5 th Annual Don Conaway Partnering Awards Categor ory 1: Un Under $5 Million on Nom Nominee ee Project: 16-0132; ALL-117/501-10.76/4.34 District: 1 (Chris Hughes ) Prime: Bluffton Paving (Mike Gerken & Andy James ) Safety


slide-1
SLIDE 1

5th Annual Don Conaway Partnering Awards

slide-2
SLIDE 2

Categor

  • ry 1: Un

Under $5 Million

  • n Nom

Nominee ee

  • Project:

16-0132; ALL-117/501-10.76/4.34

  • District:

1 (Chris Hughes )

  • Prime:

Bluffton Paving (Mike Gerken & Andy James ) Safety project to improve sight distance and add left turn lanes at the intersection of SR 117 & SR 501/Wapak Road

slide-3
SLIDE 3

Categor

  • ry 1: Un

Under $5 Million

  • n Nom

Nominee ee

  • Project:

16-0097; VAN - Washington Street Phase III

  • District:

1 (Chris Hughes)

  • Prime:

Helms & Sons Excavating (Shane Helms)

  • Complete reconstruction of approximately ¾ mile of US 127

(Washington Street) on the south side of the City of Van Wert

slide-4
SLIDE 4

Categor

  • ry 1: Un

Under $5 Million

  • n Nom

Nominee ee

  • Project:

14-0313; LIC-CR-39-2.20

  • District:

5 (Elli Bartemes )

  • Prime:

Buds, Inc. (Brandie Scott ) Realignment of York Road/Refugee Road Intersection as well as replacement of existing truss bridge with new 4 span slab bridge

slide-5
SLIDE 5

Categor

  • ry 1: Un

Under $5 Million

  • n Nom

Nominee ee

  • Project:

16-9007; HEN-6-11.63

  • District:

2 (Lamar Spencer )

  • Prime:

Smith Paving & Excavating, Inc. (Aaron Smith ) Emergency Type A Project consisting of pavement repairs at numerous locations on a 4 lane section of the Napoleon Bypass

slide-6
SLIDE 6

Categor

  • ry 1: Un

Under $5 Million

  • n Nom

Nominee ee

  • Project:

16-4004; WOO - 199 - 27.97

  • District:

2 (Nick Zenk )

  • Prime:

Vernon Nagel (Morgan Montgomery ) Construction of roundabout at intersection of SR 199 and Roachton Road

slide-7
SLIDE 7

Categor

  • ry 1: Un

Under $5 Million

  • n Nom

Nominee ee

  • Project:

15-0278; POR - 14 - 12.55

  • District:

4 (John Mazzola )

  • Prime:

Marucci & Gaffney Excavating Company (Joe Banner ) Improving roadways in Ravenna Township, Portage County, Ohio, by widening and reconstructing SR 59 and SR 14

slide-8
SLIDE 8

Categor

  • ry 1: Un

Under $5 Million

  • n Winner

er

District 1

slide-9
SLIDE 9

Category 2: y 2: $5 $5 Million-$20 M Million

  • n Nom

Nominee ee

  • Project:

16-0130; STA - 77/30/62 - VAR

  • District:

4 (John Roberts )

  • Prime:

The Great Lakes Construction Company (Adam Dougher ) Improvements to US-30 in Stark County by planing, resurfacing (partial and full depth repairs) and micro silica overlays on 14 separate structures

slide-10
SLIDE 10

Category 2: y 2: $5 $5 Million-$20 M Mill illion W Win inner

District 4

slide-11
SLIDE 11

Category y 3: 3: $20 M $20 Million + + Nominee

  • Project:

14-0236; LUC - McCord - Grade Separation

  • District:

2 (Dan Kelsey)

  • Prime:

The Beaver Excavating Co. (Ben Geletka) Elimination of a 5 Lane road with an at grade 2-track RR crossing to assist in response times for Fire/Local Emergency Responders

slide-12
SLIDE 12

Category y 3: 3: $20 M $20 Million + + Nominee

  • Project:

13-0402; FRA - 23 - 22.23

  • District:

6 (Greg Channel)

  • Prime:

Igel/ Ruhlin (Jeremy Angel & Tim Cunningham) The “Trench” - Improving Section U.S. Route 23 in the Cities Of Columbus And Worthington by construction a thru-trench

slide-13
SLIDE 13

Category y 3: 3: $20 M $20 Million + + Nominee

  • Project:

14-0199; WOO - 75 - 2.37

  • District:

2 (Mike Benton)

  • Prime:

Shelly Company (Kirk Bostelman) 1 of 4 multi-million dollar, multi-year projects constructed concurrently with three other I-75 projects to widen I-75 from 2 lands to 3 lanes

slide-14
SLIDE 14

Category y 3: 3: $20 M $20 Million + + Nominee

  • Project:

13-0184; CUY - 77 - 9.50

  • District:

12 (Scott Slack)

  • Prime:

Ruhlin (Mark Myers) Replacing the Deck on Bridge NO. CUY-77-0950, a multiple span steel girder structure over 3,000 feet long

slide-15
SLIDE 15

Category 3: $20 Million + Nominee

  • Project:

13-0568; ALL - 75 - 0.21

  • District:

1 (Luke Johansen)

  • Prime:

The Beaver Excavating Co. (Joe Brown) Reconstruction & realignment of I.R. 75 in the City of Lima, Shawnee & Perry Townships that included a pavement option bid and reconstructing 9 bridges

slide-16
SLIDE 16

Category y 3: 3: $20 M $20 Million + + Nominee

  • Project:

14-3005; SUM - 271/82 - 12.47/3.93

  • District:

4 (Brian Dell. Jr.)

  • Prime:

The Great Lakes Construction Co. (Tom McGonigle/ Jason Fischer) Full depth replacement of mainline pavement, addition of a third lane of IR- 271, replace & widen the IR-271 bridges over SR-82, Norfolk Southern Railroad, Freeway Drive & Ledge Rd

slide-17
SLIDE 17

Category y 3: 3: $20 M $20 Million + + Winner

District 12

slide-18
SLIDE 18

Categor

  • ry 3: $

$20 M Million

  • n +

+ Ho Honor

  • rable

e Mention

  • n

District 7