan Community pay ad valorem taxes? A: Yes, approximate annual tax revenue at build-out will be more than $3M.

slide-47
SLIDE 47

FAQ #4 (Project Specifics)

Q: How many years will it take to build out the project? A: Construction is anticipated to start in 2022. We estimate a 5- to 10-year build out.

slide-48
SLIDE 48

FAQ #5 (Project Specifics)

Q: If the project is a Life Plan Community, how many jobs will be created in the City of Bonita Springs? A: An estimated 139 direct, full-time jobs with an average salary of $40K to $45K per year will be created.

slide-49
SLIDE 49

FAQ #6 (Project Specifics)

There will be an additional 3,000 construction jobs created and an additional 1,800 indirect jobs over the 5- to 10-year duration of the project. The positive impact on the economy for construction will be more than $550M, and the impact for

  • peration will be more than $28M annually.
slide-50
SLIDE 50

FAQ #7 (Project Specifics)

Q: Will the project be “green”? A: Yes, the project will be certified under the standards set by the Florida Green Building Coalition.

slide-51
SLIDE 51

FAQ #8 (Public Access & Marina)

Q: How many slips and parking spaces are you providing for public use? A: 10 publicly dedicated boat slips, plus 2 additional slips dedicated to fire and police, together with 15 boat trailer spaces onsite, 34 car spaces, plus 10 additional boat trailer spaces at our offsite location less than a half-mile

  • away. Wet slips may be offered for lease or purchase.
slide-52
SLIDE 52

FAQ #9 (Public Access & Marina)

Q: When will you reopen the marina? A: It is estimated the marina will reopen in 2023 / 2024.

slide-53
SLIDE 53

FAQ #10 (Public Access & Marina)

Q: How can we be sure that the public access will not be taken away at a later time? A: The public access that we are providing is an express condition of our zoning application and will be legally dedicated to the public forever.

slide-54
SLIDE 54

FAQ #11 (Public Access & Marina)

Q: Will there be a charge to use the boat ramp? A: Yes. There will be a fee to use the ramp, and the prices will be commensurate with other similar facilities in the area.

slide-55
SLIDE 55

FAQ #12 (Public Access & Marina)

Q: Will there be slips for rent to the public? A: The publicly dedicated slips will not be available for rent, and overnight use will be prohibited. We are evaluating the possibility of using additional slips (separate from the slips dedicated to the public) for a small, high-end boat club, as well as possibly offering slips to the public for rent or purchase.

slide-56
SLIDE 56

FAQ #13 (Public Access & Marina)

Q: Will the marina sell fuel or have any other amenities? A: The marina will not sell fuel. There will be public restrooms at the marina, as well as a small ship store to sell ice, bait, and various sundries.

slide-57
SLIDE 57

FAQ #14 (Coconut Road)

Q: Who owns Coconut Road? A: The Village of Estero & Lee County

slide-58
SLIDE 58

FAQ #14 Continued (Coconut Road)

slide-59
SLIDE 59

FAQ #15 (Coconut Road)

Q: How are you dealing with traffic concerns along Coconut Road? A: We will pay transportation impact fees to the City of Bonita Springs as an offset for impacts caused by our development. Based on the peak-season analysis of an independent traffic consultant, our intended uses will result in a reduction in traffic from the current approved uses of more than 70% for a Life Plan Community (55% for residential) during peak hours.

slide-60
SLIDE 60

Traffic

308 141 89 50 100 150 200 250 300 350

CURRENT ZONING (COMMERCIAL USE) RESIDENTIAL (300 UNITS) SENIOR LIVING/CCRC (300 ILF UNITS + 75 MC/AL/SNF BEDS)

TRAFFIC COMPARISON CHART

PM PEAK HOUR TRIPS USING LATEST ITE TRIP GENERATION REPORT

54% Reduction in Traffic 71% Reduction in Traffic

slide-61
SLIDE 61

FAQ #16 (Storm Preparedness)

Q: What are the considerations for a major storm event?

A: All living areas of the buildings will be constructed above the FEMA flood elevation level and be able to withstand winds of approx. 160 mph. If the project is developed as a Life Plan Community, the operator will be required to have an evacuation plan, and will likely evacuate the residents well in advance of a storm event. Under both plans, there will be a “hardened” area within the buildings to allow residents to shelter in place.

slide-62
SLIDE 62

FAQ #17 (Water Quality & Drainage)

Q: What are you doing about water quality? A: We will have a comprehensive water management plan for treatment of water before it is released into Estero Bay. Approximately 3.6 acres of wetlands are currently subject to a conservation easement. These preserve areas are vital to maintaining the health and vitality of the estuaries and the bay.

slide-63
SLIDE 63

FAQ #18 (Water Quality & Drainage)

Q: Where will your property drain? A: The site will be designed to retain and treat water before it leaves the site. The water will discharge at a location approved by the appropriate governing bodies.

slide-64
SLIDE 64

Visit Our Website

@

www.LBHBayview.com

slide-65
SLIDE 65

Questions & Answers

slide-66
SLIDE 66